Photo The other side of the component is processed in the same manner, i.e. it is degreased first then the primer is applied.

Similar documents
FLAPERON ASSEMBLY. Ref. Drawing 8XA-1 Exploded view SECTION 1 REAR SKIN AND NOSE RIBS ASSEMBLY

1Use the metal file to smooth

(Build Instructions)

Gluing windows with SABA Glasstack 760

BUILD THE. Soleil Royal. Pack 1. The flagship of King Louis XIV.

3D Fun Flyer Build Guide 30 Span

Jabiru Aircraft. Fit Ailerons

ParkJet Builder s Manual

LSS Section I PREFACE TO ASSEMBLY

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

10. Wing prep and subassembly

C-180 Builder s Manual

Kam Aero 43% Extra 300.

Hobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions

Dandy Sport Builder s Manual

NOTE: MonoKote is best-suited for medium-size models in the 2 lb. [1000g] range and up. Smaller/lighter models may

Handmade Hard-Bound Scrapbook Cover

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger

RESolution V2 Manual

Name; Juliet Kuruwaa Title; Making a windshield fearing for 9G ZAF. Date 14 th of October, 2011

INCLUDED IN THIS KIT: SPECIFICATION: NEEDED BUILDING TOOLS: REQUIRED EQUIPMENT:

ZODIAC CH 601 Series Kit Aircraft

PITTS S2S CONSTRUCTION

Step by Step Wing Bagging

Build the Spitfire: Step-By-step. Pack 7 Stages 61-71

SASKATOON, Saskatchewan

Section 6-T-3 Elevator

Build the Spitfire: Step-By-step. Pack 4 Stages 31-40

Section 75-AA-1. Flaperon Assembly

3.4 Wall Flashing Wall Flashing General

75-TA-4. Elevator Skins

Mamba. Combat Wing Glider

Building Tips This model can be built using the following types of adhesives:

Football Silhouettes Project Sheet 1 of 2: Classic Beads

WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT

NASTY Build Guide. Supplies needed

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Switchback Sport Builder s Manual

Firestone EPDM Geomembrane Installation Detail 21 Installing an Inside QuickSeam Corner Flashing

INTERNAL LININGS INSTALLATION GUIDE

MAKE IT YOURS. Digital Photo Decoupage Art. How-2 instruction books for cool projects you can make your own.

3Insert the second rod no. 4

Magpie. Foam Trainer. Magpie Specifications

COMPOSITES LAB MANUAL

BLADE REPAIR INSTRUCTION BOOKLET

12. Wings, Flaps, Ailerons and Struts

MUDGUN Drywall Finishing System

WING ASSEMBLY SLAT SUPPORT AND NOSE RIB ASSEMBLY PREPARING THE STANDARD L ANGLES SECTION 2 STOL CH 801. Compass Check

SECTION 4. REPAIRS CONTROL SURFACE FLUTTER PRECAUTIONS. When repairing or refinishing

LARK. Classic Legal Precision Stunter RSM DISTRIBUTION. presents. Charles Mackey. Wing Area 570sq. Wingspan 52.

COMPOSITES LAB MANUAL

If you intend to hang lining paper and haven't yet then see our guide to hanging lining paper.

Covering with Quarter Mil Mylar: One Way To Do It.

3Position the hull of the ship as

PSA PEUGEOT CITROËN METHODES D ESSAI MATIERES PAINT COATINGS RESISTANCE TO BIOLOGICAL ATTACKS NO USE RESTRICTION

VT-ALLROUNDER V4 1500MM CORO 3/4 Channel Trainer Airplane

4Wrap piece 7 around a rod. 5Remove piece 7 from the. 6Close up the join in both

Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2).

TOOLS & SUPPLIES (Included in ProTops Tool Kit)

GORETM SKYFLEXTM AEROSPACE MATERIALS

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Piper Cherokee /3 scale. Construction Manual

A. Provide a comprehensive guide to the products that are used when flashing, what they are used for, and the proper way to use them.

Chapter 2. Section 3- Ailerons

SPORTSTER BY FRED TUXWORTH

Metal Aircraft Landing Light Installation Instructions

Magnetpaint & Sketchpaint

WING ASSEMBLY 23.5 (Continued)

Drop Spine Box. Tricia Morris. Design by: 2006 Craft TV Weekly, Inc.

FABRICATING ARBOR. koroseal.com/arbor Arbor Veneered Components

Building Instructions

Cheeper Assembly instruction

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

STEP 1 - MEASURE YOUR WINDOW

Central. Fabric. Dot to Dot Quilt. Supplies Needed. Instructions. Skill Level 2: Experience necessary. Project Instructions

ZAGI-3C. Features a 3 Carbon Fiber Spar Matrix. New 2000 upgrade... Lighter Thinner Stronger Faster!

Comet Kit Tissue Guide

Above are the offsets for the plywood panels.

Pfalz E1 48. R/C Scale Model Instructions CONTACT INFORMATION. The Pfalz E1 was designed by M.K. Bengtson Prototype by Jack Richardson

Carbon Fiber Skinning Starter Kit

Required Tools: Hobby Knife (# M917) Philips #1 Screwdriver Sanding Block (150grit) Pliers/Wire Cutters

Magpie AP. Aerial Photography Airplane

American Champion Aircraft Corp. Rochester, WI Page 1 of 5

SAW-PIERCING. 79. Fig. 29. Placing new blade in saw-frame.

Instructions for Making Repairs to 3M 8681HS Blade Tapes Installed on Enstrom Helicopter Blades.

Building the Fairchild "24" by JOSEPH S. OTT Model Editor

Building a Scarab 350 Trimaran

Stearman PT-17 KIT WARRANTY

unit 3: GENErAL ElectriCAL SySTEM DiAGNOSiS

January Instructions Willem van Aelst Study 2008 David Jansen. For the Video Link, Please see Page 3

Nick Limber s Debby. Debby Gas Job *** *** By Nick Limber

Pre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips

Parts List. Description. Installation Instructions

Inside F5J. Assembly Manual

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Transfer an Image to Drawing Paper

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont

Transcription:

Photo 24 1. Leave the covered portion of the component for approximately 5 hours until complete hardening of the sealant. The sealant hardening time depends upon humidity and ambient temperature and may be as long as 3 to 5 hours. 2. The other side of the component is processed in the same manner, i.e. it is degreased first then the primer is applied. Photo 24_1 3. Wrap the lower portion of the fabric around the trailing edge, mark using pencil and cut (photo 24_1), then apply sealant on the trailing edge first, spread it with toothed spatula and lay the fabric over it. The laid fabric should be pressed with solid roller through polyethylene strips and left for 1 hour for the sealant to dry. Page 1 of 14

Photo 25 4. Put the paper sticking tape on the leading edge skin along the marked line and on such areas as hinge fittings, to prevent sealant from getting on the clean surface (photo 25). Photo 26 5. Put preliminarily the fabric on the component (photo 26), mark and make cut-outs around hinge fittings (photo 26, 27). Page 2 of 14

Photo 27 Photo 28 6. After making necessary cut-outs remove the fabric and apply the sealant in the same manner as on the other side, i.e. in small portions, and spread with the toothed spatula (photo, 28, 29). Page 3 of 14

Photo 29 * On the end rib sides the fabric is laid over the portion of the rib and fabric with applied primer and covered with fabric (photo 29). Photo 30 In length the pre-cut fabric must overlap the entire rib width as shown in photo 30. Page 4 of 14

Photo 31 7. Lay the fabric over the areas with applied sealant and press it with solid roller through polyethylene strips (see photo 31, 32, 33). Photo 32 (fold the fabric over the spar in the area of hinge fittings as shown in the photo) Page 5 of 14

Photo 33 (make 15 mm cut out in the fabric for the doubler as shown in the photo above) Photo 33 (at end ribs the fabric may be pressed down using a towel) 8. When the covering of component with fabric is finished, remove the sticking tape and let the sealant dry completely, approximately for 6 hours. Page 6 of 14

Photo 35 9. Fold the lower portion of the fabric over the trailing edge to determine the necessary length, mark and cut using zigzag scissors. The fabric edge must reach exactly to the rivets (red line on photo 35). 10. Apply the sealant on the trailing edge covered with fabric, spread it using toothed spatula, fold the lower portion of fabric on top and press it down using the solid roller. Photo 36 11. Before thermally shrinking the fabric puncture it with soldering iron at drain holes (photo 37). Page 7 of 14

Photo 37 12. One day later the fabric is shrunk thermally using an iron with temperature regulator set to cottonline mark. Press the fabric with the iron gently, to avoid burning it through. Press the fabric along the trailing edge and ribs first (photo 37) smoothing out wrinkles that appear in the fabric, then inside the square and thus along entire component. Photo 37 Then press the fabric over the end ribs (photo 38). Shrink the fabric in the same way on the other side too. Make sure that the fabric did cemented. Page 8 of 14

Photo 39 13. Before applying primer clean the component with an air gun (photo 39). Photo 40 14. Apply 2 layers of Cecofill primer (using mohair brush 1-29-911 of Stanley company). First apply the first layer of primer along the leading edge skin and end ribs (photo 40). Page 9 of 14

Photo 41 Then apply the primer over entire surface by circular motions as shown on photo 41. Photo 42 (* in areas with poor access it is better to apply the primer with a thin brush) Page 10 of 14

Photo 43 After that spread the primer evenly over entire surface and along the airflow using the mohair brush (photo 43). Photo 44 15. After applying primer on one side let the component dry completely (photo 44), approximately for 2 hours. After drying smooth out the primed surface with sandpaper. Do it using gentle motions. 16. Then apply the second layer and let it dry completely. The second layer is applied like the first one and smoothed out after drying with sandpaper. Page 11 of 14

17. The other side is covered with primer in the same manner, i.e. apply first layer of primer, smooth out, then second d layer, leave it to dry completely and smooth out. * Covering of the wing is carried out similarly to elevator, in accordance with the drawing (Appendix 2, photo 45-49). Photo 45 Page 12 of 14

Photo 46, area II Before covering rework the areas of wingtip joint with trailing edge and skin (photo 46, areas I and II). Scrape with coarse sandpaper 40 and apply the polyester primer of U-POL company. Photo 46 Photo 48 Photo 49 Page 13 of 14

Appendix 1 Page 14 of 14