WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

Similar documents
Metro - Let me know about major weekend traffic impacts

2018 District 1 Highway Construction Program

This page is intentionally left blank

Plan Preparation Checklist

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

2007 Year Review File: c Date: December Slide Location

Driving directions during the closure of Business 40 for the following downtown Winston-Salem facilities in Innovation Quarter:

ABC and Innovative Bridge Construction for Minnesota Local Roads

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Updated: April 7, 2016

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

Charlton/Oxford Route 20 Reconstruction Project

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Planarization & Routing Guide

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Porter County Plan Commission

Civil Engineering Overview

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

OVERVIEW SITE/PROJECT DESCRIPTION

The Shoppes at Forney Crossings

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

Deep Creek Canyon US Highway 12

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

San Francisco Randonneurs - King Ridge 400K Start Time XXXX (xx:xx xm) - 27:00 hour time limit

DESIGN PUBLIC HEARING

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

AccuGrade Compaction. Candace Young. Global Paving - Minneapolis. GPS Mapping & Measurement. Global Paving

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

Current Standard Plates including Transmittal Letters are available on the web at:

CHAPTER 7: ALIGNMENT

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

CONTRACT PLANS READING

MnDOT Contract Exhibit A - Scope of Services

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

CITY OF MUSKEGO DRAFTING STANDARDS

June 5, The following persons signed in as being present in the audience:

2012 MnDOT Greater Minnesota Construction Projects

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

Eagle Bluff Elementary Pre-K. (This route operates Monday Thru Thursday)

Locate Request Information

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

TABLE OF CONTENTS 1200 PLAN PREPARATION

DIRECTIONS TO TESTING SITES:

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

Some of the notable locations on the refuge to photograph at:

Amajor transportation infrastructure undertaking, billed

SCOPE OF WORK AND DELIVERABLES T.H.

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

CHIPPEWA FALLS. Chippewa Falls High School 735 Terrill Street Chippewa Falls WI 54729

DEVELOPMENT PLAN CHECKLIST

CITY OF DANA POINT DEVELOPMENT REVIEW

Project Name: County File No.: Checked by: For: Date:

Article 4.0 Measurements and Exceptions

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

TEO Signal Committee Meeting Minutes Meeting Date: 02/09/06 Waters Edge Conference Rm A Meeting Time: 9:00am - Noon. Meeting Attendees: Old Business

SECTION 6A ROADWAY PLAN PREPARATION

CLINTON CLOSURE DETOURS

2017 San Juan College Luminarias 6:00pm - 11:30pm

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

CHAPTER 11. Plan Standards

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

REQUEST FOR PROPOSAL

IFPAA Field Directions

FHWA/TX-03/ Title and Subtitle INTERSECTION VIDEO DETECTION MANUAL. September Performing Organization Code

Construction Documents (CDs) Checklist

JERSEY SHORE BEACH BLAST

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

Exit 61 I-90 Interchange Modification Justification Study

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Welcome Public Open House

Guide Sign Policy for Secondary State Highways Edition

100,000± SF OFFICE FOR LEASE AT FORMER MACY S SITE

PHASE ONE PROJECT REPORT

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Proposed Watertown Plan Road Interchange Evaluation Using Full Scale Driving Simulator

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Transcription:

WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016

Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum St (TH 58) 3rd St

3rd Street Cycle Track

River Bridge Spire Signage Daytime - Elevation View from Bridge Deck Nighttime - Elevation View from Bridge Deck Daytime - Elevation View from Bridge Deck Nighttime - Elevation View from Bridge Deck

Landscape and Streetscape Design Legend 40 Mn Legend 40 MnDOT Light 25 City Light 15 City Light Banner Pole

Landscape and Streetscape Design Legend Legend 40 Mn 40 MnDOT Light

Staging - 2017 Stage 1A Construction Begin construction of River Bridge Surcharge the poor soils for Wisconsin embankment Construct temporary bridge over Hwy 61 Construct button-hook ramp Construct Hwy 61 north of the temporary bridge Construct cul-de-sac Traffic Hwy 63 traffic remains on existing River Bridge One lane traffic each way on Hwy 61 825th St closed at River Bridge and traffic detoured

Staging - 2017 Stage 1B Construction Continue construction of River Bridge Surcharge the poor soils for Wisconsin embankment Continue construction of temporary bridge over Hwy 61 Construct Hwy 61 north of the temporary bridge Traffic Hwy 63 traffic remains on existing River Bridge One lane traffic each way on Hwy 61 825th St closed at River Bridge and traffic detoured

Staging - 2018 Stage 2 Construction Continue construction of River Bridge Construct new bridge over Hwy 61, slip ramp, slip ramp bridge, 3rd Street, and Bluff Street Traffic Hwy 63 traffic remains on existing River Bridge and routed onto temporary bridge and button-hook ramp to new signalized intersection with Hwy 61 825th St closed at River Bridge and traffic detoured Plum/3rd Street intersection changed from traffic signal to all-way stop 3rd St closed, traffic allowed thru at Potter St for majority of Stage 4 week closure of 3rd/Potter St intersection

Staging - 2019 Stage 3 Construction Continue construction of River Bridge Construct Hwy 63 in Wisconsin Construct Wisconsin box culvert Construct 825th St W Traffic Hwy 63 traffic remains on existing River Bridge and routed onto temporary bridge and button-hook ramp to new signalized intersection with Hwy 61 Two lane traffic each way on Hwy 61 825th St closed at River Bridge and traffic detoured 3rd St and Bluff St open Slip ramp closed

Staging - 2020 Stage 4A Construction Construction of River Bridge complete, remove existing River Bridge Construct Hwy 61 under Hwy 63 bridge Remove temporary bridge Traffic Hwy 63 traffic on new River Bridge One lane traffic each way on Hwy 61 825th St open at River Bridge to right in, right out access only. All other traffic detoured. Highway 63 complete in Minnesota & Wisconsin, including slip ramp

Staging - 2020 Stage 4B Construction Construction of River Bridge complete, remove existing River Bridge Construct Hwy 61 under Hwy 63 bridge Traffic Hwy 63 traffic on new River Bridge One lane traffic each way on Hwy 61 825th St. West open at River Bridge to right in, right out access only. All other traffic detoured. Highway 63 complete in Minnesota & Wisconsin, including slip ramp

Staging - 2020 Stage 5 Construction Construction of River Bridge complete, remove existing River Bridge Construct median on Highway 61 Construct 825th St E Traffic Hwy 63 traffic on new River Bridge One lane traffic each way on Hwy 61 825th St open at River Bridge to right in, right out access only. All other traffic detoured. Highway 63 complete in Minnesota & Wisconsin, including slip ramp

WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House November 2016

WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House November 2016 WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House November 2016