BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Similar documents
RAPID-EPS SAFETY INSTRUCTIONS AND INSTALLATION GUIDE. American Standard OSHA

Installation of Balustrade Systems

Installation Instruction

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

Quill Stop V2 Installation Guide 11/16/2014

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

Assembly Instructions for Model: VMPL3

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Dublin Stalls Installation Instructions

Track Rack. * Track Racks are not lockable

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

Installation Instructions

Gazebo ASSEMBLY INSTRUCTIONS. Urban

The New Unrivalled SRB Titan Magnet Clamps & Spartan Composite Adjustable Sideforms

ALL SEASON PATIO COVER

LOWLINE SINGLE FOLD DOWN WALL BEDS

a.k.a. casegoods instructions

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

INSTALLATION INSTRUCTIONS for the JOMY RETRACTABLE LADDER. If there are any questions, please call (800)

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Thanks for shopping with Improvements! Deluxe 10 Closet Organizer (12 deep) Item #461609

Deck Mount Installation with Bench

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

N. 15th Street, Middlesboro, KY LOCK-N-ROLL INSTALLATION INSTRUCTIONS

Door window. Front door window, assembly overview

Ford Pick Up Rear leaf Spring Kit Installation Instructions

11 6 Round Building Assembly Instructions

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

KOLO SHELTER Installation Instructions Parts List

ZROADZ Grille series - LED Installation Guide

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

Assembly and Installation Guide

IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE

Dura-Lock Roof System

Products for fixing to Steelwork and Decking

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

FIXED MOUNTING SHUTTERS INSTALLATION

Installation and Assembly - Articulating Swivel Double-Arm for 42" - 71" Plasma Screens

MODUS 770 AND MODUS 1280 (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

INSTALLATION INSTRUCTIONS

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

96 (Standard Length)

SM-RAZOR-ART2-L / SM-RAZOR-ART2-XL

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

WPS crew Doors Installation instructions

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Installation Manual for Metal Toilet Partitions Standard Series

INSTALLATION INSTRUCTIONS

DO35 MAINTENANCE INSTRUCTIONS

Oxford Stalls Installation Instructions

Installation Instructions for: Saris Cycle Aid. Saris Cycle Air. Saris Cycle Air HD

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

mila-wall (Series100) General Operating Instructions page 1 of 15

VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

Installation Instructions

CROWN IMPERIAL ASSEMBLY INSTRUCTIONS

Installation Instructions

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

TABLE OF CONTENTS REQUIRED TOOLS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Storage Cabinets 9000 Series Assembly Instructions

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

Optimast Installation Method Statement. F108.

Kai Installation Instructions

INSTRUCTIONS TS93 GSR PT RIGHT HAND ACTIVE LEFT HAND INACTIVE RIGHT HAND INACTIVE LEFT HAND ACTIVE

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE:

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

Bumper Sign INSTALLATION INSTRUCTIONS

Connector Technology, Shelf Supports Connection Fittings

Install Instructions. NewAge Steel Welded Tall Locker

BIKE FILE (301)

INSTALLATION INSTRUCTIONS

F l a t S c r e e n A R M S I n s t a l l a t i o n

Gared Pro-S Portable Backstop

DUTCH GABLE FREESTANDING CARPORT

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

Mounting Instructions Item No.: xxx

FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS TF Tent Flooring System. 125 Taylor Parkway Archbold, Ohio Phone: (419) Fax: (419)

19 to 39 TV WALL MOUNT - FULL MOTION

ROOFSAFE ANCHOR & CABLE

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2

12x12 Pavilion. Assembly Manual

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

F-150 Structural Holding System

Transcription:

Working with Concrete Slabs When working with concrete slabs the barrier protection can be erected in three ways - with socket bases, adjustable slab edge brackets and multi slab clamps. Socket Bases 1 Drill a ø20mm hole 70mm deep no less than 200mm from the slab edge. Ensure that sharp, accurate and well maintained drill bits are used. Blow out any debris from the hole after the drilling stage. 2 Insert the M16 anchor. The anchor must sit flush with the slab surface and not sit above.

Socket Bases continued... 3 Set the anchor with the setting tool. Hammer the tool until solid resistance is encountered. Note: If the anchor is installed below the surface then the stud can be reversed. 4 The socket base studs should be fitted as shown. The longer threaded portion fits into the base.

Socket Bases continued... 5 Thread the socket base into the anchor until the base section is sitting flush with the concrete surface. 6 Tighten the socket base with the KGUARD spanner until fully tightened.

Adjustable Slab Edge Brackets Multi-Slab Clamp 2 Ensure the clamp is vertical when fully installed. 1 Place the adjustable slab edge bracket into position and fix the bracket with 2 x 12mm bolts to stop any possible rotation. 1 Fit the clamp flush with the slab and tighten the jack nut. Use a hammer to fully tighten the jack nut.

Working with Formwork Deck Protection can be provided with two types of Aluminium beam clamp and Timber beam clamps. Clamp Types Secondary aluminium beam clamp Primary aluminium beam clamp Fitting ALUMINIUM 1 Ensure beam clamp lip is fully engaged. Secondary timber beam clamp Primary timber beam clamp 2 Slide nut assembly until U section lip bracket engages then tighten nut and tap with hammer until resistance is met. TIMBER

The centres of the Aluminium and Timber beam clamps should be at least 150mm in from the end of the supporting beams. All beam clamps should only be fixed in position to the supporting beams that are at right angles to the Guard Barrier mesh. A typical scheme is shown. Note the positioning of the two clamp types. Note: Ensure formwork has been correctly assembled to manufacturer s specification and all beams are correctly assembled together. Standard Aluminium Beam Clamp Secondary Beams Primary Beam KGUARD barriers fitted to incorrect clamping points would not support the required loading. Primary Aluminium Beam Clamp Always use the primary beam clamps for the primary beam fixing and secondary beam clamps for the secondary beam fixing.

Working with Structural Steelwork Edge protection can be fitted to steelwork using temporary KGUARD I-Beam clamps, web clamps or pre-fabricated sockets welded to the steel prior to erection. KGUARD I- Beam clamps come in two sizes to cover flange widths from 102 to 700mm and flange thickness upto 100mm. Both clamp sizes can accommodate steel beam heights up to 1000mm. Fitting the Standard/Maxi I-Beam clamp 2 Push fixed jaw against beam flange. 3 Push sliding jaw against beam flange, screw jack nut and hammer tight. 1 Standard/ Maxi Clamps are fixed onto steelwork up to 2400mm centres.

Fitting the Standard/Maxi I-Beam clamp continued... 5 Adjust height of post until Bissel pin sits level with the beam top surface.! Bissel Pin Level with Top of Beam 4 Move post holder close to edge and bolt. Hammer tighten wing nut.

Adjustable I Beam Attachment Brackets are bolted onto the steelwork beam webs up to 2400mm pre drilled centres. Single Bolt Fixing Pre-Drilled Holes Pre-fabricated Sockets Sockets are welded onto the steelwork up to 2400mm centres either during fabrication or on site before erection. Sockets must be welded all round with a min 4mm fillet weld. Note: Welding must be carried out by a competent, suitably qualified mig welder. Bissel Pin Level with Top of Beam Hammer Tighten Wing Nut Shown

Adjustable KGuard Installation I Beam Attachment Guide Step 1. Safety Post insertion into KGUARD socket fixings Insert Safety Post and rotate post in any direction to activate the double K-Lock Safety System.

Step 2. Installation of Guard Barriers onto Safety Posts Place Guard barriers onto the Safety Post housing bracket then secure by locking the safety post latches into the vertical position. Ensure the Guard Barriers are installed with the toe board label/logo brand side facing towards the Safety Post.

Step 3. Adding Extension Height Guard Barriers Remove the Safety Post plastic cap and insert the KGUARD Extension Post. Ensure that the holes of the Extension Post spigot section are correctly aligned with the top hole of the Safety Post and lock in position using the KGUARD locking pin. Place the KGUARD Extension Barrier onto the Extension Post housing bracket and lock the safety latches in the vertical position as detailed in Step 2.

Step 4. Optional fixing of the KGUARD Safety Inspection Tag Locate and fix the KGUARD Safety Inspection Tag through the latch plate hole slot with a plastic tie clip or similar.