Installation Guidelines

Similar documents
Installation Guidelines

Installation Guidelines

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Manual 0318

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

Shapes Siding. Perfection Shingles. Chalk Line

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

INSTALLATION PROCEDURE

Aluminum Siding System

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Install Windsor Corners

COMPOSITE SIDING INSTALLATION GUIDE

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Installation Manual SOLID CORE SIDING

Installation Guide 2016

eco-shake INSTALLATION INSTRUCTION

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

SIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Slate Shingle Specifications

Chapter 17 - Porch Trim

Siding Components. Installation Guide

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

AIA Specification. Section Slate Shingles PART 1 GENERAL

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

INSTALLATION INSTRUCTIONS for EVERROCK SKIRTING

PRIMED STRAND REVERSIBLE SHAKE

Inspired by Nature NEXTSTONE INSTALLATION MANUAL

TECHNICAL BULLETIN. 7/2017 CertainTeed Corporation

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Ekoroof LiteTile Dimensions

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

A P P L I C A T I O N I N S T R U C T I O N S

Shingle Installation Guide

10 Octagon Cedar Gazebo Assembly Instructions

SLATE & SHINGLE INSTALLATION

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION

Turada Hardwood Shingles and Shakes Installation instructions

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements

Engineered Hardwood Flooring Installation Instructions

INSTALLATION INSTRUCTIONS

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

Inspired by Nature NEXTSTONE INSTALLATION MANUAL

Gambrel Barn with Overhang Manual

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

DIRECTIONS FOR APPLICATION

Cambridge English Application Instructions

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

Shed Assembly Instructions

Storing, Handling, and Cutting Steel Panels

Tools required by installer: Materials required by installer:

Gambrel Barn Construction Manual 8x8 through 16x24 Units

CONTENTS. Forward Important Notes 4. Product Line Basic Tools and Equipment Preparing the Wall

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

ROOFING APPLICATION STANDARD (RAS) No. 130

Chapter 11. Siding and Soffit

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Inspire Aledora Slate Application Guidelines

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation Guide. Grayne.com

Five Star Panel Installation Instructions

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

Sliding Glass Door Assembly and Installation Guide

Steel Reinforced Joining Guide (Horizontal / Vertical)

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Effective February, 2015

LuxCore Installation Instructions

Installation Guide - Evolution Series Wood Siding

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Chapter 9. Windows and Exterior Doors

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Roofing Training - Basics. Sandy Wesch

ASC Building Products. Table of Contents

REGAL. Installation Manual

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

KuraStone TM Installation Guide

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

Transcription:

Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The contractor and/or installer shall be responsible for ensuring that all applicable local building codes are followed, which may require modification of these general guidelines. Exteria Building Products assumes no liability for personal injury or property damage resulting from improper or careless application of the described techniques. For more information on Exteria Building Products and its wide variety of state of the art products, please call us at 877 EXTERIA (877 398 3742) or write: 1111 NW 165 Street, Miami, FL 33169 5819. Installation Guidelines can be downloaded from our website: www.exteriapb.com. WI QPC 1011 REV Page 1 of 7 HAND CUT STONE

BASIC GUIDELINES 1. Always work from left to right, completing installation on one wall before beginning another. Always starting at the lowest point of the structure. 2. As with any plastic composite exterior building materials, Exteria Building Products panels will expand and contract with a change in temperature. Therefore, during installation it is necessary to position the panels properly to compensate for temperature effects. Use caution not to force panels down onto the flange of the lower row, as this will override the expansion joints and may cause buckling. Storing panels in heated areas make them more pliable, allowing for easier installation in colder temperatures. 3. Store panels on edge, do not stack flat. 4. Exteria Building Products panels are intended for use in a vertical placement only, and are not designed or warranted for roofing or flooring applications. Mansard roofs with a 45/12 slope or greater are acceptable applications. 5. It is essential that you work over a smooth, flat, nailable wall surface, (i.e. Minimum of 7/16 OSB board or plywood is recommended). 6. Non corrosive fasteners are required to secure the panels and they must penetrate the solid substrate by at least 7/16. 7. If face nailing is employed, pre drill a hole in an inconspicuous area, such as a mortar joint. The hole must be larger than the shank of the nail or screw, but smaller than the head, to allow for possible expansion. The head can be covered with matching caulk. 8. Fastening the panels should not restrict panel movement. Fasteners should be driven straight into the center of any elongated hole making light contact with the panel, allowing the panel to be hung. It is best to work with the panels at waist level, allowing the installer to inspect the back of the panels, verifying that all fingers are properly engaged. 9. Overriding the expansion joints may restrict panel movement and cause buckling (Figure 4). The panel requires a minimum of five fasteners per panel. A closer spacing of fasteners is required for high velocity wind areas; for details refer to report ESR 3070, which can be downloaded from our website www.exteriabp.com. 10. Do not install all corners at one time, or you will lose the ability to adjust and properly align them to the panels. It is recommended not to install more than two corners at a time. 11. Siding has always been designed as an exterior cladding. Exteria Building Products siding is designed to allow the material underneath it to breathe; therefore, it is not a watertight covering. To achieve designed performance, Exteria Building Products siding must be installed over a weather resistant house barrier system such as house wrap. WI QPC 1011 REV Page 2 of 7 HAND CUT STONE

INSTALLATION STEPS STEP ONE Install the starter strip at the lowest point of the structure. The structure s solid substrate must be no less than 7/16 thick. The strip should be positioned 4 from the wall corner allowing for the width of the corner piece (Figure 1). Fasten the starter strip at a minimum every 12. Make sure the starter strip remains level. A chalk line is recommended. STEP TWO Determine the number of panels needed for the wall by measuring the total length of the wall in inches, subtracting the width of the corner pieces used and dividing by 39 ¼ (the width of one panel exposed to the weather). As you will need to cut the end panel, ensure that it remains at least 12 wide by reducing the size of the starting panel. However, be sure not to overlap the mortar joints of the panel below to ensure a pleasing and authentic stone look is maintained. Do not cut more than one end piece at this time since adjustments will be required for succeeding rows. STEP THREE: Working from left to right, install the first stone corner approximately 1/8 below the bottom edge of the starter strip. Slide the first panel left, butting it flush to the corner (Figures 2 and 3). Set the first panel gently onto the starter strip making sure to properly engage all installation fingers (Figure 4). Slide panel left, butting to within 1/16 of the corner. With Stone panels, be sure to match the horizontal mortar line with the corner. WI QPC 1011 REV Page 3 of 7 HAND CUT STONE

Note: The Stone panels have a random pattern and are not designed to match the mortar lines of the corners. You must apply a bead of mortar fill at corner/panel alignment when done (Figure 3). STEP FOUR: Drive nails straight through substrate while ensuring that the nail head only makes light contact with the panel. Hook the next panel into the starter strip and slide it into the first panel. Install the remaining courses repeating steps 1 3. In order to achieve a realistic look of stone, stagger each subsequent course in increments of 8 (Figures 5). Never force panels down on top of each other. Set them down gently and firmly, but not with excessive force, ensuring that every finger is engaged, and allow the panels to seat themselves. Ensure that the panel is seated correctly to provide the best aesthetics. Hint: Installation is easier by elevating the right side of the panel slightly. Be sure all locking fingers are properly engaged. STEP FIVE When installing the Stone panels to corners or J channels, it may be necessary to trim the installation fingers, spacers and channels on the back of the panels within 3 of the corner or J channel WI QPC 1011 REV Page 4 of 7 HAND CUT STONE

for a better fit (Figure 6). J channels are made to match the mortar color and are available with the required 1 1/8 pockets. STEP SIX Note: Exteria provides a positive stop at the chamfer interface and the installation fingers on the back of the panels. Do not force the panels beyond the chamfer when installing succeeding rows. The chamfer is designed to prevent buckling due to changing temperatures. The panel requires a minimum of six fasteners per panel. When attaching the fasteners, be sure they only lightly touch the panel, allowing the panels to move with varying temperatures. The fastener must be installed flush with the panel, so as not to interfere with the succeeding row of panels. STEP SEVEN Note that panels may expand or contract up to ¼. Normal mortar line spacing is approximately ½. If the temperature is about 30 F, posi on the panels so the mortar line between them is about 5/8 wide to allow for expansion in warmer weather. If the temperature is about 60 F, decrease the spacing to about ½ thereby allowing for both expansion and contrac on as the temperature changes. If the temperature is about 90 F, decrease the space further to 3/8 to allow for contraction in colder weather (Figure 7). Figure 7 TEMPERATURE PANEL SPACING 30 Degrees F 5/8 60 Degrees F ½ 90 Degrees F 3/8 STEP EIGHT Fitting panel pieces between windows or around openings requires a cut back spacing of 1/8 when panels are installed in colder temperatures. Similar spacing may also be necessary when fitting panels into gable ends, over roof angles, around light blocks or any other place where adequate panel movement is prevented. STEP NINE For best results, alternate the start of each successive row of panels by 8 increments. Be sure the right end piece of the row is no less than 12 wide. WI QPC 1011 REV Page 5 of 7 HAND CUT STONE

STEP TEN Exteria J channels may be used for inside corner treatments or you may scribe and cut panels to fit into the corner. It is recommended to sleeve the corner with vinyl or aluminum coil prior to installation of panels (Figures 8 and 9). Caulk corner after installation. Accessories like our ledge trim may likewise provide a pleasing aesthetic result. STEP ELEVEN When completing a wall, face nailing may be necessary. If face nailing is employed, pre drill a hole in an inconspicuous area, such as a mortar joint. The hole must be larger than the shank of the nail or screw, but smaller than the head, to allow for possible expansion. The head can be covered with matching paint, or Exteria mortar fill. INSTALLING STONE LEDGE TRIM Exteria Stone ledge trim installs over the top course of panels. BENDING LEDGE TRIM Exteria ledge trim can be heat bent and installed around a corner. Before applying heat you must first cut out a v notch from the ledge trim piece at the point where you plan on bending it (Figure 10). Because of the different shapes of the Stone, unique notches must be made before the ledge trim can be heat bent and installed on an outside corner (Figure 10). We also provide pre manufactured corners to make installation easier (Figure 11). Figure 11 WI QPC 1011 REV Page 6 of 7 HAND CUT STONE

REMINDERS: Some adjustment may need to be made at the vertical overlap of two corners (as they are installed) in order to maintain the corner/panel horizontal alignment. There is approximately a ½ vertical adjustment available. Be sure to apply a beading of mortar fill where stone panels and corners meet (See figure 3) ATTACHING OBJECTS TO PANELS Never attach fixtures directly to Exteria siding. When attaching fixtures, use a block and first drill a hole slightly larger than the shank of the fasteners, allowing for expansion and contraction. Note: Follow the fixture manufacture s installation instructions. Fitting panels between windows or around openings requires a cut back spacing of approximately 1/8 to allow for product expansion. SITUATION 1. Panels wont lock together side to side 2. The bottom locking fingers won t lock into the previous row. SPECIAL SITUATIONS AND SUGGESTIONS ITEMS TO CHECK The wall may not be level and flat. Check previous panels to ensure that all panels and installation fingers are properly seated. (See Basic Guidelines) 3. Panels are buckling on the wall. 4. Panels are not laying down flat. Make sure the nails are not restricting panel movement. Check for proper spacing between adjacent panels. Make sure all fingers are engaged into previous panel. WI QPC 1011 REV Page 7 of 7 HAND CUT STONE