HSD-LD-US 06/13 Page 1/5. Components

Similar documents
Product Guide Specification

HALFEN Framing channels as compression elements HALFEN SHEAR DOWEL SYSTEMS HSD 13.1-US

CI/SfB (29) Et6. October Lockable Dowels For Temporary Movement Joints

Lockable Dowels. for Temporary Movement Joints in Post-Tensioned Concrete. A cleaner, safer, faster alternative to Pour Strip s.

Lockable Dowels For Temporary Movement Joints in Post-Tensioned Concrete. A cleaner, safer, faster alternative to Pour Strip s CI/SfB (29) Et6

Concrete Connections. MeadowBurke

CI/SfB (29) Et6. January DSD/ESD Shear Load Connectors for the Construction Industry

TECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

CI/SfB (29) Et6. July DSD/ESD Shear Load Connectors. for the Construction Industry

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

Segmental ring types provided by F P McCann: Segments in stock are front bolted. Back bolted segments are available to order: Cross joint Corbel Ring

Product Guide Specification

Moment Resisting Connections for Load Bearing Walls

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

1. In the Y direction: to the vertical axis of the wall (middle of the wall)

FRANK. Technologies for the construction industry. Egcodubel Shear force dowel for low and middle loads

Section 914. JOINT AND WATERPROOFING MATERIALS

1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7.

GENERAL ISOMETRIC LAYOUT

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground

42 SENTRY LIFEGUARD STAND

TECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic

GLOSSARY OF TERMS SECTION 8

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

Shear force transmission in expansion joints

BC-SERIES Screw-Jack Pedestal for Creative Design. Specifications text. Menu. Page 1/7

Diamond Dowel. Load Transfer System INDUSTRIAL SLAB ON GROUND

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements

Residential & Industrial Fence

Plate 60 ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND. Plate 60 AmourMate. Joint Edge Protection

SINGLE & DOUBLE WIRE LOOP BOX HM-D-80/100/120

Thread protection accessories are installed at the MODIX production factory and delivered with couplers.

LaserSnake Development of Multi-Skin Cutting Techniques Phase 1: Preliminary Study Deliverable D3.29 TWI

Installation Instructions

CI/SfB (29) Et6. September Reinforcing Bar Couplers for the Construction Industry

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

CONCEALED HOOK CONNECTORS UV-T / UV-C

SUBSTATION SECURITY WALL INSTALLATION MANUAL

Butt Two pieces of wood meeting with flat sides adjoining usually at right angles. Some type of connector is needed to prevent movement.

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

Bracket guide. LK Pipe Pole. LK Radiator fixture Uni

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

Hyper ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND

CI/SfB (29) Et6. March Reinforcing Bar Couplers for the Construction Industry

Special Provision No. 999S29 May 2010

Big expertise. Real convenience. Concrete commitment. stem

JVI Vector Connector

1.1. THREADED SLEEVES for different fixing purposes

INSTALLATION INSTRUCTIONS

International Version CI/SfB (29) Et6. June MBT Mechanically- Bolted Couplers for the Construction Industry

The Vienna Trellis. Tools You Will Need. General Information

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

Experience the Hi-Lite Advantage

PREPARATION & TOOL CHECKLIST

Open Up Your View With CABLE SYSTEMS

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

USER S MANUAL. Horizontal inclinometer system Model TES-AN-25H

The Westchester Arbor

STRUCTURAL ATTACHMENTS

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

HPD Aerated concrete anchor. Approvals / certificates. Basic loading data (for a single anchor)

FEET, WHEELS, FLOOR FASTENINGS, SUPPORTS

SECTION CONCRETE ANCHORING. Display hidden notes to specifier. (Don't know how? Click Here)

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

INSTALLATION INSTRUCTIONS

FUSELAGE CONSTRUCTION

Track Rack. * Track Racks are not lockable

DOCK WEDGE - STANDARD

Lid, Floor Monument and Two Installation Fixtures. Floor Monument Installed with Lid On and Off

Construction. Sika Grouting Systems. Properties of Grout. Grouting Considerations

HALFEN HSC STUD CONNECTOR HUC 10-US CONCRETE

Schöck dowel Type SLD plus

HALFEN HEK PRECAST COUPLER

HP 2 SERIES Integral Driver - Solid State LED

SECTION MANUFACTURED CASEWORK

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS for the JOMY RETRACTABLE LADDER. If there are any questions, please call (800)

TREX POST MOUNT DECKING AND CONCRETE

Installation manual. For setting in concrete/on base plates - Panel height 1830

Plastic Welding Experiences

One-sided rack, hot-dip galvanized Space between bicycles 350 mm length approx.kg Part-No. Two-sided rack, hot-dip galvanized

GARDEN SHED BRIGHTOLN

Installation BT Coupler

INSTALLATION INSTRUCTIONS

MeadowBurke. Erector Connector. The redesigned Erector Connector eliminates seismic tension fatigue and cracking with only one weld

British Columbia Carpenter Apprenticeship Program

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

INSTALLATION INSTRUCTIONS

RakeMaker I Instructions

Outdoor equipment. Barrier posts. Stainless steel. Barrier elements. Barrier poles. Outdoor equipment - pages

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

BIKE FILE (301)

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

Transcription:

Page 1/5 Components HSD-LD-Set: HSD-LD-S The HSD-LD-Set consists of HSD-LD-D Dowel Component, the HSD-LD-S Sleeve Component, the Locking Plate and the HSD-LD Epoxy Resin. HSD-LD-D Dowel Component HSD-LD-ULTRA-Set: HSD-LD-ULTRA-S The HSD-LD-ULTRA-Set consists of HSD-LD-ULTRA-D Dowel Component, the HSD-LD-ULTRA-S Sleeve Component, the and the HSD-LD Epoxy Resin. HSD-LD-ULTRA-D Dowel Component HSD-LD-W-Set: HSD-LD-S The HSD-LD-W-Set consists of HSD-LD-W-D Dowel Component, HSD-LD-W Threaded Anchor, HSD-LD-S Sleeve Component, the and the HSD-LD Epoxy Resin. Dowels and sleeves are delivered separately and have to be combined on site. HSD-LD-W Threaded Anchor (Supplied with nailing plate) HSD-LD-W-D Dowel Component

Page 2/5 Installation of HSD-LD and HSD-LD-ULTRA The instructions below refer to the HSD-LD Lockable Dowel. The HSD-LD-ULTRA Lockable High Capacity Dowel is installed in a similar manner. 1 Ensure that the part number of the shear dowels is the same as specified in the drawings. 2 Nail sleeve to formwork either central in the slab or for slab depths over 12 so the void former is level with the top of the slab. Do not remove sticky label, this prevents ingress of concrete into the sleeve. Make sure the sleeves are installed as accurately as possible in the horizontal plane to allow unimpeded horizontal movement of the dowel. Improper installation leads to binding of the dowel in the sleeve as it tries to move. This causes concrete cracking and is the leading cause of failure in dowel systems. 3 Attach the local reinforcement as specified by the engineer based on HALFEN s recommendations. Pour the concrete of the slab that contains the sleeve. Ensure that the reinforcement bars are installed as specified by the engineer Ensure, the lid is installed on the top of the sleeve to prevent concrete from entering the sleeve. appropriate concrete compaction around the sleeve 4 When the concrete has achieved sufficient strength, remove formwork and peel off or puncture the label to reveal the cylindrical sleeve only. Insert the dowel until it is app. ¾ from the back of the void former.

Page 3/5 Installation of HSD-LD and HSD-LD-ULTRA 5 Attach the local reinforcement structure to engineer s detail based on HALFEN s recommendations and pour the concrete of the slab that contains the dowel. appropriate concrete compaction around the dowel 6 After a time period specified by the consulting engineer (generally 28-120 days), when movement between the slabs has stabilized and the joint between the slabs has been filled, the dowel is ready to be locked. Fit the to the dovel on a groove in the center of the void former. The fan-shaped allows the dowel to be locked in any position. 7Fill the joint between the slab and the wall before installing the pourable epoxy resin: HALFEN can provide information on suitable joint filler. Mix the two-part epoxy resin and pour it into the void former. It is essential the resin fills the stainless steel area of the sleeve towards the joint and reaches the notches on the, which indicate minimum resin depth. Make sure the resin fills the sleeve at least up to the notches in the Resin minimum depth 8 After 24 hours the rest of the void former can be filled with cementitious material, level with the top of the slab, to complete the installation. The locked dowel continues to transfer vertical load between the slabs, but movement can no longer take place.

Page 4/5 Installation of HSD-LD-W 1 Ensure that the part number of the shear dowels is the same as specified in the drawings. 2 Ensure that the threaded nailing plate is fully engaged with the HSD-LD-W Threaded Anchor. Than nail it to the formwork so the HSD-LD-W-D dowel will be central in the adjoining slab (or within 6 of the top for slabs over 12 ). Install the local reinforcement as specified by the engineer based on HALFEN s recommendations and cast the concrete. Reinforcement around the threaded anchor should be at least #4 bars, installed at maximum 8 vertical and horizontal centers. appropriate concrete compaction around the dowel 3 When concrete reaches sufficient strength, remove the formwork and remove nailing plate. Fully screw the dowel into the anchor. Puncture the label of the sleeve to reveal the cylindrical sleeve only. Push the sleeve over the dowel, until the dowel is approximately ¾ from the back of the void former. Ensure the lid is secured to prevent debris from entering the void former. 4 Place the local reinforcement according to the engineer s detail based on HALFEN s recommendations and pour the concrete of the slab that contains the sleeve. Ensure that the reinforcement bars are installed as specified by the engineer

Page 5/5 Installation of HSD-LD-W 5 After a period of time predetermined by the engineer (generally 28-120 days), when movement between the slabs has stabilized and the joint between the slabs has been filled, the dowel is ready to be locked. Fit the on a groove in the center of the void former. 6 Fill the joint between the slab and the wall before installing the pourable epoxy resin: HALFEN can provide information on suitable joint filler. Mix the two-part epoxy resin and pour it into the void former. It is essential the resin fills the stainless steel area of the sleeve towards the joint and reaches the notches on the, which indicate minimum resin depth. Make sure the resin fills the sleeve at least up to the notches in the Resin minimum depth 7 After 24 hours the rest of the void former can be filled with cementitious material, level with the top of the slab, to complete the installation. The locked dowel continues to transfer vertical load between the slabs, but movement can no longer take place. Halfen USA Inc. P.O. Box 547, 8521 FM 1976, Converse, TX 78109, USA Phone: +1 800.423.9140 Fax: +1 210.658.8312 info@halfenusa.com www.halfenusa.com 2013 HALFEN Inst-HSD-LD-US 06/2013 www.halfenusa.com