IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

Similar documents
PAINTING PAINTING

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION. SPECIFICATIONS FOR Interior Painting CONTRACT

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

SECTION PAINTS AND COATINGS. a. Section Submittal Procedures: Requirements for submittals.

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

A. Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Steel.

Bid No. B14-02 Building 100 HVAC Improvements

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

EXTERIOR PAINTING

Cielito Lindo de Tubac Home Owners Association PAINTING POLICIES AND PROCEDURES

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

SECTION PAINTS AND COATINGS

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION PLAQUE, SERVICE AWARD PUBLICATION

SECTION PAINTING

A. Section includes surface preparation and the application of paint systems on exterior substrates.

1. Labels: Do not paint over UL, FMG, or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.

SPECIFICATIONS PROPOSAL & BID DOCUMENT

ITEM DESCRIPTION BIDDER CODE NO. UNIT COST UNIT COST 1 GALLON 5 GALLON

ADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation

Matt Morgan Assistant Superintendent of Support Services. Kristine Johnston Director of Purchasing. Date: July 30, 2015

SYLVAN WAY LIBRARY FIRE DOORS REQUEST FOR BID

A. Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Steel and iron.

PAINT, PUTTY, AND CAULKING MATERIALS FORM. Date. General Contractor. Painting Sub-Contractor. Project Number. Project Name.

Bid No :01 Exterior Roynon Elementary & La Verne Heights (Alternate #1) SCOPE OF WORK

Addendum #1 - Bid Package #

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

SECTION EXTERIOR PAINTING PART 1 - GENERAL

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

ITEM NO. DESCRIPTION BIDDER CODE NO. UNIT COST UNIT COST 1 GALLON 5 GALLON. 1 Oil Base Exterior House Paint Glidden Profess 2516 $22.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

SECTION SIGNAGE

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

SECTION PROJECT MANAGEMENT AND COORDINATION

Agenda. Interior Painting Exterior Painting Typical Problems Low VOC Paints

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

1.01 NOTICE TO BIDDERS

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

TELEPHONE: (215) Addendum No. 1

TG Glazing Design-Build

HOENER ASSOCIATES INC. ARCHITECTS

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

Approval Process: Houses Painted without approved colors/arb:

Amendment to Bid #1 Minor Office Renovations B /30/2018 No

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Painting Lesson Two: Choosing the Right Paint. Facilitator Guide

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

St. Monica Food Pantry

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Merrick Pet Care New Distribution Center Hereford, Texas

ADDENDUM NO. 1 November 10, 2016

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

(Full legal name of business submitting the offer)

A. This Section includes surface preparation and the application of paint systems on the following substrates:

REQUEST FOR QUOTATION INVITATION

Section Meetings Section Material and Equipment. None Required

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

MTJ Outdoor Baggage Claim

B. Samples: For each exposed product and for each color and texture specified.

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Please read through the entire document before starting your installation process to better understand what is required.

Specifications: Other: sign in sheet

SECTION SUBMITTAL PROCEDURES

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

If the address on this form is different than the address of the building, submit a written explanation.

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE

name (h) phone (m) phone time zone door style* *required finish* *required designer

ADDENDUM #1. April 29, 2009

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

CONVEYANCE PIPELINE AND PUMP STATION

SECTION WOOD DOORS

Answer: Only to ChurchWoods, LLC.

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

Sustainably made in the United States. Doors Make the Difference. stilechoice.com

State College of Florida Building 11_Music Interior Painting

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

SECTION SUBMITTAL PROCEDURES

Architectural Design Process

Chapter 22 - Cabinets & Vanities

Call your Lumber Liquidators Store #233, at (707) to pay for your materials.

Transcription:

IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are required: 1. Bid Bond 5% of bid 2. Performance Bond 100% of bid 3. Payment Bond 100% of bid MINIMUM REQUIREMENTS: Bid Bond in the amount of 5% of your bid. Awarded firm must demonstrate successful experience in painting of similar scope, size, and cost. Prior to start of work, the awarded firm shall provide a valid certificate of insurance and performance and payment bonds (100%) in the full amount of the contract price. Class A license is required for this project if the cost exceeds $100,000. Exhibit A Paint Areas: A new Exhibit A is attached change to rooms to be painted and not painted. Exhibit F Design and Paint Requirements: A new Exhibit F is attached to include page 8 for the Gym requirements Attachment 6 Pricing Schedule: Please disregard previous Attachment 6 and replace with Attachment 6 in this document this adds a line for pricing for Alternate Space Stage in the Cafeteria IFB CLARIFICATIONS: 1. When is the anticipated start date? Start date will be the end of the school year for students, around June 15, 2018. The work should be completed by August 13, 2018 with punch-out completed by August 20, 2018. 2. What are the colors for the Cafeteria and Gym? The paint colors are not known for these two areas. The vendor is expected to color match the white, blue and black paint for these areas. In the Gym, there is one wall in Exhibit F that does include the Regale Blue wall SW6801 3. In the Cafeteria, what is being painted? The walls up to and including the black trim are being color matched and painted, the doors and frames are being painted as well as the blue on the pillars. Vendors are NOT painting the ceiling, or panels. The two (2) rooms to the side of the stage shown in the walk-through are being painted as well. Conduits are being painted. 4. For the Alternate pricing for the Stage, what is being painted? The walls but not behind the cage on the left of the stage and the back climbing wall may or may not come down and will be discussed upon award. 5. What is being painted in the gym? The vendor will be expected to color match three walls with the existing color. Vendors are not expected to move the bleachers as they are bolted to the wall/floor. Vendors will paint Addendum 1 IFB 18-14 1

ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY to the top of the bleachers. Vendors will ONLY paint up to the rafters and stop, no rafters or tectum boards will be painted. The gym office will be painted. The mural will NOT be painted over. 6. What are we doing with existing murals? Existing murals are going to stay, the vendor will need to paint around them. The murals should be blocked off; the vendor is not expected to paint to mural edges. 7. Will the student/teacher art on walls in classrooms and hallways be removed? Yes, teachers will be informed that all items affixed to the walls should be removed in preparation for the work listed in this contract. 8. Will vendors paint the natural wood doors? No, vendors will not paint any of the natural wood doors 9. In bathrooms within classrooms, what will be painted? Vendor will be required to paint all walls not covered with FRP within the restrooms located inside classrooms. 10. For the round sunken room in the middle of the school, what needs to occur there? Vendors will be removing the carpet from the walls on the inside and outside of that room. The orange ceiling will be painted. The wood baseboard will be removed and replaced with the new base cove. Inside this room, the blue carpet will stay, including the blue carpet that goes slightly up the wall in the front of the room. 11. What will happen to accordion doors? Accordion doors are to be left as-is and not be painted or removed. 12. Can vendors have employees work in shifts? Yes, please notate this on the bid response. MCPS will make sure that the building is accessible to complete this work within the timeframe specified. 13. Should the vendor paint the expansion joints? No, these do not need to be painted. 14. What should vendors to for the wire molds and cords? Vendors will need to cut around wire molds and any other items permanently affixed to the walls. Projectors and the like will be bagged for the vendors before the work begins. 15. With regards to the outside painting, what is included? Vendors will only paint the exterior doors and lintels for any window that has a lintel. All anodized aluminum will NOT be painted. 16. Exhibit F shows specific artwork, is the vendor expected to paint the items, such as the birds in in the library? No the art done by others will not be part of this bid. Vendors are required to paint the design in the hallway, but not the birds in the library, Haydon Hawk in the gym, etc. ADDENDUM ATTACHMENTS: Attached Exhibit A Attached Exhibit F Attached Attachment 6 Revised Pricing Schedule Attached MANDATORY Pre-Bid Meeting Sign-In Sheet Addendum 1 IFB 18-14 2

ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ATTACHMENT 6 PRICING SCHEDULE REVISED *Vendors shall remove previous Attachment 6 Pricing Schedule and replace with this form. Responses not submitted on this Attachment 6 will be found non-responsive. *The bid prices shall be for a Turnkey-all inclusive (labor, materials, equipment, overhead, bid bond, etc.) project. No additional charges will be allowed. Pricing is firm fixed. Firms submitting a bid acknowledge the scope of work, terms and conditions and completion deadlines. Haydon Elementary School *Preparation Cost: $ *Painting Cost: $ Total Contract Cost: $ (Not including price for Alternate area) *Price for Alternate Area in Cafeteria: $ Estimated Time for Completion: Proposed Start Date: Notes/Comments: *If awarded, the Bidder is prepared to provide the required Insurance and Performance and Payment Bonds. Company Authorized Signature Date Print Name Title Addendum 1 IFB 18-14 3

MANASSAS CITY PUBLIC SCHOOLS R.C. Haydon Elementary School 9075 Park Avenue Manassas VA, 20110 JULY 24, 2017

Haydon Elementary School FOCUS AREAS FOCUS AREAS LIBRARY / MEDIA CENTER GYM CORRIDORS SW 7607 SANTORINI BLUE SW 7663 MONORAIL SILVER

Haydon Elementary School GENERAL NOTES FLOOR PLAN IS NOT TO SCALE AND CONDITIONS/FLOORPLAN MAY VARY ON SITE. FLOORPLAN IS SHOWN FOR LAYOUT PLANNING / PRICING PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL FIELD CONDITIONS AND DIMENSIONS, INCLUDING CEILING HEIGHTS. CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL QUANTITIES AND OVERAGE AS REQUIRED BY MCPS. BEFORE PROCEEDING WITH HIS WORK, THE CONTRACTOR SHALL CAREFULLY INSPECT ALL SURFACES TO BE PAINTED OR FINISHED AND SHALL NOTIFY MCPS OF ANY DEFECTS, IMPROPER MATERIALS, WORKMANSHIP OR OTHER CONDITION WHICH IN HIS OPINON WILL AFFECT THE SATISFACTORY COMPLETION AND PERMANENCY OF HIS WORK. THE ABSENCE OF ANY SUCH NOTIFICATION WILL BE CONSTRUED AS AN ACCEPTANCE BY THE CONTRACTOR OF ALL SUCH SURFACES. USE PRODUCTS OF SAME MANUFACTURER FURNISHING FIRST OR PRIMER SEALER COATS OF THE PARTICULAR SURFACE FOR SUCCEEDING COATS, EXCEPT WHERE METAL PRIMER IS USED. TYPICAL WALL COLOR U. N. O. SHERWIN WILLIAMS SW 7011 NATURAL CHOICE EXTRA. COLORS AND TYPES OF PAINT NOT LISTED OR INDICATED WILL BE SELECTED BY ARCHITECT. THE VARIOUS SURFACES SHALL BE PAINTED OR FINISHED WITH A MINIMUM OF ONE (1) PRIMER COAT AND (2) FINISH COATS. ADDITIONAL PRIMER AND FINISH COATS SHALL BE PROVIDED IF REQUIRED TO COVER MATERIAL UNIFORMLY AND COMPLETELY. ALL DRYWALL SURFACES SHALL BE PRIMED & PREPARED TO RECEIVE WALL FINISH. ALL SCRATCHES, CRACKS, HOLES OR SIMILAR DEFECTS SHALL BE PROPERLY CUT OUT AND FILLED WITH SPACKLING COMPOUND, OR OTHER PATCHING MATERIAL AS MAY BE REQUIRED. PATCHED PORTIONS OF DRYWALL SHALL BE GIVEN A COAT OF PRIMER-SEALER IN ADDITION TO ALL OTHER SPECIAL COATS. WALL SHALL BE EGGSHELL FINISHED, ROLLED. ACCESS DOORS, BUCKS AND OTHER METAL WORK SHALL BE SEMI-GLOSS FINISH AND SAME COLOR AS WALL IN WHICH THEY OCCUR. IF ADJACENT SURFACE IS FINISHED IN WALLCOVERING, MATCH COLOR AS CLOSELY AS POSSIBLE. CEILING AND SOFFIT FINISH FLAT TYPICALLY. ALL METAL ITEMS SCHEDULED FOR PAINTED FINISH (I.E. DOOR FRAMES, DOORS, RAILING, HVAC ENCLOSURES) SHALL BE PAINTED WITH A DTM PAINT. COLOR TO BE SAME AS ADJACENT SURFACES UNLESS OTHERWISE NOTED. SW 7607 SANTORINI BLUE AT COMPLETION OF WORK, ALL SUB-CONTRACTORS SHALL REMOVE FROM THE PREMISES ANY DEBRIS CAUSED BY HIS WORK. SUB-CONTRACTOR TO PACK & LABEL ALL ATTIC STOCK. OWNER TO PROVIDE LOCATION FOR SUB-CONTRACTOR TO DELIVER ATTIC STOCK TO BE STORED. MIN 5% OR 1 GALLON BUCKET (WHICHEVER IS GREATER) OF ALL COLORS AND PRODUCTS INSTALLED. FLAME SPREAD RATINGS FOR ALL INTERIOR FINISHES SHALL BE CLASS A. PROVIDE WRITTEN CONFIRMATION OF FLAME SPREAD TESTING TO BUILDING AND FIRE DEPARTMENTS. SW 7663 MONORAIL SILVER

Haydon Elementary School ALL PAINT COLORS TO BE USED TYP. WALL PAINT UNLESS OTHERWISE NOTED Benjamin Moore DOOR TRIM & DOOR PAINT ACCENT COLOR AT CORRIDORS ACCENT COLOR AT GYM ACCENT COLOR AT LIBRARY ACCENT COLOR AT LIBRARY ACCENT COLOR AT GYM WALL BASE COLOR SHALL BE AS CLOSE AS POSSIBLE TO DOOR TRIM COLOR JOHNSONITE 83 MIDNIGHT ACCENT COLOR AT CORRIDORS ACCENT COLOR AT LIBRARY ACCENT COLOR AT GYM ACCENT COLOR AT LIBRARY AT CLINIC: (SEE CLINIC PROTECTIVE WALL PAINT SHEET) OPTION 1 COLOR MATCH EXISTING BLUE & THEN GET PAINT IN SAME COLOR FAMILY, BUT A FEW SHADES DARKER IN HARMONY INTERIOR LATEX OPTION 2 SW 7011 NATURAL CHOICE IN PAINT SHIELD MICROBICIDAL INTERIOR LATEX PAINT SW 7607 SANTORINI BLUE SW 7663 MONORAIL SILVER

Haydon Elementary School SCHOOL CORRIDORS CONCEPT SKETCH SW 7663 MONORAIL SILVER

Haydon Elementary School SCHOOL CORRIDORS CONCEPT SKETCH

Haydon Elementary School MEDIA CENTER/LIBRARY SW 7607 SANTORINI BLUE BIRD & CLOUD WALL FILM IS OPTIONAL SW 7663 MONORAIL SILVER

Haydon Elementary School GYM ADD SCHOOL NAME PAINT RECTANGULAR BOX & STRIPES, SCHOOL LOGO TO BE APPLIED AFTER PAINTING COMPLETE SW 7607 SANTORINI BLUE PAINT WALL ACCENT COLOR: