Architect s Letter of Certification

Similar documents
Architect s Letter of Certification

Residential Construction Checklist Single and Two Family Construction

Residential Room Addition / Remodel Submittal Requirement Checklist

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

City of Thousand Oaks

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Single-Family Dwelling Submittal Requirements

Bid No. B14-02 Building 100 HVAC Improvements

Non-Residential and Multi-Family Plan Check Submittal Requirements

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

M1.0 MECHNANICAL FLOOR PLAN

PLAN SUBMITTAL REQUIREMENTS

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

Signs, Canopies & Awnings City of Oshkosh Department of Community Development

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

MASTER SIGN PLAN APPLICATION

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Attachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

Commercial Infill Project Guide

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Section Meetings Section Material and Equipment. None Required

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

Electrical IP Red Seal Practice Exam

A/C Change-Out Permit Guidelines - Residential

Tri-County Commercial Application Checklist

VILLAGE OF ALGONQUIN COMMUNITY DEVELOPMENT 2200 Harnish Drive Algonquin, IL Phone (847) Fax (847)

COMMERCIAL PERMIT APPLICATION GENERAL REQUIREMENTS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

APPENDIX B: Generation Interconnection Application Form

.1 Applicability: These criteria shall be applied as follows:

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

INSPECTIONS & PERMITS DEPARTMENT

Department of Labor and Industry Electrical Licensing

1. Land survey Work. 2. Civil and Structural engineering services.

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

SIGN PERMIT APPLICATION

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

APPLICATION DESIGN REVIEW Please Print or Type

3 Basic Code Enforcement, Part 3

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES

BUILDING PLAN REVIEW REQUIREMENTS

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

ADDENDUM #2 September 12, 2018

SECTION SUBMITTAL PROCEDURES

Quality Control Checklist - Design Drawings

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

East Central College

Regal Series Recessed Flatwalls

SUBDIVISION PLAT APPLICATION

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

Operating Standards Attachment to Development Application

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

State of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

A/E REVIEW CHECKLIST HVAC

Technical Assignment #2 Electrical Existing Conditions Report

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

REFLECTION POINTE SUBMITTAL FORMS March 2018 Edition

Architectural Review Committee (ARC) Amended Guidelines for All ARC Applications

SECTION LIGHTING PART 1- GENERAL

Architectural Design Process

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

BOOTH CONSTRUCTION & DISPLAY REQUIREMENTS Huntington Convention Center Cleveland, Ohio February 7 9, 2018

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Technical Development Program

DESIGN CHECKLIST INTRODUCTION

4. An overheated resistor is usually a symptom of a problem rather than its cause.

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Costa Mesa California

Licensed Electricians Practical Assessment (LEP)

Transcription:

Architect s Letter of Certification Store Name: Center: Space Number: This letter is to serve as certification that the enclosed working drawings for the above referenced space comply with Section of the Lease Data Sheet and Landlord s Construction Criteria as outlined in Exhibit B of the Lease Agreement. Dated: Signed: Title: Address:

Store Completion Inspection Store Name: Center: Space Number: The above named store was inspected on / / by this office and is hereby certified to be in compliance with the Construction Documents submitted to and approved by the Landlord dated / /. The following is a list of items either incomplete or inconsistent to those documents: 1. 2. 3. 4. 5. (Use Back of form for additional items) The included list has been forwarded to the General Contractor to remedy same. A copy of this form has also been sent to the Tenant. Signed: Title: Date: Complete Address: Telephone: Fax Number:

Appendix A: Tenant Mechanical and Electrical Tabulation Sheets Instructions For Completing the Form General All blanks on the forms must be filled in. 1. Forms must be completed by the Tenant s Mechanical or Electrical Engineer. 2. Tenant s architect is responsible for ensuring coordination of all mechanical and electrical work. 3. If the forms are not filled out or if they are not included with the Second Submittal, the Construction Drawings and Specifications will not be reviewed until a complete submittal is made. 4. For explanation of footnotes refer to page 3. Mechanical 1. Only recognized ASHRAE methods are to be employed. 2. Wall, roof, etc., heat gain and heat loss BTU/SF criteria can be found on Design Criteria Package (see Sheet ME-2 of 2). 3. Check sheets are not intended to be a calculation method but merely a standard summary of data as was used by the Tenant s engineer. All factors provided are minimums. Electrical All data presented shall be as per NEC. Page 1 of 5 MacArthur Center

Tenant Mechanical Load Calculation Check Sheet For Tenants Connecting to the Central Air-Conditioning System Tenant Name Space No. Lease Area SQ. FT. Product/Service Level COOLING LOAD CALCULATIONS FOR SALES AREA SQ. FT. Description Total Watts, Multiplier BTUH (Cooling) Percentage W/Ceiling Plenum Persons or Area Plenum Credit Credit Nominal BTUH (Cooling) Recessed Lighting 1 x 3.41 = x % = Track & Case Ltg 2 x 3.41 = x 100% = Equipment 2 x 3.41 = x 100% = People x 315 = x 100% = (1 Person/75 SF) Roof 3 SF x BTU/SF = x % = Walls 3 SF x BTU/SF = x 100% = Doors, Windows, Infiltration, Etc. x 100% = TOTAL BTUH Description Total BTUH Divisor Total Cooling Required Nominal Cooling (1.08 x 20º F) = CFM HEATING LOAD CALCULATIONS FOR SALES AREA Description Area BTUH Peak BTUH (Heating) Roof 3 SF x BTU/SF = Walls 3 SF x BTU/SF = Doors, Windows, Infiltration, Etc. = TOTAL BTUH = Page 2 of 5 MacArthur Center See Page 3 of 5 for Footnotes

COOLING LOAD CALCULATIONS FOR STOCK AND/OR REMAINING AREAS SQ. FT. Description Total Watts, Multiplier BTUH (Cooling) Percentage W/Ceiling Plenum Persons or Area Plenum Credit Credit Nominal BTUH (Cooling) Lighting 1 x 3.41 = x % = Equipment 2 x 3.41 = x 100% = Transformer x 138.11 = x 100 % = (KW Capacity) (0.90)(0.045)(3410) Roof 3 SF x BTU/SF = x % = Walls 3 SF x BTU/SF = x 100% = Doors, Windows, Infiltration, Etc. x 100% = TOTAL BTUH = Description Total BTUH Divisor Total Cooling Required Nominal Cooling (1.08 x 20º F) = CFM HEATING LOAD CALCULATIONS FOR STOCK AND/OR REMAINING AREAS Description Area BTUH Peak BTUH (Heating) Roof 3 SF x BTU/SF = Walls 3 SF x BTU/SF = Doors, Windows, Infiltration, Etc. = TOTAL BTUH = FOOTNOTES: 1. Actual plan count, not square foot factors (Coordinate with Electrical Drawings). 2. Kitchen or other powered equipment - attach separate Calculation Sheet(s). 3. For heat gain and heat loss BTU/SF criteria see Design Criteria Package. Page 3 of 5 MacArthur Center

SUMMARY SHEET FOR MECHANICAL DATA TABULATION Description CFM Landlord Approved CFM Grand Total NOMINAL CFM Requested CFM Description Total BTUH Divisor Total Grand Total Heating Required 3410 = KW Requested Heating Capacity 3410 = KW Calculation Check Sheet Preparer s Information: Name Company Telephone Fax Page 4 of 5 MacArthur Center

Tenant Electrical Data Tabulation Sheet Tenant Name Space No. Lease Area SQ. FT. Product/Service Level Load Type Connected KW Space Lighting Showcase Lighting Sign Lighting Receptacles Water Heating Toilet Exhaust Fan (HP) Special Appliances or Equipment 1 Miscellaneous (Indicate) Space Heating Air Conditioning (HP, KW or FLA) Fan Coil Unit (HP) Exhaust Hood Fan(s) (HP) Make-up Air Fan (HP) Largest Motor, Total Motor (HP) Transformer Size (KW or KVA - Indicate) TOTAL CONNECTED LOAD (KW) TOTAL SIMULTANEOUS LOAD (KW) (Maintained at 3 hours or more) Footnote 1: Attach separate sheet outlining equipment name, location, KW or HP, etc. PREPARED & CERTIFIED BY: Do Not Write Below This Line 480/277 volt, 3 phase, 4 wire power to Tenant space provided by the Tenant (lighting and power) Conductors Conduit Switch Fuse Page 5 of 5 MacArthur Center

Appendix B: Pre-Construction Information Form This form is to be completed prior to the Pre-Construction Meeting to be held with Landlord s Field Representative. Construction work may not commence until this form is completed in its entirety and approved by Landlord s Project Manager or designated representative. 1. General Contractor: Address: 2. Mechanical Contractor: Address: 3. Electrical Contractor: 4. Plumbing Contractor:

Pre-Construction Information Form (Continued) 5. Sprinkler Contractor: Address: 6. Commencement Date for Construction: 7. Estimated Date for Completion: 8. Estimated Date for Fixturing: 9. Estimated Date for Opening: 10. Cost of Construction: 11. Evidence of Insurance As Set Forth in Exhibit B Of Lease Agreement. Tenant s Signature: Date: Landlord s Field Representative: Date: