Multi-Bowl Applications

Similar documents
Cameron MBO Multi-Bowl Wellhead System

Wellhead Control Products, Inc. Hangers

WRS Artificial Lift System

MSR/MSB Mechanical Setting Tool

Insertion Transducer On-line Install Instruction

MSR/MSB Mechanical Setting Tool

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

3/2004. Core Barrel Tool Assembly and Disassembly


POP BLIND RIVET NUTS.

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

ANSI ORIFICE FLANGES METAL-KOREA

Installation Instructions for Vista Air Vertically Folding Walls

Land wellhead systems & offshore surface wellhead systems

Installation Instructions

Storage Cabinets 9000 Series Assembly Instructions

Publication Part No. SK

Wellhead equipment CATALOG

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

LK36-LK40-LK45 LK50-LK55-LK60

Wellhead and Production Equipment Catalogue January 2017

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

MALEKO WALL-MOUNT FAUCET INSTALLATION

TABLE OF CONTENTS REQUIRED TOOLS

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

General Four-Way Operation, Maintenance & Service Manual

Global Drilling Solutions, Inc

Diva Acoustical Ceiling

Pressure Vessel Assembly Instructions

EZ-Lock Assembly Manual

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

HANDWHEEL ASSEMBLY UPGRADE

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance

TABLE OF CONTENTS Page

Dublin Stalls Installation Instructions

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

Sport-Thieme Handball Goal, 3x2 m, Free-Standing or socketed

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

Grain Tank Cross Auger Trough Liner for John Deere 9400 / 9500 Combine

Working for the future POSGRIP Technology

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Installation Instructions

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

W-K-M Model MA-1 DynaCentric Butterfly Valve

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

Spiderbeam Balun Construction Guide

3.1 MUELLER LARGE DRILLING MACHINES

3.1 MUELLER LARGE DRILLING MACHINES

Mounting a BalanceBox 400 to a brick wall

Original Gallery System

INSTALLATION GUIDELINES

Water Line and Water Line Assembly Gasket

Composition of kit SC3140 SC3110 SC3100 SC3140 SC3120. KF-SC31-R0_EN PAGE 2 of 15. max mm. max. 100 kg. 10 mm

PEDESTAL OVERHAUL. Some of the tools for a pedestal overhaul. Pedestal work stand

Installation Instructions

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions

Installation Instructions for Converting Hinging on Roll-In Refrigerators

Maintenance Information

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

Tooling Approving Report

Emission-Pak Assemblies

INSTALLATION INSTRUCTIONS 3"/4 BENT END SIDEBARS FORD F-150 SUPERCREW PART # DZ /DZ

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Assembly and installation help

1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60

BALANTINE WALL-MOUNT FAUCET INSTALLATION

N. 15th Street, Middlesboro, KY LOCK-N-ROLL INSTALLATION INSTRUCTIONS

Fisher 667 Diaphragm Actuators Size 80 and 100

Organisational Kitchen Fittings Kitchen Cabinet Accessories

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Installation Instructions

MODUL METAL EXTERIOR

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Assembly Instructions and Owner s Manual Flex TechBridge

Support. (3)Passenger Support. Brackets. (2) Running Board (example only)

Assembly Instructions

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

RANGER Class Preview Product Demonstration Inner Space: Rigs to Reefs

ALDoor DOUBLE DOOR INSTALLATION

CordlessPRO Professional Wide Band Lift Sheet System

Move System Swivel Caster Installation ( )

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

G01 through G10 Series Hydraulic Actuators Double-Acting with M11 Hydraulic Override Disassembly and Reassembly

HYDRO-TOWER INSTALLATION INSTRUCTIONS

Frameless Inline Door With Return QCI5263

caroma marc newson wall basin mixer

Acrylic Claw Foot Tub

...thoroughly tried and tested!

2. Inspect the end yoke bores for wear and damage. Replace if necessary.

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

STEWARD ECO T01-B INSTALLATION INSTRUCTIONS L URINAL (REAR INLET) K-4986T-ER( ) , 2010 Copyright Kohler China Ltd.

CORNER ENTRY ENCLOSURE

Transcription:

Multi-Bowl Applications

Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the- Shelf Slips Removable Upper Section = Improved Asset Management Rig Time Savings Components

COMPONENTS SW-22 Casing Head 13-5/8"-5M x 13-3/8" SOW CSS Head 13-5/8"-5M x 13-5/8"-5M Mandrel Casing Hanger 13-5/8" x 9-5/8" Packoff 13-5/8" Nom. SW-22 Casing Hanger 13-5/8" x 5-1/2"

Run Conductor to Desired Height. Install Diverter Stack over Conductor. Drill for Surface Casing as required. INSTALLATION

Remove Diverter Stack INSTALLATION

Run Surface Casing and Space Out as required. Cement Casing as Required. Make final cut on Surface Casing Install the MULTI-BOWL Assembly onto the casing, weld and test as required

Clean and inspect the ring grooves on the MULTI-BOWL spool before setting the BOP Install the Ring Gasket Make-Up BOP stack

Make up C-22 test plug to the drill pipe on rig floor Run test plug into the hole and land on the load shoulder Test stack Retrieve C-22 test plug

Make up Long Wear Bushing Running Tool to the drill pipe on rig floor Insert running tool onto Wear Bushing through the J slots, rotate to the right until the stop Run the Wear Bushing into the well bore and land on the load shoulder.

Engage two of the upper Lockscrews to hold the Wear Bushing in place Lockscrews will be painted yellow and will have in & out measurements. Look at the measurements stenciled on the flange and measure the lock screws to match the engage measurement Rotate the running tool left until the stop and retrieve the running tool Drill for Intermediate Casing as Required

Make up Long Wear Bushing Running Tool to the drill pipe on rig floor Run into well bore and land on the Wear Bushing Disengage the upper Lockscrews Look at the measurements stenciled on the flange and measure the lock screws to match the disengage measurement Rotate the running tool to the right until the stop Retrieve Long Wear Bushing

Make-up Mandrel Casing Hanger to the Last Joint of Intermediate Casing Pick up landing joint with running tool and make up to the Mandrel Hanger turning to the right to thread Run in and land the Mandrel Hanger on the Load Shoulder Cement as needed Flush casing valves after cementing is complete Rotate the running tool to the left to unthread from Mandrel Hanger Retrieve running tool Note: Landing Joint, Running Tool, Fluted Casing Hanger, and Pup Joint can be shippedas anassembly

Make-up Packoff Running Tool to the drill pipe on the rig floor Insert running tool onto Packoff through the J slots, rotate to the right until the stop

Run and Land the Packoff in the MULTI-BOWL Housing Use the Sight Plug to visually confirm the landing of the Packoff (The load shoulder on the packoff will be spray painted yellow for easy confirmation) Engage lower Lockscrews to lock the Packoff into place Look at the measurements stenciled on the flange and measure the lock screws to match the engage measurement

Test the inner and outer seals before retrieving the running tool Rotate the running tool left until the stop and retrieve the running tool

Make up C-22 test plug to the drill pipe on rig floor Run test plug into the hole and land on the load shoulder Test stack Retrieve C-22 test plug

Make up Short Wear Bushing Running Tool to the drill pipe on rig floor Insert running tool onto Wear Bushing through the J slots, rotate to the right until the stop Run the Wear Bushing into the well bore and land on the load shoulder

Engage two of the upper Lockscrews to hold the Wear Bushing in place Look at the measurements stenciled on the flange and measure the lock screws to match the engage measurement Rotate the running tool left until the stop and retrieve the running tool Drill for Production Casing as Required.

Make up Short Wear Bushing Running Tool to the drill pipe on rig floor Run into well bore and land on the Wear Bushing Disengage the upper Lockscrews Look at the measurements stenciled on the flange and measure the lock screws to match the disengage measurement Rotate running tool to the right until the stop Retrieve Short Wear Bushing

Run Production Casing as Required. Cement as Required Lift up BOP Stack, Wrap Casing Hanger around Casing and Support with Boards Land in Bowl Slack off on Casing to Set Slips to Company Desired Weight

Rough Cut Casing Remove BOP Final Cut and Bevel Casing Install and torque up the cover flange to protect the well during the rig move

Remove Cover Flange Land and Make-Up Tubing Head Rig up Packing Tool and pack off the PP seals Test between Seals on Casing Test the Flange Connection

Make-up the Frac Tree Assembly. Frac Down Production Casing as Required.

Remove Frac Stack Run Production Tubing as needed Make up TC1W to last joint of Production Tubing Land Hanger in top of Tubing Head Secure Hanger with Lockpins

Install Slip Flange Assembly. Test Flange Connection. INSTALLATION