Future Projects District 3 Central Minnesota 2019 2022 mndot.gov/d3
Lake 371 2019-2022 Construction 200 Walker 34 CASS 200 Remer 6 Central Minnesota MnDOT District 3 Hackensack 371 84 Longville 6 Hill City Backus 87 Ou ng 87 84 Menahga Emily Pine River 371 CROW WING 6 Sebeka Jenkins 64 Hassman Pequot 2018-2019 Construct Lakes 71 Deerwood 2019 WADENA Wadena Crosby CASS Nisswa Ironton 2019-2020 2020 29 6 10 2021 Brainerd Glen Staples Hewi Baxter Malmo 18 2022 18 Motley Pillager Bertha Lake 47 Garrison Mille Lacs AITKIN T O D D 10 371 18 Eagle Bend Camp 71 Cushing Ripley Vineland Isle Woodland Browerville Randall 115 Lastrup Cove Onamia Li le Falls Pierz MILLE LACS 65 Long Prairie Genola KANABEC Osakis MORRISON Mora Brook 287 Swanville Park 28 10 238 107 Royalton Li le Rock Ogilvie Grey Eagle Upsala 70 Rice Milaca Brunswick Bock 28 Sauk Centre BENTON 23 Westport 47 Braham 94 71 Albany 237 Sauk Foley Sartell Rapids Pine Brook Meire New Munich Elrosa Grove Avon Waite 95 Cambridge Collegeville Park Brooten St. Cloud 4 STEARNS Princeton 10 ISANTI Cold Spring Isan Lake Richmond St. Clear SHERBURNE Belgrade Henry Augusta Lake 55 23 Zimmerman 22 Clearwater Paynesville 15 Becker 24 94 Big Lake Kimball Convert to Freeway 55 South Haven 2020-2021 2023-2024 4 N Eden Valley Mon cello Elk River ANOKA MEEKER 2019-2021 101 Annandale Anoka Albertville Otsego WRIGHT St. Michael 241 METRO Project Buffalo 94 Rogers 2020-2021 Rockford Maple Grove Cokato 12 55 Montrose 494 Howard Lake Watertown Delano 12 Minnesota Department of Transportation
2019 Construction 4 Stearns Reconstruct the road surface (reclaim) from Hwy 55 to I-94 (excludes Lake Henry done 2018 and Meire Grove reconstruct 2020) $6.0 M 6 Crow Wing Install Cuyuna Lakes State Trail pedestrian tunnel under Hwy 6 in Crosby (City led) $1.0 M 6 Crow Wing Cass 10 Wadena Otter Tail Resurface (mill and overlay) and improve Hwy 6, north of Olander Rd to south Emily and north Emily to Outing; improve pedestrian access in Outing Reconstruct from 3 rd St NW to 2 nd St NE in Wadena; upgrade signals, city storm sewers and pedestrian accessibility. Resurface west of Wadena to Bluffton and east of Wadena to Oink Joint Rd. Add new left turn lane at CR 75 (Yr 1 of 2) $7.0 M $10.0 M 15 Stearns Resurface (reclaim) from Hwy 55 in Kimball to 66 th Ave in St. Augusta $8.0 M 18 Replace bridge on Hwy 18 over Morman Creek (D1 funds, D3 design) $800,000 Wright Resurface and improve Hwy from 7 th St South to Hwy 12 in Montrose (City led) $500,000 Wright Resurface (reclaim) an improve drainage on Hwy from Hwy 12 in Montrose to 10th St in Buffalo; includes box bridges north of Hwy 12 and three miles south of Buffalo Morrison Reconstruct from 6 th St W to 2 th St E; includes pedestrian sidewalks, city sewer and water in Little Falls. Resurface from 15th St W to 6th St W and 2nd St E to 9th St E. 55 Wright Resurface (reclaim) and repair/replace drainage pipes from Poplar St in Annandale to Hwy in Buffalo 55 Stearns Resurface (mill & overlay) and improve road from Kandiyohi/Stearns county line to east of Paynesville, includes bridge updates over railroad west of Hwy 23 65 Isanti Install a Continuous Green T intersection at Hwy 107/Hwy 65 in Braham in Isanti County for improved safety and traffic flow 65 Isanti Install a Reduced Conflict Intersection (RCI) at Hwy 65/Cajima St NE in Isanti (City led) $6.9 M $3.8 M $9.9 M $1.7 M $1.0 M $600,000 71 Wadena Install railroad tracks crossing gates at Hwy 71 and Jefferson St in Wadena $300,000 I-94 Stearns Reconstruct parking area at Fuller Lake Rest Area along westbound I-94 $1.5 M I-94 Stearns Re-deck CR 159 bridge surface over I-94 at Collegeville (Local access detour) $600,000 I-94 Wright Reconstruct and add a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19 ($56 M Corridors of Commerce funds; Yr 1 of 3; Design-Build) $65 M Mille Lacs Restore bridge over White Fish Creek two miles south of Crow Wing county line $1.7 M Crow Wing Reconstruct 14 miles of road surface (reclaim), replace/repair pipes and improve access from the end of the four-lane in Brainerd to Ironton $6.9 M Crow Wing Construct and expand Cypress Dr intersection and road in Baxter (City led; Yr 2 of 2) $7.5 M 371 Crow Wing Landscape along new four lane in Nisswa, Pequot Lakes and Jenkins (Yr 2 of 2) $200,000 371* Cass Upgrade railroad signal system at Hwy 371/Aspen Ave in Cass Lake (D2 construct) $5,000 371* Cass Construct center left turn lane at Shingobee Rd in Walker (D2 construct) $300,000 371* Cass Urban reconstruct from railroad tracks to Hwy 2 in Cass Lake (D2 construct) - $1.5 M
2020 Construction 10 Wadena Otter Tail Reconstruct from 3 rd St NW to 2 nd St NE in Wadena; upgrade signals, city storm sewers and pedestrian accessibility. Resurface west of Wadena to Bluffton and east of Wadena to Oink Joint Rd. Add new left turn lane at CR 75 (Yr 2 of 2) 15 Stearns Resurface (reclaim) and upgrade sidewalks, from the railroad crossing to Hwy 55 in Kimball 12 Wright Resurface (mill and overlay) Hwy 12 from Sunset Ave to 7 th St SE in Cokato, upgrade pedestrian access and improve signalized intersection at CR 3 12 Wright Resurface (mill and overlay) from Zephyr Ave in Montrose to north of Bridge Ave in Delano $10.0 M $1 M $1.5 M $3.1 M 18 Crow Wing Replace bridge over Portage Creek west of Hwy 6 $750,000 23 Benton Construct a Reduced Conflict Intersection (RCI) at Benton CR 8 east of St. Cloud $500,000 23 Benton Resurface (mill and overlay) from Benton CR 1 in St. Cloud to Hwy 95 east of St. Cloud 24 Wright Resurface (mill and overlay) from Hwy 55 to north of Poplar Ave in Annandale, includes pedestrian access improvements $2.3 M $1.9 M 28 Stearns Replace bridge over stream west of south junction Hwy 71 near Sauk Centre $602,800 47 Kanabec Resurface (reclaim) from Hwy 23 in Ogilvie to Hwy in Isle and replace bridge over stream five miles north of Ogilvie, replace bridge over Little Ann River north of west junction of Hwy 23 47 Replace bridge over Morman Creek just north of Malmo on Hwy 47 (D1 funds, D3 design/construct) $11.4 M $600,000 71 Todd Replace bridge over Long Prairie River in Long Prairie $2.7 M 84 Cass Replace bridge over rway Brook Dam in Pine River $3.3 M Mille Lacs Install Reduced Conflict Intersections (RCI) at Mille Lacs CR 11, CR 12 and CR 13 near Milaca (safety partnership project) $1.8 M I-94 Stearns Construct exit loop ramps at the Hwy 23 interchange south of Waite Park $2.2 M I-94 Wright Reconstruct both directions of road surface from east of Wright CR 39 in Monticello to Hwy 24 in Clearwater (Yr 1 of 2) Install noise wall barrier along westbound I-94 in Monticello. I-94 Wright Construct eastbound Freight Enforcement pull-in lane west of Hasty, before Enfield Rest Area I-94 Wright Reconstruct and install a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19. ($56 M Corridors of Commerce funds; Yr 2 of 3; Design-Build) $60 M $500,000 $65 M 238 Stearns Construct a new roundabout on Hwy 238 (Railroad Ave/1st St) in Albany (City led) $605,000
2021 Construction 4 Stearns Reconstruct from 2 nd Ave S to 2 nd Ave N and improve pedestrian access in Meire Grove 6 Itasca Resurface (reclaim) and improve roadway from Cass/Itasca county line to Hwy 2 west of Cohasset (D1 funds, D3 design) $1 M $5.3 M 10 Sherburne Reconstruct from Xenia Ave to 4 th St and improve pedestrian access in Elk River - $8.8 M 12 Wright Resurface (mill and overlay) from 13 th Ave in Howard Lake to Montrose and improve pedestrian access 55 Stearns Resurface (mill and overlay) and improve pedestrian access in Brooten and Belgrade 55 Wright Resurface (mill and overlay) from Meeker/Stearns county line to west of Poplar Ave in Annandale and upgrade pedestrian sidewalks and signals in Annandale - $4.6 M - $1.5 M $4.5 M 95 Isanti Resurface (reclaim) from CR 15 west of Pine Brook to Cambridge $6.8 M I-94 Wright Reconstruct both directions of road surface from east of CR 39 in Monticello to Hwy 24 in Clearwater (Yr 2 of 2) I-94 Wright Reconstruct and install a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19. ($56 M Corridors of Commerce funds; Yr 3 of 3; Design-Build) 200 Cass Resurface (reclaim) and widen shoulders from south junction Hwy 371 near Walker to Hwy 84 near Longville (D3 funds, D2 construct) Crow Wing Reconstruct from 2 nd St SW to 3 rd Ave NE in Crosby and resurface (mill and overlay) from west of 7 th Ave in Ironton to 2 nd St SW in Crosby, and upgrade pedestrian sidewalks $60 M $65 M $10.6 M $5 M
2022 Construction 2* Cass Resurface (mill & overlay) from end of the four lane in Cass Lake to CR 10 $2.3 M 2* Cass Isanti Resurface (mill & overlay) from Cass CR 19 to Isanti CR 18 $7.7 M 6 Cass Resurface from Cass CR 4 to Hwy 200 in Remer - $1.3 M 10 Benton Replace bridge west of Benton CR 33 near Rice $820,000 10/23 23 47 Benton Benton Mille Lacs Crow Wing Wright Todd Douglas Mille Lacs Reconstruct the Hwy 10/Hwy 23 interchange accesses and bridges, and install multimodal improvements in St. Cloud Reconstruct the road surface (unbonded concrete overlay) from Foley to Milaca; construct a new roundabout in Foley $30.3 M $14.0 M Replace bridge over BNSF railway in Brainerd, includes bike/pedestrian trail $4.0 M Reconstruct from 1 st St to Settlers Parkway in Buffalo, includes new roundabout at CR 12 and pedestrian sidewalks Resurface roadway (reclaim) from I-94 in Osakis to Hwy 71 south of Long Prairie; and replace three bridges, and add a pedestrian trail bridge Resurface (mill & overlay) and improve Hwy 47 from Hwy in Isle to 305 th Ln north of Glen in and Mille Lacs Counties $6.2 M $14.8 M $5.2 M 65 Kanabec Replace bridge over the Snake River in Mora $3.6 M 71 Todd Replace bridge over Drayer Creek and Harris Creek in Browerville $1.4 M I-94 Stearns Replace bridges over BNSF railway west of the Hwy 23 interchange near St. Joseph TBD $6.0 M 95 Isanti Construct new roundabout at the Hwy 47/95 intersection near Pine Brook $1.8 M 371B Crow Wing Crow wing Reconstruct road surface (unbonded concrete overlay) and widen shoulders from to the Mississippi River in Hassman, replace bridge Smoothen and rehab the concrete road surface (diamond grind) from Deerwood to Reconstruct from Joseph St to Greenwood St in Brainerd and resurface (mill & overlay) from Greenwood St to 70 th Ave, south of Brainerd 371 Crow Wing Install Reduced Conflict Intersections (RCI) to improve access at CR 1/Gull Lake Dam Rd and CR 126/Green Gables Rd (safety partnership project) $14.0 M $3.5 M $6.0 M $1.8 M