Future Projects. District 3 Central Minnesota. mndot.gov/d3

Similar documents
2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects

In 2017, we continued to focus on CMCU s three core pillars:

2012 MnDOT Greater Minnesota Construction Projects

2007 Construction Information/Season Notes

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP)

2018 District 1 Highway Construction Program

This page is intentionally left blank

Updated: April 7, 2016

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Annual Report. Our Mission. Powering possible. to help CENTRAL MINNESOTA people build and sustain. Who We Are. How We Serve THRIVING COMMUNITIES.

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Metro - Let me know about major weekend traffic impacts

A Publication of the Mid Minnesota Association of Woodturners

Dear Friends, At the Initiative Foundation, we believe that a quality job is the most essential element of a stable family and a thriving community.

Currently Future Agency Used for Use for Classification Property

A MESSAGE FROM LARRY KORF, BOARD OF TRUSTEES CHAIR

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

%&g( %&g( ) Bridge Projects DRAFT

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 35

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

CENTRAL MINNESOTA USER COMMITTEE - JOINT WITH OWNERS AND OPERATORS Douglas County Public Works

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 37

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

d1am18 Thursday, day 1, Erik's to Somerset. Lunch.

PINELLAS COUNTY MPO FY 2013/ /18 TRANSPORTATION ALTERNATIVES (TA) PROGRAM PRIORITY LIST STATUS REPORT

PL N 84TH PL N IVES CT N. Mills Creek 85TH AVE N LN N WEAVER LAKE RD N. PUD Concept Stage Plan 83RD PL N NEIGHBORHOOD LOCATION MAP

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Polk County

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

2018 High School Overall Team Results

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Cathedral of the Sacred Heart 18 N. Laurel Street Richmond, VA 23220

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

2015 MINNESOTA SPRING GROUSE SURVEYS

County of Sonoma Agenda Item Summary Report

Arkansas State Highway and Transportation Department

Maintenance of Traffic sequence of operations including any phasing and detour maps;

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

CHIPPEWA FALLS. Chippewa Falls High School 735 Terrill Street Chippewa Falls WI 54729

Medicine Bow. National Forest. Columbine. Routt. National Forest. Steamboat. Springs. Eagle. White River. Glenwood. National Forest. Springs.

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Single Point Urban Interchange (SPUI) with Signals

Appendix G. Visual Simulations and Illustrations

Attachment #2 PPW133-07

MINNESOTA NAWCA PROJECTS

CONSTRUCTION PLANS. for TOWN OF YORKVILLE 2017 PAVING & DRAINAGE PROGRAM BRAUN ROAD (57TH DRIVE TO WOODLAND TRAIL) 53RD DRIVE

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

CITY OF VISTA STANDARD DRAWINGS

Exit 61 I-90 Interchange Modification Justification Study

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

County Assessor Membership Directory. County Assessor Directory

LIVINGSTON SCHOOL BUS ROUTES

Little League District 19 New York District Administrator George Serrano. Directions to Little League Fields

Charlton/Oxford Route 20 Reconstruction Project

CITY OF VISTA STANDARD DRAWINGS

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

SCPW FIELD DIRECTIONS

3D Technologies Implementation - SE Freeways Design Wisconsin Department of Transportation

Texas Water Safari Driving Directions

Chapter 7. Figures. The following good practices can help to maximize the effectiveness of figures in NEPA documents:

BOARD OF DIRECTORS MEETING MINUTES

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS

2006 TRAFFIC COUNT REPORT. Prepared by: Hendry County, Florida Engineering Department

TAX MAP TOWNSHIP OF VERONA ESSEX COUNTY, NEW JERSEY

King Mill Lambert DRI# 2035 Henry County, Georgia

APPENDIX E: CIP Maps

DIRECTIONS TO GAMES. BIBLE BAPTIST CHRISTIAN SCHOOL 2724 Margaret Wallace Rd Matthews, NC

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

Minnesota. County Assessor. Directory

BELCHERTOWN PRECINCTS (alpha by street)

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Appendix F: Archaeology VEIRS MILL CORRIDOR MASTER PLAN PUBLIC HEARING DRAFT

MVLL 2018 FALL BALL WEEK SIX SCHEDULE BASEBALL

APPENDIX D. Existing Conditions

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation and New Jersey Transit By Core Mission

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation.

MARQUETTE GREENWAY TRAIL

Tour - Short Landscape

Arrowhead Youth Soccer Association Fields Directory

GILBERT REAL ESTATE & PROPERTY MANAGEMENT 2407 Chambliss Avenue NW, Cleveland, TN / Phone GV0020PP\

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

GILBERT REAL ESTATE & PROPERTY MANAGEMENT 2407 Chambliss Avenue NW, Cleveland, TN / Phone PP\

Directions for Soccer

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

ACEC OC February 22, 2017

Directions to GMC Middle School Game Sites (updated 8/20/13)

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Transcription:

Future Projects District 3 Central Minnesota 2019 2022 mndot.gov/d3

Lake 371 2019-2022 Construction 200 Walker 34 CASS 200 Remer 6 Central Minnesota MnDOT District 3 Hackensack 371 84 Longville 6 Hill City Backus 87 Ou ng 87 84 Menahga Emily Pine River 371 CROW WING 6 Sebeka Jenkins 64 Hassman Pequot 2018-2019 Construct Lakes 71 Deerwood 2019 WADENA Wadena Crosby CASS Nisswa Ironton 2019-2020 2020 29 6 10 2021 Brainerd Glen Staples Hewi Baxter Malmo 18 2022 18 Motley Pillager Bertha Lake 47 Garrison Mille Lacs AITKIN T O D D 10 371 18 Eagle Bend Camp 71 Cushing Ripley Vineland Isle Woodland Browerville Randall 115 Lastrup Cove Onamia Li le Falls Pierz MILLE LACS 65 Long Prairie Genola KANABEC Osakis MORRISON Mora Brook 287 Swanville Park 28 10 238 107 Royalton Li le Rock Ogilvie Grey Eagle Upsala 70 Rice Milaca Brunswick Bock 28 Sauk Centre BENTON 23 Westport 47 Braham 94 71 Albany 237 Sauk Foley Sartell Rapids Pine Brook Meire New Munich Elrosa Grove Avon Waite 95 Cambridge Collegeville Park Brooten St. Cloud 4 STEARNS Princeton 10 ISANTI Cold Spring Isan Lake Richmond St. Clear SHERBURNE Belgrade Henry Augusta Lake 55 23 Zimmerman 22 Clearwater Paynesville 15 Becker 24 94 Big Lake Kimball Convert to Freeway 55 South Haven 2020-2021 2023-2024 4 N Eden Valley Mon cello Elk River ANOKA MEEKER 2019-2021 101 Annandale Anoka Albertville Otsego WRIGHT St. Michael 241 METRO Project Buffalo 94 Rogers 2020-2021 Rockford Maple Grove Cokato 12 55 Montrose 494 Howard Lake Watertown Delano 12 Minnesota Department of Transportation

2019 Construction 4 Stearns Reconstruct the road surface (reclaim) from Hwy 55 to I-94 (excludes Lake Henry done 2018 and Meire Grove reconstruct 2020) $6.0 M 6 Crow Wing Install Cuyuna Lakes State Trail pedestrian tunnel under Hwy 6 in Crosby (City led) $1.0 M 6 Crow Wing Cass 10 Wadena Otter Tail Resurface (mill and overlay) and improve Hwy 6, north of Olander Rd to south Emily and north Emily to Outing; improve pedestrian access in Outing Reconstruct from 3 rd St NW to 2 nd St NE in Wadena; upgrade signals, city storm sewers and pedestrian accessibility. Resurface west of Wadena to Bluffton and east of Wadena to Oink Joint Rd. Add new left turn lane at CR 75 (Yr 1 of 2) $7.0 M $10.0 M 15 Stearns Resurface (reclaim) from Hwy 55 in Kimball to 66 th Ave in St. Augusta $8.0 M 18 Replace bridge on Hwy 18 over Morman Creek (D1 funds, D3 design) $800,000 Wright Resurface and improve Hwy from 7 th St South to Hwy 12 in Montrose (City led) $500,000 Wright Resurface (reclaim) an improve drainage on Hwy from Hwy 12 in Montrose to 10th St in Buffalo; includes box bridges north of Hwy 12 and three miles south of Buffalo Morrison Reconstruct from 6 th St W to 2 th St E; includes pedestrian sidewalks, city sewer and water in Little Falls. Resurface from 15th St W to 6th St W and 2nd St E to 9th St E. 55 Wright Resurface (reclaim) and repair/replace drainage pipes from Poplar St in Annandale to Hwy in Buffalo 55 Stearns Resurface (mill & overlay) and improve road from Kandiyohi/Stearns county line to east of Paynesville, includes bridge updates over railroad west of Hwy 23 65 Isanti Install a Continuous Green T intersection at Hwy 107/Hwy 65 in Braham in Isanti County for improved safety and traffic flow 65 Isanti Install a Reduced Conflict Intersection (RCI) at Hwy 65/Cajima St NE in Isanti (City led) $6.9 M $3.8 M $9.9 M $1.7 M $1.0 M $600,000 71 Wadena Install railroad tracks crossing gates at Hwy 71 and Jefferson St in Wadena $300,000 I-94 Stearns Reconstruct parking area at Fuller Lake Rest Area along westbound I-94 $1.5 M I-94 Stearns Re-deck CR 159 bridge surface over I-94 at Collegeville (Local access detour) $600,000 I-94 Wright Reconstruct and add a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19 ($56 M Corridors of Commerce funds; Yr 1 of 3; Design-Build) $65 M Mille Lacs Restore bridge over White Fish Creek two miles south of Crow Wing county line $1.7 M Crow Wing Reconstruct 14 miles of road surface (reclaim), replace/repair pipes and improve access from the end of the four-lane in Brainerd to Ironton $6.9 M Crow Wing Construct and expand Cypress Dr intersection and road in Baxter (City led; Yr 2 of 2) $7.5 M 371 Crow Wing Landscape along new four lane in Nisswa, Pequot Lakes and Jenkins (Yr 2 of 2) $200,000 371* Cass Upgrade railroad signal system at Hwy 371/Aspen Ave in Cass Lake (D2 construct) $5,000 371* Cass Construct center left turn lane at Shingobee Rd in Walker (D2 construct) $300,000 371* Cass Urban reconstruct from railroad tracks to Hwy 2 in Cass Lake (D2 construct) - $1.5 M

2020 Construction 10 Wadena Otter Tail Reconstruct from 3 rd St NW to 2 nd St NE in Wadena; upgrade signals, city storm sewers and pedestrian accessibility. Resurface west of Wadena to Bluffton and east of Wadena to Oink Joint Rd. Add new left turn lane at CR 75 (Yr 2 of 2) 15 Stearns Resurface (reclaim) and upgrade sidewalks, from the railroad crossing to Hwy 55 in Kimball 12 Wright Resurface (mill and overlay) Hwy 12 from Sunset Ave to 7 th St SE in Cokato, upgrade pedestrian access and improve signalized intersection at CR 3 12 Wright Resurface (mill and overlay) from Zephyr Ave in Montrose to north of Bridge Ave in Delano $10.0 M $1 M $1.5 M $3.1 M 18 Crow Wing Replace bridge over Portage Creek west of Hwy 6 $750,000 23 Benton Construct a Reduced Conflict Intersection (RCI) at Benton CR 8 east of St. Cloud $500,000 23 Benton Resurface (mill and overlay) from Benton CR 1 in St. Cloud to Hwy 95 east of St. Cloud 24 Wright Resurface (mill and overlay) from Hwy 55 to north of Poplar Ave in Annandale, includes pedestrian access improvements $2.3 M $1.9 M 28 Stearns Replace bridge over stream west of south junction Hwy 71 near Sauk Centre $602,800 47 Kanabec Resurface (reclaim) from Hwy 23 in Ogilvie to Hwy in Isle and replace bridge over stream five miles north of Ogilvie, replace bridge over Little Ann River north of west junction of Hwy 23 47 Replace bridge over Morman Creek just north of Malmo on Hwy 47 (D1 funds, D3 design/construct) $11.4 M $600,000 71 Todd Replace bridge over Long Prairie River in Long Prairie $2.7 M 84 Cass Replace bridge over rway Brook Dam in Pine River $3.3 M Mille Lacs Install Reduced Conflict Intersections (RCI) at Mille Lacs CR 11, CR 12 and CR 13 near Milaca (safety partnership project) $1.8 M I-94 Stearns Construct exit loop ramps at the Hwy 23 interchange south of Waite Park $2.2 M I-94 Wright Reconstruct both directions of road surface from east of Wright CR 39 in Monticello to Hwy 24 in Clearwater (Yr 1 of 2) Install noise wall barrier along westbound I-94 in Monticello. I-94 Wright Construct eastbound Freight Enforcement pull-in lane west of Hasty, before Enfield Rest Area I-94 Wright Reconstruct and install a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19. ($56 M Corridors of Commerce funds; Yr 2 of 3; Design-Build) $60 M $500,000 $65 M 238 Stearns Construct a new roundabout on Hwy 238 (Railroad Ave/1st St) in Albany (City led) $605,000

2021 Construction 4 Stearns Reconstruct from 2 nd Ave S to 2 nd Ave N and improve pedestrian access in Meire Grove 6 Itasca Resurface (reclaim) and improve roadway from Cass/Itasca county line to Hwy 2 west of Cohasset (D1 funds, D3 design) $1 M $5.3 M 10 Sherburne Reconstruct from Xenia Ave to 4 th St and improve pedestrian access in Elk River - $8.8 M 12 Wright Resurface (mill and overlay) from 13 th Ave in Howard Lake to Montrose and improve pedestrian access 55 Stearns Resurface (mill and overlay) and improve pedestrian access in Brooten and Belgrade 55 Wright Resurface (mill and overlay) from Meeker/Stearns county line to west of Poplar Ave in Annandale and upgrade pedestrian sidewalks and signals in Annandale - $4.6 M - $1.5 M $4.5 M 95 Isanti Resurface (reclaim) from CR 15 west of Pine Brook to Cambridge $6.8 M I-94 Wright Reconstruct both directions of road surface from east of CR 39 in Monticello to Hwy 24 in Clearwater (Yr 2 of 2) I-94 Wright Reconstruct and install a new lane on both directions of I-94 between St. Michael and Albertville, includes the bridge interchanges at Hwy 241 and CR 19. ($56 M Corridors of Commerce funds; Yr 3 of 3; Design-Build) 200 Cass Resurface (reclaim) and widen shoulders from south junction Hwy 371 near Walker to Hwy 84 near Longville (D3 funds, D2 construct) Crow Wing Reconstruct from 2 nd St SW to 3 rd Ave NE in Crosby and resurface (mill and overlay) from west of 7 th Ave in Ironton to 2 nd St SW in Crosby, and upgrade pedestrian sidewalks $60 M $65 M $10.6 M $5 M

2022 Construction 2* Cass Resurface (mill & overlay) from end of the four lane in Cass Lake to CR 10 $2.3 M 2* Cass Isanti Resurface (mill & overlay) from Cass CR 19 to Isanti CR 18 $7.7 M 6 Cass Resurface from Cass CR 4 to Hwy 200 in Remer - $1.3 M 10 Benton Replace bridge west of Benton CR 33 near Rice $820,000 10/23 23 47 Benton Benton Mille Lacs Crow Wing Wright Todd Douglas Mille Lacs Reconstruct the Hwy 10/Hwy 23 interchange accesses and bridges, and install multimodal improvements in St. Cloud Reconstruct the road surface (unbonded concrete overlay) from Foley to Milaca; construct a new roundabout in Foley $30.3 M $14.0 M Replace bridge over BNSF railway in Brainerd, includes bike/pedestrian trail $4.0 M Reconstruct from 1 st St to Settlers Parkway in Buffalo, includes new roundabout at CR 12 and pedestrian sidewalks Resurface roadway (reclaim) from I-94 in Osakis to Hwy 71 south of Long Prairie; and replace three bridges, and add a pedestrian trail bridge Resurface (mill & overlay) and improve Hwy 47 from Hwy in Isle to 305 th Ln north of Glen in and Mille Lacs Counties $6.2 M $14.8 M $5.2 M 65 Kanabec Replace bridge over the Snake River in Mora $3.6 M 71 Todd Replace bridge over Drayer Creek and Harris Creek in Browerville $1.4 M I-94 Stearns Replace bridges over BNSF railway west of the Hwy 23 interchange near St. Joseph TBD $6.0 M 95 Isanti Construct new roundabout at the Hwy 47/95 intersection near Pine Brook $1.8 M 371B Crow Wing Crow wing Reconstruct road surface (unbonded concrete overlay) and widen shoulders from to the Mississippi River in Hassman, replace bridge Smoothen and rehab the concrete road surface (diamond grind) from Deerwood to Reconstruct from Joseph St to Greenwood St in Brainerd and resurface (mill & overlay) from Greenwood St to 70 th Ave, south of Brainerd 371 Crow Wing Install Reduced Conflict Intersections (RCI) to improve access at CR 1/Gull Lake Dam Rd and CR 126/Green Gables Rd (safety partnership project) $14.0 M $3.5 M $6.0 M $1.8 M