Octagon Vinyl Gazebo Assembly Instructions

Similar documents
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

Assembly Instructions

10 Octagon Cedar Gazebo Assembly Instructions

The Festival Assembly Instructions

V nyl Gazebo truct c it Assembly Instr ons

KIT ASSEMBLY INSTRUCTIONS

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

Oval Vinyl Gazebo. Assembly Manual

Vinyl Gazebo Instructions

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

Keystone Garage Assembly Manual

Gambrel Barn with Overhang Manual

AMISHGAZEBOSHOP.COM VINYL GAZEBO KIT CONTENTS

Octagon Greenhouse Manual

Renaissance Pavilion. Assembly Manual

Sunhouse. Assembly Manual

12ft Octagon Bayside Gazebo Assembly Manual

10ft Octagon Bayside Gazebo Assembly Manual

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Artisan Vinyl Pergola

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

Country Cabin. Assembly Manual. HomePlace Structures

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

Classic Saltbox Manual

12' Octagon Wood Gazebo

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Star Barn Manual. Tools Needed:

Best Barns USA Assembly Book Revised November 3, 2016

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014

Precut Workshop & Gable Manual

Best Barns USA Assembly Book

Best Barns USA Assembly Book

REGENCY TIMBER BUILDINGS

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: SUN GAZEBO WITH SLIDING DOORS

Log cabins. Pentagon log cabin models ASSEMBLY INSTRUCTIONS. Recommended tools Cordless screwdriver

Wooden Rectangle Pergola Assembly Manual

Shed Assembly Instructions

Track Rack. * Track Racks are not lockable

10x10 Trellis Pergola

RangerWare Fiberglass Door System Installation Instructions P/N

Best Barns USA Assembly Book

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016

Rockwell 4-in-1 Sliding Door

Precut Value Shed Manual Gambrel Barn

Best Barns USA Assembly Book

Assembly Instructions Eggstreme Chicken Coops

Baby Grande with Crank, Housing, and Side Rails Installation Instructions

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016

Shetland Stalls Installation Instructions

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

Metro Series Sauna. installation instructions

10 x 10 Flat Top Two Tone Pergola

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Installation Instructions

12x12 Pavilion. Assembly Manual

Best Barns USA Assembly Book

Best Barns USA Assembly Book

PATIO INSTALLATION MANUAL

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Screen Kit For Octagon Gazebo Assembly Manual

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

Sliding Door Kit

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

Best Barns USA Assembly Book

Stag Hanger ASSEMBLY INSTRUCTIONS

Best Barns. the Cypress R 10' x 16' Assembly Book. revised February 19, 2016

Best Barns USA Assembly Book

Assembly Instructions 10 X 10 Aluminum Roof Support

ATLANTIS RAIL Contact Information

Best Barns USA Assembly Book

Double Beam Freestanding Pergola Installation Guide

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

TWIG Hanger ASSEMBLY INSTRUCTIONS

MONKEY BARS OVERHEAD RACK INSTALLATION

Best Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016

BLACK WIDOW COMPOSITE

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Heavy Duty I-Beam Trolley

Building An Outdoor Playhouse

INSTALLATION INSTRUCTIONS

Best Barns USA Assembly Book

Vertical Offset Base and Safety Rail System Installation Instructions

The Devonshire Arbor 85 in

Pillar Hanger ASSEMBLY INSTRUCTIONS


Spoked GARRICK HANGER

southpaw enterprises, inc.

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Best Barns USA Assembly Book

Heartland Pergola. Assembly Manual

Curium 19.4H Installation Instructions & Parts List

x2 1/4 (6mm) Floor Anchor


Transcription:

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown

revised 04/29/09 Vinyl Gazebo Assembly Instructions Please read through the entire manual before starting! Note: It is very important that you have a firm, level site for the structure. When using tools and ladders, always follow manufacturer s recommended safety guidelines! Tools Needed: Sharp Utility Knife 5/8 Socket Socket Wrench 5/8 Wrench Hammer Stapler Cordless Drill Ladder Tape Measure Hammer Flathead Screwdriver Level Additional Items Needed: Approximately 4-5 bundles of shingles When your kit arrives, it should look like this. Inspect the package for any damage that may have occurred during shipping - dented corners, punctured plastic, etc. If the package is damaged, alert HomePlace Structures immediately at 866.768.8465.

VINYL OCTAGON GAZEBO s p e c i f i c a t i o n s 12 unit shown (10 unit also available) Shingles (Supplied By Customer) 1x6 Tongue and Groove Yellow Pine Ceiling Permatrim Fascia (3) Hanging Plant Hooks 6 8 High Door Opening 4x4 Vinyl Wrapped Wood Posts 36 High Railings (2) Flower Boxes 9 8 Total Height without optional cupola Fiber Composite Decking Optional Floor Find the assembly manual for this product at www.homeplacestructures.com/manuals The Vinyl Octagon Gazebo kit includes modular railing section, posts, braces, roof sections, and optional floor sections with maintenance-free boards. Made from the finest maintenancefree materials on the market, this gazebo is built to last for generations. The vinyl coating prevents color fading and the rust-resistant fasteners provide durability and strength.

This assembly manual is to be used to assemble a HomePlace Structures 10 or 12 octagon gazebo. The 10 model was used to create this manual. If you purchased a 12 unit, some of the pictures will differ from your unit. Gazebo without floor Gazebo with floor Gazebo floor only Step 1: Gazebo kit should arrive as shown, depending on which unit was purchased. Place kit as close to site as possible. If your unit does not include a floor, please proceed to page 11. Floor Framing Assembly It is very important to build the floor on a firm, level surface. Step 2: Very carefully cut the packaging bands holding the boxes together. Step 3: Remove the lid of box including the pressure treated sub-floor pieces. Step 4: Remove the contents of the box and organize like parts together. Set parts close to assembly location. Step 5: Use a tape measure to find and mark the location of the center of gazebo floor. page 01

Step 6: Locate the double floor joists with notch cut at one end. Step 7: Use the mark from step 5 and lay out double floor joists making sure to keep notched end up and towards center as shown. Step 8: Lay out the eight perimeter band boards as shown. Step 9: Align the edge of the band board with center of the double joist and attach each end using two 3 screws in the pre-drilled holes. Note: It is important that the top edges of the band board and joist are aligned flush. page 02

Step 10: Align corner of adjacent band board and attach using 3 screws in pre-drilled holes. Step 11: Repeat steps 9 & 10 until all band boards are installed. Step 12: Insert connecting plates double joists as shown. Note: If opening is tight, step on connecting plates to push them down. page 03

Step 13: Center double joist along edge of center board and attach using 3 screws. Note: There may be some space between joist and connecting plate, but it should not exceed 1/4. Step 14: Repeat step 13 for each of the remaining double joists trying to keep an equal space between the joist and connecting plate for each board. Floor is now ready for installation of middle joists. Step 15: Locate the 16 middle floor joists. Incorrect angle alignment 16: Place one middle joist in each floor section. Note: Make sure to properly align cut angles of joist. page 04

Step 17: Arrange middle floor joists to match pattern shown in picture. Step 18: Align joist with pre-drilled holes in band board. Step 19: Attach band board to middle joist using 3 screws in predrilled holes. Step 20: Attach middle joists to double joist using two 3 screws as shown. Step 21: Repeat steps 18-20 for the remaining middle joists. page 05

Floor Board Installation Step 22: Open the box containing the floor boards. Step 23: Organize floor boards near floor framing as shown. Step 24: Place each of the outside floor boards around the perimeter of the floor. Step 25: Align floor board at center of double joist. Step 26: Attach floor board to floor framing using one 2-1/2 screw as shown. Note: It is recommended to put remaining screws in pre-drilled holes after each of the perimeter boards are in place. page 06

Step 27: Align opposite end of board with center of double joist. Step 28: Make sure the overhang is consistent along the entire edge of board. Step 29: Attach floor board using one 2-1/2 screw as shown. Step 30: Repeat steps 25-28 and install adjacent floor board and attach using one 2-1/2 screw at each end. Step 31: Install remaining perimeter floor boards repeating steps 25-29. page 07

Step 32: Lay out the next complete row of floor boards before attaching any. Step 33: Align boards with edges of floor joists. Step 34: Attach boards to floor joists using 2-1/2 screws. Note: There should be a 1/8-1/4 space between the rows. Step 35: Pre-drill one 3/16 hole above middle floor joist. Step 36: Attach floor boards to middle joist. Step 37: Repeat steps 33-36 for remainder of floor boards in that row. page 08

Step 38: Repeat steps 32-37 for each remaining row of floor boards. Step 39: Install center floor pieces as shown. Note: The center board may require additional force in order to make it fit. Step 40: Attach middle floor boards to sub-floor using 2-1/2 screws through pre-drilled holes. Floor board installation is complete. page 09

Band Board Trim Installation Step 41: Slide the first band board trim piece in place and align at center of floor corners. Step 42: Make sure trim piece is up tight against bottom of floor board. Step 43: Attach trim board to sub-floor using 1-1/2 white screws in pre-drilled holes. Step 44: Align adjacent trim piece and attach repeating steps 41 & 42. Step 45: Repeat steps 41-44 around perimeter of gazebo. page 10

Post & Bottom Railing Assembly Note angle of posts Note: When installing posts, angle at top of posts should slope down toward outside of gazebo. Step 1: Place package as close to assembly site as possible. Step 2: Carefully cut packaging bands. Step 3: Carefully cut open shrink wrap, making sure not to allow product to fall off of the skid. Step 4: Remove the four packages of posts from the skid. page 11

Step 5: Cut open the posts by running a knife in between the posts. There are two different post configurations Standard post with four angled railing inserts (6) Door post with only two railing inserts (2) Warning: Be very cautious to not cut into the posts. This will damage them permanently. Step 6: Set all posts aside. Step 7: Remove bottom railing box from the skid, place in close proximity to assembly site, and remove lid. Each railing section consists of a top T-rail and bottom straight rail. Step 8: Locate and open the box containing the railing spindles. page 12

Step 9: Locate one doorway post at appropriate location making sure to keep the angled cut at the top of the post turned correctly. Step 10: Locate a bottom rail piece. Step 11: Slide bottom rail onto railing insert, making sure to keep holes facing up as shown. Step 12: Attach bottom railing to insert using 1 railing screws in predrilled holes on outside and inside of railing. Note: Make sure railing section is tight against post before fastening. Step 13: Insert railing spindles into bottom railing piece as shown. page 13

Step14: Insert railing spindles into top railing piece as shown. Step 15: Slide the top railing onto the railing insert and attach as shown. Step 16: Locate a standard post with four railing inserts and slide top and bottom railing pieces onto inserts as shown. Step 17: Push railing tight against post and attach using 1 screws. page 14

Step 18: Repeat steps 11-17 for adjacent railing section. Step 19: Continue around perimeter of gazebo until all bottom railing sections are installed. Top Brace Installation Step 20: Remove a top brace section from box and pull grooved slot into top of posts as shown. page 15

Step 21: Continue installing brace sections around perimeter of gazebo repeating step 20. Step 22: Pull brace section down tight against top of post, align centered on post, and attach using 2-1/2 white screws through pre-drilled holes. Step 23: Continue around perimeter of gazebo until all brace sections are fastened to posts. page 16

Step 24: Center posts on floor splice, space an equal distance from edge of floor, and fasten into floor using 2-1/2 white screws. Note: If you did not purchase the optional floor kit, space posts equally and attach to the foundation using appropriate fasteners. All posts should be positioned an equal distance from one corner of the gazebo to the opposite corner. Rafter Installation Step 25: Remove rafter box from skid and unpack components. Step 26: Place a step ladder in the center of the gazebo. Step 27: Prepare roof bolts by putting a nut and washer on one end of the bolt as shown. page 17

Step 28: Slide the rafter into the slot at the top of the post as shown. Step 29: Align the hole in the rafter with hole on the post and push a bolt through. Step 30: Put a washer and nut on the opposite end of the bolt and tighten by hand. Step 31: Repeat steps 28-30 for rafter on opposite side as shown. page 18

Step 32: Push compression ring into place, pull rafters tight against lip, and attach using 2-1/2 screws through pre-drilled holes as shown. Step 33: Repeat steps 28-32 for next set of rafters as shown. Step 34: Install 4 remaining rafters repeating previous steps as shown. Step 35: Tighten acorn nuts with tools after all rafters are installed. page 19

Roof Band Board Installation Step 36: Insert four 2-1/2 screws in the pre-drilled holes in each band board. Step 37: Align band board with top of rafter and at the center of the rafter splice and attach to rafters. Step 38: Align opposite end of band board and attach. Step 39: Align adjacent board. Step 40: First attach adjacent band board at opposite corner. Step 41: Pull band board into place, align with first rafter, and attach. Step 42: Continue installing band boards around entire perimeter of gazebo. page 20

Roof Board Installation Step 43: Locate box containing roof boards, open box, remove parts, and organize as shown. Step 44: Center roof board at rafter splice, align flush with edge of band board, and attach using 2 nails. Step 45: Slide groove of next roof board into the tongue on the previously installed board and attach with two nails at each end as shown. Step 46: Repeat step 45 until entire section is complete. Step 47: Repeat steps 44-46 for each roof section. page 21

Roof boards are now complete. Face Board Installation Step 48: Align top of face board flush with top of band board and at center of edge of corner splice. Attach face board using 2 white screws in pre-drilled holes. Step 49: First align and attach adjacent face board at opposite corner. Step 50: Align corners of face boards and attach to band board. Step 51: Continue installing face board around perimeter of gazebo. page 22

Felt Paper Installation Step 52: Attach felt paper to roof boards using a hammer stapler as shown. Roof Bracket Installation Step 53: Center the bottom point of roof bracket and fasten to roof using 10d nails as shown. Note: Make sure nails go into rafters and 2x4 face board and do not protrude through bottom of ceiling/roof boards. Flower Box Installation Step 54: Install flower boxes where desired using 2 white screws. page 23