The impact of public policies on EMF exposure and wireless broadband growth. Mario Frullone Deputy CEO

Similar documents
Country Case Study: ITALY

Electromagnetic Fields, Mobile Telephones and Health

Acceptable Electromagnetic Field levels for cost-effective 5G implementation Polish case study

Regulatory Framework for RF Safety in Mauritius

Italian Environmental Policy on Electromagnetic Pollution: limits and monitoring.

Brazil Experience and Activities Regarding Human Exposure to EMF

EU Standards dedicated Mobile and Base Station

5G Implementation in Europe and CIS. Setting the scene on EMF and 5G. István Bozsóki

Brief CV of Mr. Viresh Goel,

Eur Ing Laurent Bodusseau BEng(Hons) CEng MIET FM49 Chairman, ANFR - France Riding the (RADIO)waves of change Bucharest, September 26th, 2016

ITU-D activities on EMF

Reiner Liebler, Head of Division Technical Regulation & EMC. Federal Network Agency. Brussels, 30 June 2010

HAPS / WRC-19 agenda item 1.14

EMC aspects associated to 5G networks

WLAN. Date: 20 October 2016

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

RF exposure impact on 5G rollout A technical overview

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

MEMORANDUM OF UNDERSTANDING BETWEEN ANCI AND THE MINISTRY OF COMMUNICATIONS

Health Issues. Introduction. Ionizing vs. Non-Ionizing Radiation. Health Issues 18.1

Regional Forum for Americas Region: IMT Systems - Technology, Evolution and Implementation

TV White Spaces white space device requirements

Outcomes of ITU WRC-12 for IMT & other mobile broadband

Prof. Dr. Peter Wiedemann Karlsruhe Institute of Technology Germany

Product Compliance Assessments of Low Power Radio Base Stations with Respect to Whole-Body Radiofrequency Exposure Limits

ITU-T activities on Human Exposure to Electromagnetic Fields (EMFs)

Simple Guide to In-Building Coverage Systems

1 Dockland Central, Guild St, Dublin 1 1 Lárcheantar na ndugaí, Sráid na ngildeanna, BÁC 1 Tel Teil

1 Dockland Central, Guild St, Dublin 1 1 Lárcheantar na ndugaí, Sráid na ngildeanna, BÁC 1 Tel Teil

PhD in Civil and Environmental Engineering

Statement on the Authorisation of Short Range Devices in 870 to 876 MHz and 915 to 921 MHz

SPECTRUM MANAGEMENT A VIEW FROM THE ITALIAN ADMINISTRATION

Biljana Tanatarec Doron Net d.o.o. ISO/HZN National Workshop on Social Responsibility Zagreb, 9 10 September 2010

TV White Spaces devices: how to avoid interference?

Variation of UK Broadband s spectrum access licence for 3.6 GHz spectrum

RESPONSE. SECOND 700 MHz SPECTRUM POLICY CONSULTATION DOCUMENT

Table 1: OoB e.i.r.p. limits for the MFCN SDL base station operating in the band MHz

SaskTel Comments: Gazette Notice SLPB Consultation on Releasing Millimetre Wave Spectrum to Support 5G. September 15, 2017.

Tariq H Alamri ITU-T Study Group 5 Vice-Chairman Communications and Information Technology Commission (CITC), Saudi Arabia

Use of the 5 GHz Shared Band for the Provision of Public Mobile Services. Consultation Paper. 1 February 2018

My name is Walid Sami, I work in the Technology & Innovation department of the European broadcasting Union in Geneva. I would like to thank the DG

Requirements on 5G Development Device manufacturer s perspective

COMMISSION IMPLEMENTING DECISION

Comments of Rogers Communications Canada Inc. August 15, 2017

Telecommunications Authority of Trinidad and Tobago Draft Consultative Document

Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034

Radio-frequency arrangements for systems of the fixed service operating in sub-bands in the GHz band

13460/15 CB/ek 1 DGE 2B

Experimental Compliance Testing of Telephony Base Stations, Broadcast Stations, and General Mobile Transmitters

Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols

Telecommunications Regulation in Jamaica - the Challenges of New Technologies

ESIMS - Mobile broadband provision on a global scale: an harmonised regulatory approach

ETSI EN V1.2.1 ( )

Spectrum Requirements for 4G Wireless Systems

Response of Boeing UK Limited. UK Ofcom Call for Input 3.8 GHz to 4.2 GHz Band: Opportunities for Innovation 9 June 2016

Protection from electromagnetic environment effects

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

Coexistence challenges of the evolution in the use of the UHF band The contribution of standards in the 700MHz band and other possible measures

I Need Your Cost Estimate for a 10 Year Project by Next Week

RADIO SPECTRUM COMMITTEE

Indonesia s Preparation for WRC-19

EXPOSURE OPTIMIZATION IN INDOOR WIRELESS NETWORKS BY HEURISTIC NETWORK PLANNING

Decision. On the authorization regime governing mobile satellite service (MSS) systems in the 2 GHz band

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band

Recommendation ITU-R M (10/2015)

Satellite Interference Mitigation: Global Trends and Implications

MIC MRA WORSKHOP 2015 Fast SAR Trends, Standardization & Regulatory Status. Dr. Benoît Derat, CEO, ART-Fi SAS

Testing activities of NCA Type Approval Testing labs and key challenges. Kofi Ntim Yeboah-Kordieh National Communications Authority

ASIA-PACIFIC BROADCASTING UNION (ABU) POSITION ON WRC-12 AGENDA ITEMS 1.4, 1.10, 1.14, 1.15, 1.17, 1.19, 1.22 AND 1.25

ECC. Doc. ECC(08)038 CEPT. 20 th Meeting Kristiansand, June Date issued: 23 rd May Subject: Password protection required?

Impact of 5G technology on human exposure

Lecture 1 - September Title 26, Ultra Wide Band Communications

Huawei response to the. Ofcom call for input: 3.8 GHz to 4.2 GHz band: Opportunities for Innovation

INTRODUCTION well below

Base Station Power Requirement Analysis For Maximized Performance Level For Wcdma Based 3g Services

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

Policy for Allocation and Assignment of Spectrum 2.5GHz Band (2500MHz MHz)

TOOL #21. RESEARCH & INNOVATION

Prudent Avoidance Policy on Siting Telecommunication Towers and Antennas

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

CLEAN DEVELOPMENT MECHANISM CDM-MP58-A20

Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Tel Fax Web

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT. pursuant to Article 294(6) of the Treaty on the Functioning of the European Union

Spectrum Release Plan

Report approved on 01 March 2016 by the ECC

MINERVA: IMPROVING THE PRODUCTION OF DIGITAL CULTURAL HERITAGE IN EUROPE. Rossella Caffo - Ministero per i Beni e le Attività Culturali, Italia

GVF Response to the public Consultation Process Published by ICASA:

ESA Iris Programme Analysis & definition of the Satellite System Operations. Briefing 28 July

Building Canada s Advanced Wireless Networks: Protocol Development

Low-EMF Best Practices

Spectrum Bands for 5G: Current status of technical work in ECC PT1 and EETT

Policy on Non-Ionizing Radiation in Israel

ITU-T Study Group 5. EMF Environmental Characterization

Radio-frequency channel and block arrangements for fixed wireless systems operating in the 42 GHz (40.5 to 43.5 GHz) band. Recommendation ITU-R F.

14 January Mr. Larry Shaw Director General Telecommunications Policy Branch Industry Canada 300 Slater Street Ottawa, Ontario K1A 0C8

Transcription:

The impact of public policies on EMF exposure and wireless broadband growth Mario Frullone Deputy CEO ITU Workshop on Human Exposure to Electromagnetic Fields (EMFs) Turin, Italy - 9 May 2013

The impact of policies considered to be precautionary The Italian regulatory framework dates back to 1998, before the issuing of ICNIRP Guidelines and European Recommendation 1999/519/EC. Regulators privileged a cautious approach to give response to the emerging public concern, rather than endorsing evidence-based protection policies. Subsequent regulatory evolution in 2001 and 2003 confirmed the original framework and reaffirmed the role of political choices over scientific guidelines.

Fundamental of the Italian Regulation The Italian law is based on 3 different protection levels, expressed in terms of radiometric quantities (e.g. Electric field) averaged over 6 minutes intervals: Exposure levels, aimed at ensuring protection against acute health effects Attention thresholds for the protection against possible long-term effects Quality targets, which realises in fact the prudent avoidance approach All the 3 different protection levels set limits well below ICNIRP thresholds MHz

Authorisation and control As for exposure assessment due to SRBs the law foresees two separate steps AUTHORISATION BEFORE THE SRB DEPLOYMENT As common offices, Agencies adopt cautious assumptions for theoretical simulation in the authorisation process (e.g. maximum emitted power, free space conditions, etc.) CONTROL AFTER THE SRB DEPLOYMENT On-field controls are realised through measurement campaigns; measurements are actually performed for a subset of SRBs

Practical fall-out of the Italian approach The application of the Italian law affects the EMF exposure and wireless broadband scenario in a number of ways, among which: Significant local differences between theoretical and actual exposure levels, due to the cautious assumption adopted in the authorisation process. Exposure levels over the landscape much lower than imposed thresholds Additional constraints on networks layout and sub-optimal network plan (mobile terminals not working with the lowest possible power emission)

Fall-out: Authorisation vs control On spot measurements Monitoring Analysis on the front building: observation point B high floor balcony

V/m Fall-out: simulation vs measurements 7 Quality target (V/m) On spot measurement (V/m) Ray tracing simulation (V/m) Free space evaluation (V/m) Monitoring (V/m) 6 5 4 3 2 1 0 Gap between simulation (authorisation) and measurements (control) 17/11/2008 4/12/2008 Observation point B

Fall-out: exposure over time Common procedures adopted for authorisation reflects in EMF exposure levels significantly lower than imposed thresholds, which remain stable over years. In Piedmont more than 80% of samples are below 3 V/m. 14 4 Source: FUB 2006 82 9 Source: ARPA 2010 <3 V/m <3 V/m POSITIVE OR 3-6 V/m NEGATIVE? 3-6 V/m 6-20 V/m 6-20 V/m >20 V/m >20 V/m EMF exposure levels in Piedmont have been considered for comparison between results from the Italian national monitoring network (dismissed as a whole in 2006) and from ARPA monitoring activities. 5 86

Is there electromagnetic room for new technologies on the existing SRB? Strict assumptions for authorisation pose additional undue and unnecessary constraints on wireless broadband network deployment. As an example, 20% of current sites in Bologna cannot support the installation of any further technology (from data supplied by ARPA). Similar claims come from MNOs: Turin Florence and Bologna Compliant sites Non compliant sites Compliant sites with no space for further installation Source Telecom Italia Current Additional Dual Carrier Additional Dual Carrier + LTE

The need for evolution in regulation The evolution of regulation represents an ambitious challenge in a public concern-limited scenario. Difficult fulfilment of different requirements: Public health safeguard Feasible application of procedures foreseen by the law Wireless broadband growth A Working Group composed of several Ministries (Economic Development, Environment and Health) and technical bodies (FUB, ISPRA/ARPA) was set up to suggest possible alternative solutions to the Regulator. The WG adopted the Impact Assessment methodology.

Impact assessment NO CHANGE scenario taken as reference for comparison with possible regulatory evolution Evaluation criteria for comparison and assessment of possible pros&cons: Impact on health and environment Potential effect on public concern Feasible application of procedures for authorisation and control Alternative scenarios: 1. Exposure assessment referred to 24-hour instead of 6-minute intervals 2. Exposure assessment referred to 4-hour instead of 6-minute intervals Adoption of ICNIRP/EU limits was considered as an unviable alternative.

Impact assessment outcome: pros&cons NO CHANGE 24-hour intervals 4-hour intervals Need for amendment of regulation in force Additional burden on Environment Agencies for authorisation and control SRB co-siting opportunities for new technologies NO YES YES NO YES YES LOW HIGH MEDIUM Risk of possible raise in public concern wrt raise of exposure thresholds ABSENT HIGH MEDIUM wrt number of new masts MEDIUM LOW MEDIUM New guidelines for the application of regulatory provisions Need for specific measurement equipment YES YES YES NO YES YES

The application of new rules: a long path? For the thorough application of the recently revised regulation (Oct 2012), some provisions have still to be issued: National and Local Agencies for Environment Protection ((ISPRA/ARPA) are in charge of the development of Application Guidelines. CEI (Italian Electrotecnic Committee) is completing relevant updated technical norms, for the proper application of the revised regulation. Both Application Guidelines and CEI technical norms are expected to be issued by the first semester of 2013.

Lessons learnt Costs of precautionary policies in terms of social impact and additional burden for economic growth. Once applied, precautionary policies represent a no-return path. Even in front of new regulatory provisions still very distant from ICNIRP/EU guidelines, there is an air of general worry on possible response from the public, which may condition the application of the law.