VOTANO 100. Accurate and mobile voltage transformer testing and calibration system

Similar documents
CT Analyzer. Current transformer testing, calibration and assessment

CT Analyzer. Revolution in current transformer testing and calibration

CT Analyzer. Test Set for Analysis of Metering Current Transformers According to IEEE C57.13 Standard

TESTRANO 600. Three-phase test system for comprehensive power transformer testing

TESTRANO 600. Three-phase test system for comprehensive power and distribution transformer testing

Advanced Test Equipment Rentals ATEC (2832)

CIBANO in-1 test system for medium- and high-voltage circuit breakers

EUROPE S LARGEST SELECTION OF TEST & MEASUREMENT EQUIPMENT FOR HIRE INLEC.COM. Nationwide Low Call

CP CU1. Coupling unit for line and ground testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

ACCURACY OF VOLTAGE TRANSFORMERS DESIGN CRITERIA AND A SURVEY ON THE PRECISION AND REPRODUCIBILITY OF A NEW MODEL-BASED CALIBRATION APPROACH

TRAX Transformer and Substation Test System

TRAX Transformer and Substation Test System

TESTRANO 600 ordering information

TRAX Transformer and Substation Test System

MPD 500. Partial discharge measurement system for routine test applications

Three-Phase Transformer Test Systems

CP Cu1. Advanced Test Equipment Rentals ATEC (2832) Multi-purpose coupling unit for CPC 100. Measurement System for

Advanced Test Equipment Rentals ATEC (2832) CIBANO in-1 test system for medium- and high-voltage circuit breakers

FRANEO 800. The next generation for a reliable core and winding diagnosis of power transformers

Primary Test Manager (PTM) Testing and management software for primary assets

CPC 100. Multi-functional Primary Test System for Substation Commissioning and Maintenance

Automatic Transformer Winding Analyser

FRAnalyzer. Reliable core and winding diagnosis for power transformers

STS Fully automatic. Large graphic display. Primary injection testing capabilities: up to 3000 A, with the optional module BUX 3000

Fluke 1740 Series. Three-Phase Power Quality Loggers Memobox. Assess power quality and conduct long-term studies with ease

World Leader in Innovative Power System Testing Solutions

Condition-based maintenance of power transformers Complete three-phase system Turns Ratio: Recovery Voltage: Winding Resistance:

Advanced Test Equipment Rentals ATEC (2832)

MPD 500. Partial Discharge Measuring System for Routine Test Applications

Fully automated three phase 250V Transformer Turns Ratio Meter

Specification for a Fully Automatic Meter Test Equipment for testing Three-phase/Single/Transformer operated/ reference Standard energy meters.

FRAX Series Sweep Frequency Response Analyzers

TMS 580. Transformer Loss Measuring System FEATURES BENEFITS APPLICATIONS

TTR2796. Fully Automated Three Phase 250V Transformer Turns Ratio Meter FEATURES AND BENEFITS APPLICATIONS

ODEN AT Primary Current Injection Test System

Fluke 1740 Series. Three-Phase Power Quality Loggers Memobox. Assess power quality and conduct long-term studies with ease

DUAL OUTPUT AC CURRENT/VOLTAGE TRANSDUCER

FRAX Series Sweep Frequency Response Analyzers

True Three-Phase Transformer Turns Ratio Tester TRT4x

MVCT. Megger VT & CT Analyzer. MVCT Megger VT & CT Analyzer

True Three-Phase Transformer Turns Ratio Tester TRT40A

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

CPC 100. Multi-functional primary test system for substation commissioning and maintenance

Specialists in HV and MV test and diagnostics. Testing in Substations

True Three-Phase Transformer Turns Ratio Tester TRT400

True Three-Phase Transformer Turns Ratio Tester TRT4x

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C

N. TEST TEST DESCRIPTION

Diagnostic testing of cast resin transformers

PDL 650. Acoustic PD Fault Localization in High-Voltage Equipment

Moving Test - MT3000

Frequency Response Analyzers for Stability Analysis and Power Electronics Performance Testing

Back to the Basics Current Transformer (CT) Testing

Multimeter 500CVD21 RTU500 series

Technical data ESA614 Electrical Safety Analyzer

Advanced Test Equipment Rentals ATEC (2832)

StarSine Power Quality Products

Cable test vans and systems

Alternative Testing Techniques for Current Transformers. Dinesh Chhajer, PE Technical Support Group MEGGER

Tap Changer Analyzer & Winding Ohmmeter RMO-TD Series

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

MPD 600. High-end partial discharge measurement and analysis system

PCT200 SERIES CT/PT TEST SYSTEM USER MANUAL

MIDAS Mobile Insulation Diagnosis & Analysing System. Features. Benefits. Applications

5790A Automated AC Measurement Standard

Tap Changer Analyzer & Winding Ohmmeter RMO60TD

N. TEST TEST DESCRIPTION

Transformer test equipment easy to use

CPC 100. Multi-functional primary test system for substation commissioning and maintenance

A Revolution in. Transformer EQUIVALENT CIRCUIT DIAGRAM OF A REAL CURRENT TRANSFORMER 1. by Benton Vandiver, Omicron

HYVA404 CTPT Analyzer instruction manual (V1.3.19) CT/PT Analyzer. User Manual (V1.3.19)

Embedded Generation Connection Application Form

TWA Series Three-Phase Winding Ohmmeters & Tap Changer & Winding Analyzers

Cable test vans and systems

Tap Changer Analyzer & Winding Ohmmeter RMO60TD

5080A Multi-Product Calibrator

Tap Changer Analyzer & Winding Ohmmeter RMO25TD

6135A/PMUCAL Phasor Measurement Unit Calibration System

Maintenance & Diagnosis Strategies. for. High Voltage Substations

MONTRANO. Continuous monitoring system for power transformers

ELECTRICAL POWER ENGINEERING

True Three-Phase Transformer Turns Ratio Tester TRT63B

Device circuit breakers Selective power distribution: branch out, individual adaptation, modular extension

MAVOWATT 4 Multifunction Power Meter

True Three-Phase Transformer Turns Ratio Tester TRT30A

True Three-Phase Transformer Turns Ratio Tester TRT30A

Mobile Instrument Transformer Test Systems. Mobile ITTS

MIT510/2, MIT520/2 and MIT1020/2

Diagnostic measurements on instrument transformers

Three-Phase Transformer Turns Ratio Tester TRT03B

True Three-Phase Transformer Turns Ratio Tester TRT3x

Three-Phase Winding Ohmmeter TWA25K

Three-Phase Transformer Turns Ratio Tester TRT03C

Three-Phase Transformer Turns Ratio Tester TRT03

Winding Ohmmeter & Tap Changer Test Set RMO40TD with Demagnetizer

Tap Changer Analyzer & Winding Ohmmeter RMO-TT

Connection Impact Assessment Application

MODEL INFORMATION. AccuLoss MODELS ALMS 2100, ALMS 4100, ALMS 4200, ALMS 6200 & ALMS 4300

BAUR Prüf- und Messtechnik GmbH Raiffeisenstrasse 8 A-6832 Sulz/Austria T. +43/5522/ F +43/5522/

Transcription:

VOTANO 100 Accurate and mobile voltage transformer testing and calibration system

Sophisticated testing of inductive and capacitive voltage transformers VOTANO 100: accuracy and portability At only 15 kg/33 lbs and compact in size VOTANO 100 is the first portable device to also offer high accuracy. It can be used for quick testing of inductive voltage* transformers (VTs) and capacitive voltage transformers (CVTs) for both protection and metering purposes. The measured results are automatically assessed in accordance with IEEE and IEC standards. VOTANO 100 uses an electrical modeling method which is already well-established and can be compared to that used by OMICRON s CT Analyzer. Its light-weight design makes it ideal for on-site tests and calibration tasks in power system grids. As a manufacturer or testing institute you can use VOTANO 100 in your production facilities and test/development labs. VOTANO 100 and VBO2: a safe and reliable combination VOTANO 100 is supplied with the separate voltage booster VBO2. This 4 kv amplifier provides the necessary test voltage during the ratio measurement. Its integrated switchbox automatically switches between the necessary test sequences. This facilitates fast and reliable tests as wiring to the secondary side only needs to be done once saving time and preventing failures. VBO2 is positioned close to the transformer under test while VOTANO 100 is operated in the safe area outside of the high-voltage environment. Software-guided workflow 1 Measurement of parameters 2 Modeling 3 IEEE/IEC assessment Software-guided and automated measurement of different VT/CVT parameters such as winding resistance, magnetization characteristics, etc. Determination of VT/CVT model elements and calculation of accuracy through embedded mathematical functions. Automated comparison of test results with the defined values in accordance with the selected IEEE or IEC standard. * In some countries, inductive voltage transformers (VTs) may also be referred to as potential transformers (PTs). This document will use the term voltage transformer. 2 Accuracy and portability: VOTANO 100 and VBO2

What VOTANO 100 can do for you > > Ratio and phase measurements > > Automated determination of VT/CVT accuracy > > considering different nominal voltage values > > considering different burden values > > with loaded and unloaded secondary windings > > Automatic assessment of results regarding class accuracy in compliance with pre-defined IEC and IEEE standards > > VT/CVT winding resistance measurement > > Determination of magnetization characteristics > > Leakage reactance measurement > > Class verification of VTs/CVTs with up to 5 secondary windings can be done within one measurement cycle > > Burden measurements 4 Reporting All data can be saved in Excel TM and XML format or can be printed as a test report. Your benefits > > Very high accuracy allows field calibration of VTs/CVTs up to the 0.1 accuracy class > > Excellent portability through compact size and low total weight (15 kg / 33 lbs) > > Automated measurements > > Automatic result assessment as per IEEE and IEC standards directly after the test > > Short testing time compared to conventional methods (< 15 min) www.omicronenergy.com/votano100 3

Accuracy and mobility for on-site VT/CVT testing Characteristics for the ideal on-site VT/CVT testing device > > Safety: The dangerous part of the test taking place under high voltages should be kept as short as possible. > > Accuracy: Accuracy level should allow a calibration of metering VTs/CVTs with up to class 0.1. > > Mobility: It should be compact and lightweight enough to be carried by one person. > > Handling: It should offer fast and automated tests and assessment to the respective IEC and IEEE standards. The setup and testing effort should be kept at a minimum in order to reduce time and costs. All relevant parameters should be measured in one test cycle and without the need for any further equipment (such as a burden box) and for rewiring. Primary nominal-voltage injection Primary high-voltage injection Safety > > Very high voltages of up to 1.9 times nominal voltage > > Typically voltage levels of up to 10 kv are used Accuracy > > Very high accuracy > > Many testing components resulting in a lot of calibration work and wiring > > Not sufficient for calibration > > Sensitive to coupling from nearby live cables (typical measurement at mains frequency) Mobility > > Approximately half a ton of equipment (controlled voltage transformer, high-voltage transformer, heavy cables, booster, burden box, etc.) > > More than 30 kg / 66 lbs (not including additional equipment, e.g. external burden box) Handling > > A manual assessment of the results as per applicable standards is possible > > Complex test setup: setup and testing requires several people > > Class compliance of the voltage transformers with higher rating can only be estimated > > For the single ratio test only a simplified test set-up and process is necessary Electrical model V P V S V P V S V 4

Primary voltage injection Model-based VT/CVT testing > > Typically voltage levels of up to 100 V are used > > Not suitable for calibration > > Only sufficient for an estimation of the ratio > > Measuring voltages of up to 4 kv are used > > Local isolation between high voltage and measuring equipment > > Sufficient for measurement and calibration of class 0.1 metering VTs/CVTs > > Measuring signals away from the mains frequency guarantees excellent noise suppression > > Typically less than 10 kg / 22 lbs > > Ideal for handling on site > > 15 kg / 33 lbs > > Ideal for handling on site > > Class compliance of the voltage transformer can only be roughly estimated > > Comparatively simple and easy test setup > > Software-guided and automated test procedure (< 15 min) > > Automated assessment (as per applicable standards) and reporting function > > Enhanced simulation function eliminates the necessity to double-check measurements V P V S V P V S V 5

VOTANO 100 s features Ratio unloaded Ph. angle unloaded Ratio loaded Ph. angle loaded Power Voltage ratio error in % at % of rated voltage VA cos Phi Burden in % 2% 5% 80% 100% 120% 15 100 0.088% 0.123% 0.177% 0.177% 0.176% 0.8 3.75 25 0.033% 0.362% 0.415% 0.417% 0.415% 15 100 4.825 min. 4.287 min. 3.180 min. 3.186 min. 3.245 min. 0.8 3.75 25 2.802 min. 2.263 min. 1.155 min. 1.161 min. 1.220 min. 15 100-0.57% -0.54% -0.482% -0.481% -0.483% 0.8 3.75 25-0.33% -0.30% -0.246% -0.245% -0.246% 15 100 2.320 min. 1.783 min. 0.678 min. 0.683 min. 0.737 min. 0.8 3.75 25 0.302 min. -0.235 min. -1.340 min. -1.335 min. -1.300 min. Automated assessment of measurement results in compliance with the standards > > Limit values for automated assessment are set in compliance with the applicable standards (IEC or IEEE) > > Automatic assessment is completed within seconds after the measurement > > Complete transformer assessment considering; > > different burdens of secondary windings under test > > different primary voltage values > > each secondary winding under load and no-load conditions (while the others are either under load or without load) Remote control > > With the PC software you can easily control the whole measuring procedure > > Allows the integration of VOTANO 100 into the automated testing procedures of a production line > > You can export data into Excel TM or XML format Simulation and re-assessment Using the measured data of previous tests you can save time and money by; > > reloading existing measurement data into VOTANO 100 at any time for simulation > > doing later simulations and re-assessment of transformers when the following parameters have changed: > > Burdens (individually for each winding) > > Nominal voltage factor > > Accuracy class of transformer > > Primary voltage > > avoiding further on-site measurements to verify whether a change in the burden will influence the transformers accuracy 6

: : Data processing and test reports VOTANO Test Results > > You can save the test results directly on the Compact Flash Card > > With your PC you can easily generate reports using the Report Function Company name OMICRON electronics GmbH Company address Oberes Ried 1, 6833 Klaus, Austria Order number Nameplate data General test information Model VT Type VOTANO100 Rated primary voltage [V] 6000,00 Serial number AU001V Applied standard IEC 60044-2 Date/time 2013-07-22, 16:36:16 AM Rated frequency [Hz] 50,00 Valid file Fv 1,2 1a-1n Rated sec. voltage [V] 100 Location M-Class 0,5 Company Nom. Burden [VA]/Cos phi 15/0.8 Country 2a-2n Rated sec. voltage [V] 100 Station M-Class 0,5 Feeder Voltage deviation [%] Ratio error / other windings not loaded Upr [%] > > The content and layout of reports can be customized in Excel TM Nom. Burden [VA]/Cos phi 30/0.8 Phase [ ] 3a-3n Rated sec. voltage [V] IEC-ID M-Class P-Class Nom. Burden [VA]/Cos phi Object 4a-4n Rated sec. voltage [V] Manufacturer M-Class P-Class Type Nom. Burden [VA]/Cos phi Serial number da-dn Rated sec. voltage [V] 100 M-Class n/a P-Class 3P Nom. Burden [VA]/Cos phi 60/0.8 Winding under test Winding resistance test Ratio test@100% of Vpr and VA Polarity Phase displacement [min] Phase displacement / other windings not loaded : : : : : : : : Upr [%] Safe testing > > Enhanced security through software-guided measuring procedure via GUI or PC software > > Wiring diagrams for each single measurement > > VBO2 automatically switches through all tests. HV and LV wiring only needs to be done once. > > Acoustic warnings sound before and during (optional) measurements with higher voltages > > Automatic plausibility and wiring check before critical measurements > > VBO2 offers additional safety circuitry through surge arrestors for the measuring channels > > Integrated system check to ensure VBO2 is correctly grounded > > If reconnections are necessary during the measurement the system can be locked for security reasons > > Safety box SAB1 and VBO2 indicate operating state and safe state of the test setup via red and green LEDs. > > Emergency stop button for additional safety interruptions VOTANO 100 VBO2 SAB1 High-voltage area Safe area 7

Specifications and software packages Technical specifications of VOTANO 100 Inductive voltage transformers Ratio measurement Voltage ratio Voltage level* Typical accuracy 1... 350 0.6 kv... 35 kv 0.05 % > 350... 2 450 > 35 kv... 245 kv 0.07 % Phase displacement measurement Voltage ratio Voltage level* Typical accuracy 1... 350 0.6 kv... 35 kv 1 min > 350... 2 450 > 35 kv... 245 kv 2 min Winding resistance measurement Resolution Guaranteed accuracy Typical accuracy 1 mω 0.1 % + 1 mω 0.05 % Power supply Input voltage 100 V AC... 240 V AC Permissible input voltage 85 V AC... 264 V AC Frequency 50 Hz / 60 Hz Permissible frequency 45 Hz... 65 Hz Input power 500 VA Connection Standard AC socket as per IEC 60320 Output Output voltage 0... 120 V DC, 0... 40 V AC Output current 0... 5 A eff (15 A peak ) Output power 0... 400 VA eff (1 500 VA peak ) Physical dimensions Capacitive coupled voltage transformers Ratio measurement Voltage ratio Voltage level* Typical accuracy 300... 8 000 > 30 kv... 800 kv 0.07 % Phase displacement measurement Voltage ratio Voltage level* Typical accuracy 300... 8 000 > 30 kv... 800 kv 2 min Size (W H D) Weight Environmental conditions 360 285 145 mm 9.2 7.2 3.7 in < 8 kg / 17.1 lbs (without accessories) Operating temperature -10 C... +50 C / +14 F... +122 F Storage temperature -25 C... +70 C / -13 F... +158 F Relative humidity 5 %... 95 %, non-condensing Winding resistance measurement Resolution Guaranteed accuracy Typical accuracy 1 mω 0.1 % + 1 mω 0.05 % PC Requirements Operating system Microsoft Office versions Windows 10 TM 32 bit and 64 bit Windows 8.1 TM 64 bit Windows 8 TM 64 bit Windows 7 TM 32 bit and 64 bit Windows Vista TM with SP 1 32 bit 365, 2016, 2013, 2010, 2007 SP2, 2003 SP3 Technical specifications of VBO2 voltage booster Physical dimensions Size (W H D) Weight 358 230 114 mm / 14.1 9.1 4.4 in 7.5 kg / 16.5 lbs (without accessories) Environmental conditions Please see VOTANO 100 parameters. * network voltage level (line-to-line voltage) 8

Features of VOTANO 100 software packages VT VT CVT CVT VT/CVT Standard Advanced Standard Advanced Universal PC software remote interface Simple VT/CVT ratio check VT/CVT polarity check Measurements for inductive VTs with up to 5 secondary windings Measurements for capacitive VTs with up to 5 secondary windings Measurements for VTs as part of combined VT/CT units with up to 5 secondary windings VT/CVT ratio and phase measurements under load and no-load condition VT/CVT ratio error and phase displacement measurement in accordance with the standard > > Primary voltage levels between 5 % and 190 % of the nominal primary voltage > > Nominal burden and burden values below (0 VA, 25 % and 100 % burden) > > Other windings under load and no-load condition > > Customized burden and Total Simultaneous Burden (TSB) Automatic assessment as per applicable standards up to accuracy class 0.1 > > IEC 60044-2 for inductive VTs > > IEC 60044-5 for capacitive VTs > > IEC 61869-3 for inductive VTs > > IEC 61869-5 for capacitive VTs > > IEEE C57.13 for instrument transformers > > ANSI C93.1 for capacitive VTs Automatic test and assessment of ground fault winding (open delta) Equivalent circuit parameter determination > > VT/CVT excitation curve measurements > > Winding resistances > > Leakage reactances Subsequent simulation and re-assessment of the VTs/CVTS after modification of > > Burden, nominal/rated voltage factor, accuracy class of VT/CVT, primary voltage Reloading of saved measuring data into VOTANO 100 for simulation at any time Short-circuit impedance measurements Burden measurement included not included 9

Ordering information VOTANO 100 Packages VOTANO 100 Package incl. all cables and accessories Description VOTANO 100 device including simple VT/CVT ratio check Ordering No. VE000804 Available software packages VOTANO 100 VT Standard Software Package VOTANO 100 CVT Standard Software Package VOTANO 100 VT Advanced Software Package VOTANO 100 CVT Advanced Software Package VOTANO 100 VT/CVT Universal Software Package Software package for common load and no-load ratio and phase measurements on VTs Software package for common load and no-load ratio and phase measurements on CVTs Software package for complete measurements and simulation of VTs up to accuracy class 0.1 with automatic IEC/IEEE class assessment Software package for complete measurements and simulation of CVTs up to accuracy class 0.1 with automatic IEC/IEEE class assessment Software package for complete measurements and simulation of VTs and CVTs up to accuracy class 0.1 with automatic IEC/IEEE class assessment VESM0803 VESM0804 VESM0805 VESM0806 VESM0807 VOTANO 100 Package 10

Software Upgrade Options VOTANO 100 VT Standard to Advanced Upgrade Option VOTANO 100 CVT Standard to Advanced Upgrade Option Description Upgrade option for complete measurements and simulation of VTs up to accuracy class 0.1 with automatic IEC/IEEE class assessment Upgrade option for complete measurements and simulation of CVTs up to accuracy class 0.1 with automatic IEC/IEEE class assessment Ordering No. VESM0808 VESM0809 Accessories and Cables Calibration VT Description High-precision calibration IVT (0.05% accuracy) for calibration of VOTANO 100 and VBO2 (calibration certificate ISO / IEC 17025 included) Ordering No. VEHZ0801 VOTANO 100 Cable Package Additionally available cables / adapters for the connection of several secondary windings and burdens VEHK0804 Services Recalibration of Calibration VT Calibration of new VOTANO 100 devices Description Recommended recalibration of calibration VT every 1-2 years (return shipment included) Optional calibration of new VOTANO 100 devices according to IEC17025. Certifies accuracy for VT accuracy class determination and verifies accuracy of lowand high-voltage in- and outputs Ordering No. VEDK9057 VEDK0017 Recalibration of VOTANO 100 devices in service Recommended annual recalibration of VOTANO 100 devices in service according to IEC17025. Certifies accuracy for VT accuracy class determination and verifies accuracy of low- and high-voltage in- and outputs (return shipment included) VEDK9058 Find detailed ordering information and package descriptions on www.omicronenergy.com 11

A strong and safe connection Welcome to the team At OMICRON you can always depend on an experienced team that actively supports you and an infrastructure that you can rely on. We always listen attentively in order to understand your needs so that we can offer you the best possible solutions. We strive for lasting partnerships and ensure that you can continue to rely on your product long after you've purchased it. In order to do this, we focus on quality, the transfer of knowledge and unique customer support. Tony, Wenyu and Thomas are able to tell you about the services we have available for you and why it pays to be part of the team. Tony Porrelli Application Specialist Solutions you can rely on...... developed with experience, passion and an innovative approach that we use to continually set groundbreaking standards in our industry sector. We invest more than 15 % of the total turnover in research and development so that we can even guarantee the reliable use of the latest technology and methods in the future. Our comprehensive product care concept also guarantees that your investment in our solutions like free software updates pays off in the long term. 12

Wenyu Guo OMICRON Academy We share our knowledge... by maintaining a constant dialogue with users and experts. Some examples of this are our customer events and conferences that take place all over the world and our collaboration with numerous standardization committees. We also make our knowledge available to you in the customer section of our website in the form of application reports, specialized articles and articles in the discussion forum. With the OMICRON Academy, we also provide a wide spectrum of training possibilities and assist you with Start-up training and free webinars. Thomas Bischof Technical Support When rapid assistance is required... our excellent level of support is always appreciated. You can reach the highlyqualified and committed technicians in our customer support department 24 hours a day, seven days a week and it's completely free. We deal with repair services and service features in a fair and non-bureaucratic manner. We can help minimize your downtime by lending you equipment from a readily available plant at one of our service centers in your area. A comprehensive offer of services for consulting, testing and diagnostics completes our range of services. 13

OMICRON Who we are Reliable. Passionate. Different. For over 30 years we have been developing innovative, top-quality testing and monitoring solutions for electrical power systems. Customers in more than 150 countries rely on OMICRON s testing technology. In addition, we offer a wide array of services in the fields of consulting, testing and training. We aim to inspire our customers with exceptional products, an interactive exchange of knowledge and extraordinary customer support. Our curiosity and passion give us the courage to approach things from different angles. Together with our partners and customers, we are striving towards a safe and reliable energy supply. Create an environment with no artificial limits where a team of excellent members can reach an excellent performance and enjoy working together at the same time. (Rainer Aberer, company founder) Our values We acknowledge our social, ecological and corporate responsibility, and are committed to ensuring sustainable de vel op ment and business practices. The majority of development and production work takes place at our premises in Austria. Highly specialized suppliers from the region and first-class components guarantee the reliability and durability of every OMICRON device. Over 750 employees from 45 different countries shape our extremely diverse corporate culture today. Flat hierarchies and a high degree of individual responsibility create a motivational work environment in which our employees can realize their full potential. Actively practiced corporate values such as respect and trust lead to our unique company spirit. Founding of OMICRON in Austria First major OMICRON protection testing conference Entering the fields of protection and measurement technology OMICRON has over 100 employees Entering the field of primary equipment testing 1984 1990 1993 2000 2001 14

Customers in over 100 countries worldwide Over 700 employees across 22 offices worldwide Entering the field of online monitoring 2003 2009 2015 15

For more information, additional literature, and detailed contact information of our worldwide offices please visit our website. www.omicronenergy.com OMICRON L2771, November 2017 Subject to change without notice.