Laser Alignment. Step-By-Step for the Epilog Mini / Helix Manufactured From 2004 to 2009 (8000 Model)

Similar documents
EPILOG LASER Table Mountain Parkway Golden, Colorado Phone FAX

Tools Needed 3/32 Allen Wrench which is located in your accessory kit Masking Tape

Fusion M2/32/40 focus, home and table calibration

USING LASER POWER METER

machines 608 Trestle Point Sanford, FL Phone Fax

Installation and Operating Instructions Desk top Laser

Section 1 Low power. Laser exchange. Procedure before replacing the laser cartridge

IxD Lab, IT University in Copenhagen. March Lasercutting 101

Section 9: Standard & Optional Machine Features

3 D Printer Enclosure Assembly Instructions

Service Manual for XLE/XLT Series Laser Engravers

Rotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions

Laser Alignment Guide

INSTRUCTION SHEET U19

Queen Wingback Bed King Wingback Bed

Tinker Tuesday Project - Drinking Glasses

LASER CUTTER. Armstrong Hall of Engineering Artisan and Fabrication Laboratories (AFL) Safety and Operational Procedure. PPE Required: Safety Glasses

Step 1 Remove Focus Knob

35 mw HeNe Laser Ballast Resistor Insulation Upgrade Instructions

INSTALLATION INSTRUCTIONS

ABM International, Inc. Navigator Assembly Manual

Droplit v2 Frame Assembly

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

Tinker Tuesday Project - Stainless Steel Tumblers

Science Olympiad Optics LSS Tips and Tricks Alan Chalker September 2011

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

Section 7: Using the Epilog Print Driver

Series 4 HV Single Monitor Lift Assembly Instructions

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

GO TO Table of Contents

One Piece Products. Series III El Camino ( ) One Piece Door Glass Conversion Manual.

An Introduction to Lasercut 5.3 Preparing the Artwork

Epilog Laser Cutter Moira Gannon Denson, MA Allison Steele, MAT

AG Optical Systems. Newtonian Astrograph Manual Version AG Optical Systems

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

Media Low Sensor Maintenance Kit

XI. Rotary Attachment Setups

Replacing the build plate clamps

Prof. Steven S. Saliterman Introductory Medical Device Prototyping

1/24/2018. Prof. Steven S. Saliterman. Right: Image courtesy of Copper Safety. Prof. Steven S. Saliterman

HPC LASER LTD LS ^0«0 MANUAL HPC LASER LTD - NEVER LEAVE YOUR MACHINE UNATTENDED WHEN WORKING

Frameless Bypass Slider

Easy Assembly Instructions & Rules

INSTALL/REMOVAL INSTRUCTIONS: WINDOW LIFT MOTOR

Slitter/E-Prom Upgrade for Duplo CC-228

Frameless Bypass Slider

Replacing the build plate clamps

Installing flat panels on the MPL15 wall mount

CONTINUED. TABLE TOPS: 1. Sort one 2x6x8 piece from your lumber. 2. Measure and mark two 48 pieces from each, then cut.

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

Model 5400H / 7000H Illustrated Installation Instructions

Elementary Storage Cabinets

SIPS instructions for installation and use

K-Emily Twin Nkl Canopy Bed K-Emily Twin Pink Canopy Bed K-Emily Purple Twin Canopy Bed

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

Removing the Z-Axis lead screw

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Temperature Controller Replacement

x2 1/4 (6mm) Floor Anchor

16 STEEL CABINET HEAVY DUTY

Interactive Monitor Arm

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

Allow 60 from door face

Lead Screw Cover Installation

POWER PET. Low-E Automatic Patio Pet Door Installation and Operating Instructions

P202/219 Laboratory IUPUI Physics Department THIN LENSES

QUICK-START FOR UNIVERSAL VLS 4.6 LASER!

Assembly Guide for Printrbot - Simple Maker s Edition 1405

Stuff-Your-Stuff Platform Bed (Twin and Full)

Building the First Row Table Assembly

MEC Auto-Mate Assembly Manual. For MEC 9000G/GN and 8567 Grabber Series

BARN DOOR HARDWARE KIT

Juki Quilting Frame. Assembly and Use Instruction Manual. Max Overall Dimensions: Length Crib: King: Tall: Wide: 42

Whalen Furniture Mfg. Factory No. 5 Page # 1

Float Pod Installation Manual

Installation Instructions

SwingSafe Swing-Away Mailbox Support Diagram

Assembly Instructions: AM-10 Hand & Foot Cycle Early Intervention Part #: 50-HFC-0105

7. Michelson Interferometer

INSTALLATION INSTRUCTIONS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Assembly Instructions

AR-15 Lower Receiver Assembly Instructions

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

Fresenius Medical Care North America Service Bulletin

Experimental Question 2: An Optical Black Box


TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

College for Creative Studies Alfred Taubman Center-Model Shop Laser Usage Guide

x2 1/4 (6mm) Floor Anchor

Manual. for. Laser Belt Liner

User Manual. Laser DirectPrint MAC AI Plug-in. Introduction to the. Copyright 2009 GCC,Inc. All Right Reserved.


Bodyspray INSTALLATION INSTRUCTIONS

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

RDworks and Basic Rabbit Laser Operation Tutorial

Guide for CNC Carving

A-dec 574L and 575L Dental Lights on a Cabinet or Wall INSTALLATION GUIDE

Transcription:

Laser Alignment Step-By-Step for the Epilog Mini / Helix Manufactured From 2004 to 2009 (8000 Model) 1

Laser alignment can be done if any of the following applies to you. You are experiencing a general Loss of Power You are experiencing Fading in one of the corners of the table. You are losing power in certain positions on the table. You have replaced a Laser Tube. You have replaced a Mirror or Optic. 2

Things You Will Need Black Alignment Target Masking Tape Phillips Head Screwdriver - #2 Allen Wrench - 3/32 Safety Glasses 3

Remove Panels Remove Left Side Panel and Rear Panel so that you can access the mirrors and pointer. Always wear safety glasses when the panels have been removed and always stand away from the exposed sides when firing the laser. Tip: Any Safety Glasses will work. You don t need special laser glasses for the CO2 Laser. 4

Table Positions To make the process easier to understand the corners of the engraving area will be labeled as follows: Pos 1 (Rear) Pos 3 (Table) Pos 2 (Front) Pos 4 5

Mirror Numbers and Locations There are 3 mirrors used to adjust the laser beam. These mirrors are shown in the picture below. Mirror 2 Mirror 1 Mirror 3 Tip: The Mirror Numbers match the Table Positions. When adjusting alignment on Position 1 you should only use Mirror 1 and so on. 6

Before you start! If you are performing this alignment because you have been sent a new Laser Tube. Please be sure that the protective tape covering the end of the new Tube has been removed before attempting to fire the laser. 7

Pre-Alignment Procedure Place Target &Tape Power the engraver on. Create & Send Job Run & Halt Job Turn On Red Pointer Align Pointer to Burn Mark Complete Pre- Alignment 8

Place Target & Tape Place Alignment Target in Lens Carriage. Place Masking Tape on Target. 9

Create & Send Job Job Size = Bed Size (18x12, 24x12 or 24x18) Place a ¼ Vector Box near the bottom right corner. Send job at 10% Speed, 10% Power, 2500 Freq. 10

Run & Halt Job Press GO on the engraver. Watch for the tape to start to burn. Open the Door of the machine. (Stops laser fire.) Press Stop. (To pause the engraver.) Tip: This can happen VERY fast. Be ready! 11

Run & Halt Job Tip: If the engraver returns to the Home position, you will need to repeat this process. 12

The lens carriage should now be in Position 4 and there will be a burn mark on the tape. Table I-Beam L 13

Turn On Red Pointer Press the Pointer button to turn on the Red Dot Pointer 14

Align the pointer to the burn mark The Red Dot Pointer is in the rear of the machine, mounted to the right end of the laser tube. Pointer Adjustment Screws Tip: Small adjustments can make large changes! Always make Very Small Adjustments. Next 15

Align the pointer Which Adjustment Screws to Use Clockwise Next 16

Align the pointer Which Adjustment Screws to Use Clockwise Next 17

Align the pointer Which Adjustment Screws to Use Counterclockwise Next 18

Complete Pre-Alignment Once the Red Pointer is aligned with the Burn Mark in Position 4 than the Pre-Alignment is complete and your Red Pointer will represent the path of the cutting beam in the rest of the engraver. 19

Disable Axis Align Laser in Position 1 Align Laser in Position 2 Run Test Check Alignment Align Laser in Position 3 Complete Alignment 20

Pro Tip! An accurate alignment is all about repetition. Repeat the alignment steps until you can get between positions 1, 2 and 3 with very minimal movement of the red dot pointer. The more often you repeat, the more accurate it becomes! 21

Disable Axis On the Engraver press X/Y Off. Press Go to confirm. You may now move the lens carriage freely by hand. 22

Align Position 1 Move the Lens Carriage to Position 1 L I-Beam Table 23

Use Mirror 1 to move the pointer to the center of the alignment target 24

Align Position 2 Move the Lens Carriage to Position 2 Table L I-Beam 25

Use Mirror 2 to move the pointer to the center of the alignment target 26

Repeat Repeat Slides 20 23 until you can move between positions 1 and 2 without the Red Pointer moving out of then center of the Alignment Target. 27

Align Position 3 Move the Lens Carriage to Position 3 I-Beam L Table 28

Use Mirror 3 to move the pointer to the center of the alignment target 29

Repeat Repeat Slides 20, 22, 25 and 26 until you can move between positions 1 and 3 without the Red Pointer moving out of then center of the Alignment Target. 30

Check Alignment Move the lens carriage to each of the positions on the table to insure that the red pointer is in the center area of the Alignment Target. Pos 1 (Rear) Pos 3 (Table) Pos 2 Pos 4 (Front) 31

Run Test Create a file the size of your bed. (18x12, 24x12 or 24x18) Place an object in each corner of the file. Send the File to the machine with your standard speed and power settings for that material. Make sure that engraving is even in all corners of the engraver. 32

Complete Alignment Be sure to put the panels back on the engraver before running the machine any further. If you have any questions please contact Epilog Tech Support at (303) 215-9171 33