Heading back to Mars with a thermal control system developed using NX

Similar documents
JPL. Heading back to Mars with thermal control system developed using NX. Aerospace. Product NX

Jet Propulsion Laboratory

NX CAM 9.0.2: Gouge Reports for Tapping and Thread Milling. Gouges are no longer reported for Tapping, Hole and Boss Thread Milling.

NX CAM 9.0.3: Band Width for Drilling Sequence Optimization. Specifying hole alignment tolerance for zig and zig zag patterns. Siemens PLM Software

NX CAM : Deep Hole Drilling. Using pilot holes and a new operation subtype with additional cycle parameters to drill deep holes.

Gdańsk University of Technology

Wiegel Tool Works. Die maker seeks competitive advantage through business transformation

Industrial machinery and heavy equipment. Ross Robotics. Solid Edge supports the creative process of exploration and experimentation

Penn State Behrend. Siemens PLM Software solutions support ergonomics research and education at Penn State Behrend

Tokamak Energy. Tokamak Energy chooses Siemens PLM Software solutions for tackling one of mankind s biggest engineering challenges

The Robosynthesis Modular Platform incorporates clever components that assemble to form a range of reconfigurable robots

Using Solid Edge with synchronous technology helps luxury watchmaker achieve superior precision

Uncover peak performance in HSM

Taco Comfort Solutions

NASA Mars Exploration Program Update to the Planetary Science Subcommittee

NASA s X2000 Program - an Institutional Approach to Enabling Smaller Spacecraft

Solid Edge structural frames and weldments

Aeronautics Institute of Technology

Seven Minutes of Terror, Eight Years of Ingenuity

MAVEN continues Mars exploration begun 50 years ago by Mariner 4 5 November 2014, by Bob Granath

Lisa Airplanes. A robust and proven FEA preand postprocessing solution, accessible to businesses of all sizes

NASA s Space Launch System: Powering the Journey to Mars. FISO Telecon Aug 3, 2016

Directions: Read the following passage and answer the questions that follow. Seven Minutes of Terror, Eight Years of Ingenuity

Mars 2020 Rover Dust Analysis for Drill. Team Hindsight

Robotics for Space Exploration Today and Tomorrow. Chris Scolese NASA Associate Administrator March 17, 2010

Engineering Adventures

chairs IEEE EMC symposium technical sessions. He is often tutorial workshops and technical demonstrations at IEEE EMC international symposiums.

The MARS Helicopter and Lessons for SATCOM Testing

Physics-Based Modeling In Design & Development for U.S. Defense Virtual Prototyping & Product Development. Jennifer Batson Ab Hashemi

Reaching New Heights and Revealing the Unknown: A Conversation with Charles F. Bolden, Jr. NASA Administrator

The Lunar Exploration Campaign

The COVE Payload A Reconfigurable FPGA-Based Processor for CubeSats

BETTER BY DESIGN

Advances in Planetary Seismology Using Infrasound and Airglow Signatures on Venus

COSMOS. Why Use Analysis Up-Front in the Design Cycle? COSMOSWorks. SolidWorks Corporation. Introduction. Explore Multiple Design Options

Uranus Exploration Challenges

Leverage 3D Master. Improve Cost and Quality throughout the Product Development Process

A RENEWED SPIRIT OF DISCOVERY

ARMADILLO: Subsystem Booklet

Gdańsk University of Technology

Curiosity. on Mars. Curiosity on Mars A Reading A Z Level W Leveled Book Word Count: 1,074 LEVELED BOOK W.

Low-Cost Innovation in the U.S. Space Program: A Brief History

Implementing BIM for infrastructure: a guide to the essential steps

In the summer of 2002, Sub-Orbital Technologies developed a low-altitude

Graduate Profile, Aeronautical Engineering, University of Limerick, Ireland DOMHNAILL HERNON

Generative Design: Your AI Partner in Product Development. Date: Thursday, November 29, 2018

A Road Map To Mars BY ROBERT ASH. Courtesy of NASA/JPL/Caltech

GSFC CONFIGURATION MANAGEMENT MANUAL

Jet Propulsion Laboratory, California Institute of Technology

Dan Dvorak and Lorraine Fesq Jet Propulsion Laboratory, California Institute of Technology. Jonathan Wilmot NASA Goddard Space Flight Center

William B. Green, Danika Jensen, and Amy Culver California Institute of Technology Jet Propulsion Laboratory Pasadena, CA 91109

Moving to Model-Based Design

A TIMKEN COMPANY SUBSIDIARY

Antenna Mechanical & Structural Engineering (333H) BWG-2 Feed Platform. Jet Propulsion Laboratory California Institute of Technology.

Best practices in product development: Design Studies & Trade-Off Analyses

Alabama College and Career Readiness Standards (Science 2015)

Daring Mighty Things. AFCEA Los Angeles. Larry James (Lt. Gen. USAF, Ret.), Deputy Director. a presentation to. January 14, 2015

The Application of SE Methodologies to the design and development of a Space Telescope

Eighth Grade Summer Reading Assignment

Credits. National Aeronautics and Space Administration. United Space Alliance, LLC. John Frassanito and Associates Strategic Visualization

HEOMD Update NRC Aeronautics and Space Engineering Board Oct. 16, 2014

The Collaborative Digital Process Methodology achieved the half lead-time of new car development

Orbital ATK JT File Use Case Matt Johnston. 5-Oct-16

Autodesk for the Transportation Industry. Experience It Before It s Real

Cyber-Physical Systems

Science Plenary II: Science Missions Enabled by Nuclear Power and Propulsion. Chair / Organizer: Steven D. Howe Center for Space Nuclear Research

DIGITAL TWINS: IDENTICAL, BUT DIFFERENT

Space Settlement Laboratory

The Global Exploration Roadmap

Planetary CubeSats, nanosatellites and sub-spacecraft: are we all talking about the same thing?

The Global Exploration Roadmap

National Aeronautics and Space Administration

S imulation S uper P owers

The Global Exploration Roadmap International Space Exploration Coordination Group (ISECG)

Voyage to Mars Space Simulation

ESA Human Spaceflight Capability Development and Future Perspectives International Lunar Conference September Toronto, Canada

NASA and private businesses must cooperate if Mars mission is to succeed

2014 Mission Design Mars Sample Return. Mission. Steven C. Martinez

Detailed Pattern Computations of the UHF Antennas on the Spacecraft of the ExoMars Mission

The Aerospace Corporation s Concept Design Center

Benefiting government, industry and the public through innovative science and technology

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks.

Autodesk Inventor LT. Easy as 1, 2, 3D.

How to Plan for High-Profile Missions. John Klineberg, Moderator; Rick Howard, NASA (ret.); Ralph McNutt, APL; Charles Elachi, JPL; Bill Gail, GWC

Ultra Reliability at NASA

STARBASE Minnesota Duluth Grade 5 Program Description & Standards Alignment

Big Data Visualization for Planetary Science

BIM FOR INFRASTRUCTURE THE IMPACT OF TODAY S TECHNOLOGY ON BIM

Teaching students science and engineering with high altitude balloons and ChipKits

NASA Mission Directorates

Pterodactyl: Integrated Control Design for Precision Targeting of Deployable Entry Vehicles

Smarter oil and gas exploration with IBM

Overview of Recent Lunar Robotic Science and Exploration Studies at JPL

U.S. Space Exploration in the Next 20 NASA Space Sciences Policy

LEVERAGING SIMULATION FOR COMPETITIVE ADVANTAGE

Human Spaceflight: The Ultimate Team Activity

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia.

Technology Capabilities and Gaps Roadmap

Challenger Center Teacher Resources for Engaging Students in Science, Technology, Engineering, and Math

SimDesigner How to Design a Silicone Push Button

Transcription:

Aerospace JPL Heading back to Mars with a thermal control system developed using NX Product NX Business challenges Tighter schedules Large daily temperature swings during the life of the mission Bigger rover with radioisotope power system Keys to success Single software platform (NX) from design through manufacturing Digital assembly model of entire MSL Multi-discipline simulation with NX CAE software Results Faster design-analysisredesign iterations Less manual work and less rework; increased efficiency More confidence in the hardware modeling, the design implementation, and mission simulations A more focused test program Seamless, multi-discipline integration between design, analysis and manufacturing enabled JPL to meet the thermal challenges posed by the Mars Science Laboratory A bigger, better rover The Jet Propulsion Laboratory (JPL) is the lead United States center for robotic exploration of the solar system. Its history of space exploration and discovery spans more than 50 years, from the early Explorer 1 spacecraft to the latest Mars mission, which launched in November 2011 and is due to set down on Mars in August 2012. Called the Mars Science Laboratory (MSL), this latest mission will put a mobile laboratory, the Curiosity rover, onto the Mars surface inside Gale Crater. Designed to determine whether the area ever had conditions favorable for life, Curiosity is equipped with a robotic arm that can drill into rocks, scoop up soil and deliver samples to internal analytical instruments. New thermal design and analysis challenges Curiosity isn t the first rover JPL has sent to Mars. It sent the first, Sojourner, in 1997. Two others, Spirit and Opportunity, explore regions on opposite sides of that planet. They have been doing so since January 2004. Originally designed to oper- Image courtesy of NASA/JPL-Caltech. ate for three months, they have been successful beyond expectations, with Opportunity still active today. While the experience with those rovers undoubtedly played a role in the development of the MSL s thermal control system, there were major differences in this project that posed many new challenges for JPL. Curiosity s power generator, the Multi- Mission Radioisotope Thermoelectric Generator (MMRTG), is constantly generating a substantial amount of heat, so JPL had to add more capability to the heat rejection system to accommodate it during the cruise phase. Also, this rover s payload www.siemens.com/nx

Images courtesy of NASA/JPL-Caltech. In addition to tighter designanalysis integration, use of NX enabled integration between different types of analysis, such as thermal and mechanical analysis. is larger with much higher heat dissipations. This larger heat load on the rover influenced the need to add a rover heat rejection system. But an even bigger difference is that Curiosity s heat rejection system has to operate on the surface of Mars. While the cruise heat rejection system operates in a single mode to remove waste heat, the rover heat rejection system must perform both heating and cooling on the Martian surface. The design of the MSL s thermal control system involved more than just the heat rejection system. It included all the typical thermal control hardware (heaters, thermostats, thermal control coatings and thermal blankets) that maintain the payload and the spacecraft subsystems within their allowable temperature requirements, for all operating modes and in the wide range of thermal conditions the MSL will experience throughout the mission lifetime....nx enabled integration between different types of analysis, such as thermal and mechanical analysis.

Image courtesy of NASA/JPL-Caltech. The highest temperature that portions of the MSL flight system will experience is estimated to be 1,447 degrees Celsius (C) during entry into the Mars atmosphere. The coldest environment it will experience is the coldness of deep space (2 Kelvin/-271 degrees C) during the cruise phase to Mars. The thermal environment on the Mars surface will range from -135 degrees C to +50 degrees C. Wanted: seamless integration Nearly a decade ago, JPL started to put together a technology infrastructure aimed at meeting the more aggressive schedules and leaner budgets it had started to experience. A key element was establishing seamless software interfaces from conceptual design through manufacturing. This would allow JPL to minimize transcription errors, manual processes and interpolations between meshes. Minimizing errors and rework was critical to maintaining design and fabrication schedules. To address such issues, JPL implemented NX software from Siemens PLM Software as an end-to-end mechanical design platform. With NX, JPL got a fully integrated computer-aided design (CAD)/computeraided engineering (CAE)/computer-aided manufacturing (CAM) system. This is the system JPL used to develop the mechanical portions of the MSL, including the thermal control system. Virtual MSL JPL s mechanical designers modeled the entire MSL using NX. There are digital assembly models of the rover, the cruise stage and the descent stage. Analysts used the NX geometry, simplifying it as necessary, as the basis for their finite element meshes. Having design geometry and the analysis meshes in a single environment improved collaboration between the design and analysis teams and also reduced the time and effort spent creating analysis models. The integrated NX environment also allowed the engineering teams to rapidly re-evaluate designs as the mechanical hardware evolved.

Saving time and keeping to the schedule was critical, although an equally important benefit of using NX was the ability to evaluate the thermal control system s performance under conditions that JPL could not simulate with physical Images courtesy of NASA/JPL-Caltech. JPL engineers started with small simulations (as this was the pilot program) to validate modeling assumptions, and eventually gained confidence that their models correctly replicated the physics involved. Then they used the NX CAE solutions for thermal analysis to simulate a variety of physical effects, such as fluid flow in the Mars rover, heater control of the propulsion system, and solar loading of the cruise stage. Analysis results were used to update the design geometry. The ease and efficiency of going from the design to thermal analysis and then back to update the design geometry accelerated the development of the MSL s thermal control system considerably. Saving time and keeping to the schedule was critical, although an equally important benefit of using NX was the ability to evaluate the thermal control system s performance under conditions that JPL could not simulate with physical In addition to tighter design-analysis integration, use of NX enabled integration between different types of analysis, such as thermal and mechanical distortion and stress analysis. Prior to adopting NX, engineers would have run a thermal solution and then manually mapped temperatures to the structural mesh. Use of NX eliminated this manual process. Use of NX also enabled easier access to multiple types of analyses. For example, designers also needed to know whether any moving components would interfere with any other components or rover operations. This would have been very difficult...an equally important benefit of using NX was the ability to evaluate the thermal control system s performance under conditions that JPL could not simulate with physical

Solutions/Services NX CAD NX CAE www.siemens.com/nx Teamcenter www.siemens.com/teamcenter Client s primary business The Jet Propulsion Laboratory (JPL) is a federally funded research and development center managed by the California Institute of Technology for the National Aeronautics and Space Administration. www.jpl.nasa.gov Client location California Institute of Technology Pasadena, California United States JPL also uses Teamcenter software from Siemens PLM Software. Teamcenter enables a single source of structured product and process information management throughout the digital lifecycle. Teamcenter enables a single source of structured product and process information management throughout the digital lifecycle. to determine by looking at static drawings or digital models. Using NX Motion made it possible to answer questions such as these without the costs and delays of physical We must now wait until the MSL reaches Mars, sets down the rover, and it gets to work before we see the final results of these efforts. It is known already, however, that this project delivered many of the benefits the agency was hoping for when it went looking for a seamless endto-end solution for mechanical design. The MSL flight system is the most complex Mars mission that JPL has implemented involving new technologies and a new approach for entry, descent, and landing. As such, the development lifecycle is very difficult to compare to previous missions but it is clear that the MSL program had less manual work and more efficient upstream and downstream modeling and simulation interfacing compared to previous programs. And not having to re-enter data into multiple applications ruled out a potential source of error, giving JPL a higher level of confidence in the MSL design than it would have had otherwise. Siemens Industry Software Americas +1 314 264 8499 Europe +44 (0) 1276 413200 Asia-Pacific +852 2230 3308 www.siemens.com/plm 2013 Siemens Product Lifecycle Management Software Inc. Siemens and the Siemens logo are registered trademarks of Siemens AG. D-Cubed, Femap, Geolus, GO PLM, I-deas, Insight, JT, NX, Parasolid, Solid Edge, Teamcenter, Tecnomatix and Velocity Series are trademarks or registered trademarks of Siemens Product Lifecycle Management Software Inc. or its subsidiaries in the United States and in other countries. All other logos, trademarks, registered trademarks or service marks used herein are the property of their respective holders. Z19 29981 8/13 A