General Sizes: 2 x 2 and 2 x 4 Lay-In (grid) ceilings tiles; 2 x 2 and 2 x 4 Glue-Up tiles.

Similar documents
LuxCore Installation Instructions

Installation Instructions

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

Installation Instructions

INSTALLATION INSTRUCTIONS

3M Impact Protection Profile Installation System Instructions

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Wall Panel Installation

Installing 3M DI-NOC Architectural Finishes on Doors

Frame Finishing Instructions

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

Loose Lay Luxury Vinyl Plank

QWALL 5.2 (2 Back Panels)

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

How to Install Drop Ceiling Tiles

Engineered Hardwood Flooring Installation Instructions

September 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

suspended ceiling tile INSTALLATION INSTRUCTIONS

Installation Instructions and Details

Application of 3M Pressure Sensitive Films to 3M Panagraphics Substrates

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

Installation Guide. brighter. lighter.

3M Scotchgard Surface Protection Film 2200

EZYSTONE WORKSURFACES

INSTALLATION INSTRUCTIONS

FLEXITEEK INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE VERSION 11/14

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

Palladian/ Keystone Models 202/204 Maintenance Kit

suspended ceiling tile INSTALLATION INSTRUCTIONS

Installation Instructions

Therma-Tru Fiber-Classic and Smooth-Star Sliding Patio Door System

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

Installation Instructions for Viking Hearth Engineered Wood Flooring

Visions Tub Door & Backwall

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

MirroFlex Technical Sheet

Shutter Installation Instructions

Treefrog Technical Information Guide

PBWWinc. Technical Data Sheet. GERLINE Gameline Paint Instructions for Sport Flooring. General Guidelines:

PBWWinc. GEN-U-LINE 4000 Series Application Guide. Technical Data Sheet. General Guidelines:

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

How to Build an Advanced Composite Clipboard

SINKS AND LAVATORIES. Steps to completion: These items are essential for installing all sinks:

Parts List. Description. Installation Instructions

BLADE REPAIR INSTRUCTION BOOKLET

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Wallgard 1,3 product

Power Tape Rubber and Vinyl Stair Treads

PANEL INSTALLATION GUIDE

Flash Coving. Chapter 8 Flash Coving 8. 1

JPM COACHWORKS INSTALLATION GUIDE

M A N U A L 6 June 2017

Wilsonart Decorative Edge Fabrication Manual

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

DASH KIT INSTALLATION

installation manual m y w a l l a r t. c o m

Repairing Sheet-Molded Compound (SMC) With Epoxy

PostIts, and Aleene s are trademarks of their manufacturers and have no affiliation with Real Good Toys

Low V.O.C. 2-Component Polyurethane Game Line Paint System

Installation Instructions for Engineered Wood Flooring

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Flexicryl Splashback Installation Guide Easy DIY Add a Pop of Colour!

Practical Information: ORALITE V98 Conformable Graphic Sheeting

UltraBoard Plus Application Guide

CUSTOM SHUTTERS IN-A-BOX

Cleaning Procedure INTRODUCTION:

Swift assembly guide

DAP Latex Window Glazing

HARRISON S HARDWARE PF5891

Installation Guide. Tools Recommended:

Comfort Designs with Swan Solid Surface

J.W. cobbler 1:160 BUILDING KIT PF5210 WOODLAND SCENICS

Sketchpaint. Ideal for turning any smooth surface into a whiteboard. Ready to use in 5 days

INSTALLATION GUIDE. Table saw or circular saw with fine-tooth blade, caulking gun, rule/tape, drill, file, hammer, plumb line/level, ridge/support.

EXTERIOR PAINTING

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

Matt Morgan Assistant Superintendent of Support Services. Kristine Johnston Director of Purchasing. Date: July 30, 2015

Quality Marine Equipment Since Antifouling Paint For Metal Under The Waterline ROLLER. Application Instructions.

INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL STORAGE

Installation Instructions and Details

My Dreamhouse Add - A - Room

BRUSH APPLICATION INSTRUCTIONS

FLEX 48 x 72 / 60 x 72

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

FIBERGLASS DOOR SYSTEM Installation Instructions

INSTALLATION INSTRUCTIONS

FLEX 28 / 32 / 42 x 72

1. Labels: Do not paint over UL, FMG, or other code-required labels or equipment name, identification, performance rating, or nomenclature plates.

INCEPTIV INSTALLATION GUIDELINES

Revision 1 TECHNICAL SHEET

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

KUBIK INSTALLATION GUIDE

Transcription:

Dimension Ceiling Glue Up Installation Instructions MDC Dimension Ceiling; deeply textured ceiling tiles. Dimension Ceiling tiles are opaque, thermoplastic square and rectangular panels available in Glue-Up, Lay-In, Acoustic/Perforated and Faux Mineral Fiber. General Sizes: 2 x 2 and 2 x 4 Lay-In (grid) ceilings tiles; 2 x 2 and 2 x 4 Glue-Up tiles. Dimension Ceiling tiles ship with a clear protective film or with TuffCote, a revolutionary scratchresistant protective shield, which is added to some Dimension Ceiling finishes. Storing Store flat and acclimatize in the same environment for at least 24 hours before fabrication. Cutting/Fabricating The tiles can easily be cut to size with razor knife and scissors, saw blades, and drilling tools for thermoplastics. When fabricating Dimension Ceiling tiles, always cut from the decorated side, through the finish. Never cut from the back. Cleaning and Care Clean only with warm soapy water or a typical window cleaner. Never use abrasive cleaners. GridMax GridMax is a patented ceiling grid cover system that fits all 15/16 suspension grid systems. GridMax 4 Mains, 2 & 4 Tees, and 4 Wall Covers are available in most Dimension Ceiling finishes. Please inquire for availability. 100 sqft GridMax kits are available in most finishes and are the preferred method of our inventory. CAUTION: All Dimension Ceiling tiles being applied to surfaces with any recommended adhesive systems must be acclimatized. All components to be joined must be acclimatized for 24 hours prior to installation. Installation between 65 F and 80 F and humidity of 80% or less is necessary.

Adhesives Trowel on latex adhesives are recommended for adhering Dimension Ceiling tiles to a surface. Brush-on or roller-on types, non-flammable, and water-based contact adhesives which are suitable for PVC, can also work well. The following is meant as a guideline for adhesives that have been tested and work well with our tiles: Titebond Fast Grab FRP Loctite PL Premium Loctite PL Premium Fast Grab DAP Weldwood FRP 3M 77 (spray on aerosol) Seams Many Dimension Ceiling tiles have a BIO (Built-In-Overlap) which is a flat edge on the top and right of each panel, allowing the next panel to overlap and make the seam less visible. Certain Dimension Ceiling tiles that do not have a BIO may have a Bead and Button feature. To install, overlap two or more sheets or tiles on the bead and button perimeter which will join at the pre-determined connection points. BIO Bead + Button Installations Glue-Up Ceiling Tiles 1. Before starting the installation surface must be dry, smooth, and free from dust, grease, wax, and other particles*. 2. Measure the area to be covered to determine how many tiles you will need. Draw a plan to visualize how the edges and corners will work. When drawing your plan, it is best to center the ceiling tiles on the ceiling leaving equal margins on opposite sides of the room. 3. Now transfer the plan to the ceiling snapping chalk lines to help you keep the tiles aligned. 4. Dimension Ceiling tiles should be installed from left to right, starting at the farthest point away from the room entrance. Some ceiling tiles are designed with a BIO (Built-In-Overlap) which is a flat edge on the top and right of each panel, allowing the next panel to overlap and make the seam less visible. As you work from left to right you want to make sure that the flat edge is always on the right. 5. When overlapping 4 tiles, it is necessary to cut a ½ notch in panel numbers 2 and 3 to avoid an overlap buildup that causes a bump (see sketch 2).

Sketch 2 6. Carefully apply the adhesive to the ceiling (or wall for 2 x 2 wall applications) and lay up your first tile applying pressure as you hold it. (If installing a tile with protective masking, you can remove it at this step of the installation. Make sure the tile is straight before you continue with the next one. 7. Repeat this process, working left to right (and removing the protective masking after installing each panel, if applicable). When finished, use a paint roller on an extension pole to apply additional pressure to the ceiling. Filler strips can be installed around the perimeter of the room if desired. 8. Depending on what type of adhesive is being used, bracing or temporary supports may be required while the adhesive cures. * The method you choose for cleaning prior to application must be compatible with the surface you are cleaning (e.g. denatured alcohol, degreaser, soap & water, TSP, Greased Lightning, etc.). Check the manufacturer s label directions for instructions on using the product. Lay-In Ceiling Tiles 1. Count how many tiles you will need for the installation. For panels that need to be trimmed, use the mineral tile as a template and using your marker and utility knife (razor, scissors, etc.) score the Dimension Ceiling tile to size and then snap the pieces apart. Some 2' x 2' and 2' x 4' sizes might produce sag and require a small amount of panel adhesive in the center to adhere to an existing mineral fiber tile. We also recommend installing under existing mineral fiber tiles to increase sound absorption and to avoid discarding large quantities of tiles. 2. MDC also offers an easy-to-install, hold-down clip system to help support lay-in ceiling tiles, attaching to the top of any existing grid to hold the tiles (low or high profile) in place. This will prevent the tiles from flipping out of place from air leaks and create a smooth visual. This clip system is only necessary if there are no existing tiles in place to support the new Dimension Ceiling lay-in tiles.

3. Install the Grid Max covers to the t-bar suspension grid to allow for a seamless look on your ceiling. Be sure to install all the 4 Main covers first and then install the 2 or 4 Tee covers. The Main covers already come with sections notched out where the Tee grid crosses under it. 4. After all the covers are in place, begin to install all the panels into the suspension grid. 5. If your ceiling needs a place for recessed lighting, be sure to cut out an opening on the tile where the lamp will be attached. Painting Guide If a custom color is desired, choose our standard Dimension Ceiling Gloss White Paintable or EccoFlex Tan Paintable finish or inquire about our custom color matching program. Use recommended paints in accordance with manufacturer s recommendations. Due to the high chemical resistance of it, only certain paints adhere well. It is very important to use recommended paints to paint Dimension Ceiling Gloss White Paintable and Dimension Ceiling Tan Paintable sheets. The following paints have been tested and are recommended: Paintable Painting Guide Vendor Product Prep 1 Prep 2 Lowes Acrolon 218HS SSPC-SP1Solvent Cleaner DTM Bonding Primer Signature Interior or American Tradition Exterior Duramax Paints TSP Cleaner Plastic Primer Spray Benjamin Moore Pratt & Lambert Benjamin Moore Latex or Oil Paint Pratt&Lambert Latex Paint TSP Cleaner Scuff Sanding/TSP Cleaner Fresh Start Primer Supreme Interior / Exterior Multi Purpose Primer EccoFlex Paintable Painting Guide Vendor Product Prep 1 Type Cardinal SuperPaint or Duration or similar Polane Series* or Similar Polyurethane 6400 Series Wiping the sheet with Isopropyl Alcohol (IPA) will help promote paint adhesion. To prepare the surface: EccoFlex sheet surface can be wiped using IPA or rubbing alcohol prior to painting. This method of treatment helps paint attack the surface and create a strong bond to the Dimension Ceilings sheet. Brush application Spray application Spray application * For external applications using Sherwin-Williams Polane Series, use exterior catalyst V66V27. The ratio is 6 parts paint, one part catalyst.

Conditions & Warranty MDC warrants to the original consumer purchaser for one (1) year after date of purchase that, under normal use and service, Dimension Ceilings products are free from manufacturing defects and conform to published specifications. Dimension Ceilings products are intended for primarily interior applications. MDC believes all information contained herein to be correct. It is the responsibility of the fabricator/customer to completely test the adhesives and methods of fabrication to ensure that the results are satisfactory. The seller s only obligation will be to replace product on a one-to-one basis. Neither the manufacturer nor the seller shall be liable for any additional damage or loss, directly or indirectly, arising as a result of using its products. Slight imperfections and color variations can occur and are considered normal. Please inspect each product carefully before fabrication to ensure it meets your needs. MDC is not responsible for any fabrication or ancillary costs involved with using its products. Visit us online at mdcwall.com for the latest additions to Dimension Ceilings. Page 5 of 5