Issues associated with Selection and Use of Gas-lift in Deep water, High Pressure and High Temperature Applications

Similar documents
Princess Subsea Gas Lift Start-Up

Foam Assisted Gas Lift

Integrated Gas Hydrate Prediction in Design and Analysis of Gas Lifted Asset

Automation Breakout Session

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

VPC History and Summary of Work

Real-time Gas Lift Optimisation using Production Universe RTO

Holes in Tubing. a Common Problem in Gas Wells. Rick Nadkrynechny Lynn Rowlan. Gas Well Deliquification Workshop

Enhancing the Production Performance of Dual Completion Gas Lifted Wells using Venturi Orifice Valves

Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea

Clamp-on Gas Flowmeter Flow Loop and Field Trials

The Ziebel MagLev downhole pump

Controlling PCP Wells Using Automated Liquid Inflow Determination in Raton Basin

Oil and Gas Operations in an Urban Environment: Challenges and Opportunities

31 st Gas-Lift Workshop. MY Gas-Lifted Company is Successful Because

The Aggressive Artificial Lift Low Pressure Pilot

New Perspective on Gas-Well Liquid Loading and Unloading

API Standards Overview

Evolution of Rod Pump Systems in Unconventional Wells Leading to Today s Best Practice and Beyond

The Value of Failure Tracking and Analysis Using WellView

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop

Horizontal Well Artificial Lift Consortium (TUHWALP) Progress and Activity Summary

Challenges to Autonomous and Continuous Fluid Level Sensing

Wireless Technologies for Gas Lift Surveillance

Hygr Fluid System Gas Well

Development of the RapidJet Method of Gas Well Deliquification

Hybrid SCADA Communication

Hydraulic TBG Anchor Results from Uintah Basin Wells

Successful Auto Gaslift Trial in PDO

New spread spectrum radios for today's technology

What s in your Radio Communication Tackle Box?

Understanding Wireless Radio Communication Options and the Benefits of Hybrid Wireless Networks

Foam Injection Via Capillary String in Vicksburg Dry Gas Wells in South Texas

Pilot Installation of A Deep Gas Lift System to Optimize Gas Lift Well Performance

Update on API and ISO Gas-Lift Standards and Recommended Practices

Case History: Implementation of Quick and Low Cost Wellhead Compression Testing Using Portable Wellhead Compressors East Texas

TI Designs: Biometric Steering Wheel. Amy Ball TIDA-00292

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Recommended Practice for Flexible Pipe

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

ISO INTERNATIONAL STANDARD

Low Voltage Brushed Motor System

CATALOG FOR WOODCO USA Brand 150 TON SPIDER. API ROTARY TAPER TRADEMARK WOODCO BUY THE BRAND REG. U.S. PATENT OFFICE MANUFACTURER

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries

STP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII

World First Pressurised Subsea Pipeline Repair Facilitated By A Combination Of Non-Piggable And Piggable Isolation Tools

TDK SPICE Netlist Library

TIDA Test Report 1/4/2016. TIDA Test Report 1/4/2016

Compact subsea gas compression solution for maximized recovery


Subsea Structural Engineering Services. Capability & Experience

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Unirac Flat Flashing INSTALLATION MANUAL

TDK SPICE Netlist Library

Texas Instruments. PMP4435 REVA Test Procedure. China Power Reference Design REVA

bakerhughes.com Hammerhead Ultradeepwater Integrated Completion and Production System Improve recovery and minimize risk in frontier plays

1 Photo. Bottom side. 11/7/2014 PMP10783 Rev A Test Results

TI Designs TIDA Automotive 1.3M Camera Module Design with OV10640, DS90UB913A and power over Coax Test Data

STP-NU ROADMAP TO DEVELOP ASME CODE RULES FOR THE CONSTRUCTION OF HIGH TEMPERATURE GAS COOLED REACTORS (HTGRS)

Climate Asia Research Overview

The EDR Aerial Photo Decade Package

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

IMPACT TESTING EXEMPTION CURVES

API COPM CPMA Chapter 20.X

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

WSS-M99P48-A3: 3 Foam Performance, PressureSensitive Adhesive Tape. Pressure Sensitive Adhesive Tape (Interior, Exteriorand Underhood Applications)

Preferred partner. Aker Solutions. Nordic Energy Summit 2013, 21 March Leif Borge CFO

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

January 11, Block BS-4 Atlanta Field Early Production System (EPS)

Working for the future POSGRIP Technology

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Subsea Pump Systems An enabling technology for deepwater developments

LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves

Technical Challenges in Offshore Development New Technology Required for Future Offshore Development

Spotlight On New Technology

Thixotropic Slurry Cup Instruction Manual

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment

Design PMP4489 Test Results

OneSubsea Subsea Sampling System

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

Specification for Subsea Umbilicals

The EDR Aerial Photo Decade Package

Research for Ultra-Deepwater Production

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen

CATALOG FOR PRESSURE CONTROL EQUIPMENT. Supplement 3 API CONNECTOR ACCESSORIES. Ring Gaskets, Flange Bolts and Nuts, Hammer Wrenches TRADEMARK WOODCO

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Coiled-tubing operations and basic tools

International development

STP-PT-054 CONCENTRATED SOLAR POWER (CSP) CODES AND STANDARDS GAP ANALYSIS

TED-Kit 2, Release Notes

Sheet Metal Design Guidelines

Letters.org. PERSUASIVE LETTER. Included: Persuasive Letter

Test Report: PMP30267RevC Automotive Power Solution

Britcham Brasil X Seminário Internacional de Energia

MaxLite LED Self-Driven LiteBars

Transcription:

39 th Gas-Lift Workshop Houston, Texas, USA Issues associated with Selection and Use of Gas-lift in Deep water, High Pressure and High Temperature Applications Wayne Mabry Artificial Lift Team Lead Shell International E&P 2015 Gas-Lift Workshop 1

Table of Content What constitutes deep water and HPHT Deep water issues Well design issues HPHT issues Flow assurance issues 2016 Gas-Lift Workshop 2

What Constitutes HP/HT and Deep Water BSSE and API: Pressure greater than - 15,000 psi; Temperature grater than - 350ºF; Water depth - not defined. Departure from normal gas-lift: Pressure greater than - 5000 psi; Supply gas greater than - 3000 psi; Water depth greater than - 1000 ft. Feb. 4 8. 2013 2013 Gas-Lift Workshop 3

Deep Water Issues Type of wellhead tree: Dry: direct access to well head Wet: access through a bolt on system Riser deployed by a rig Light intervention deployed by a ship Intervention types Slickline/wireline; Stroker Tractor Feb. 4 8. 2013 2013 Gas-Lift Workshop 4

Well Design Issues Well design creating subsea gas-lift constraints: Available compression affecting rate and pressure; Single point verse multiple gas-lift stations; Maximum operating pressure of other well bore equipment; Tubing/casing design issues; Crater depth. 2013 Gas-Lift Workshop 5

HPHT Issues HPHT issues creating gas-lift constraints: Gas injection phase conditions; Gas-lift equipment limitations ; Metallic materials; Non-metallic materials; TRO calculation/setting; Barrier check; Gas-lift design process Software limitation ROT limitations 2013 Gas-Lift Workshop 6

Flow Assurance Issues Flow assurance issues creating gas-lift constraints: Formation of organic/inorganic deposits; System Stability; Start-up/shut-in issues. 2013 Gas-Lift Workshop 7

Copyright Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas-Lift Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the American Society of Mechanical Engineers (ASME), rights to: Display the presentation at the Workshop. Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee. Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee. Other uses of this presentation are prohibited without the expressed written permission of the company(ies) and/or author(s) who own it and the Workshop Steering Committee. 2016 Gas-Lift Workshop 8

Disclaimer The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas-Lift Workshop Web Site. The Artificial Lift Research and Development Council and its officers and trustees, and the Gas-Lift Workshop Steering Committee members, and their supporting organizations and companies (here-inafter referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas-Lift Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained. The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials. The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, noninfringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose. 2016 Gas-Lift Workshop 9