INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508

Similar documents
INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1515

GALVANIZED STEEL SHED 1.5 x 0.8 x 1.5M

GALVANIZED STEEL SHED GREEN 1.5 X 1.5 X 1.9M

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m

GALVANIZED STEEL SHED 1510 x 1510 x 1900mm

GALVANIZED SHED 2.3 X 2.3 X 1.9M

FREE RANGE TM 59 X59 X78 HEN HOUSE TM

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height

INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 1.5 x 0.8 x1.5m

GardenShed 2.3W x 2.3D x 2.4Hm

INSTRUCTIONS FOR: 2 DOOR WALL CABINET. MODEL No: AP02WC

1.6M X 2.4M GARDEN SHED ASSEMBLY INSTRUCTIONS EZ-16242

Absco Aviary Assembly Instructions Model: A23231G

Absco Space Saver Shed Assembly Instructions Model: 15081S

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

ASSEMBLY INSTRUCTIONS GL75. BASE SIZE: 2.190m x 1.520m

Absco Premier Garden Shed Assembly Instructions Model: 23231GK

English/French 06/04

ASSEMBLY INSTRUCTIONS SS2010. BASE SIZE: 2.020m x 1.020m

Absco Premier Garden Shed Assembly Instructions Model: J30302G

Absco Premier Garden Shed Assembly Instructions Model: J30302G

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

Model No. EP84-A, EP84AR-A, P84L

S H E D A S S E M B L Y I N S T R U C T I O N S

Absco Space Saver Shed Assembly Instructions Model: J30082S

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m

NEVADA ASSEMBLY INSTRUCTIONS

Absco Regent Shed Assembly Instructions Model: J30372R

S H E D A S S E M B L Y I N S T R U C T I O N S

INSTRUCTION MANUAL J23232GK

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

Before fitting door, check opening size and squareness of timber frame. The door is made smaller to give correct clearance within the frame.

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

Absco Highlander Shed Model: 3045HK

Gardman Lean-to Greenhouse Assembly Instructions

INSTALLATION INSTRUCTIONS Lateral Shift Accessory Model: PAC-800

ASSEMBLY INSTRUCTIONS FOR MODEL GW86-A

DESIGN TRIPLE PANE BATH SCREEN

GARAGE DOOR WITH TORSION SPRING

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

Potting Store Assembly Instructions

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

planer/thicknesser 200 x 120mm

Greenhouse Assembly Instructions

Corner Potting Store Assembly Instructions

SHED-5932-F, MANUAL.doc

ASS 70 FD folding / sliding door. Installation Guide

Vanity Cabinets and Mirrors Installation and User Guide

Installation Instructions

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

DUTCH GABLE FREESTANDING CARPORT

Outdoor Water Solutions, Inc. Small Backyard Windmill. Installation Manual

HEAVY DUTY 11 STEEL CABINET

Walk-in Greenhouse. Assembly instructions. 6x4. 6x6. 6x8. Model GH0490 Model GH0491 Model GH1040. Model GH0492 Model GH0493 Model GH1041

Outdoor Water Solutions, Inc. 9 Backyard Windmill. Installation Manual

DESIGN QUADRANT SINGLE DOOR

738 SERIES PIVOT SHOWER DOOR

Assembly Instructions

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Ensure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.

Installation Instructions

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

HANDI-MATE SHED BEFORE YOU START INSTALL GUIDE HINGED DOOR HANDI-MATE INSTALLATION GUIDE PRIOR TO INSTALLATION

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

INSTALLATION INSTRUCTIONS, AND PARTS LIST

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

LAWN AND GARDEN GREENHOUSE

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

ASSEMBLY INSTRUCTIONS FOR MODELS CG105, CG106, CG107, CG108, CG109 HD105, HD106, HD107, HD108, HD109 WO105, WO106, WO107, WO108, WO109 AAA01

Roof Only Lean-to Instruction Manual

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Walk-in Greenhouse. Assembly instructions. 8x6. 8x8. 8x10. 8x12. Model GH1399A Model GH1400A. Model GH1402A Model GH1403A. Model GH1405A Model GH1406A

LAWN AND GARDEN GREENHOUSE

GRANDIO G R E E N H O U S E S. Model GRA-812BR-GR. 8x12 GRANDIO ELITE GREENHOUSE USER MANUAL

Installation Instructions

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Integrity Polygon and Round Top Installation and Finishing Instructions

INSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED

THE HANDY GARDEN SHED. SNSD-E Owner s Manual

INSTRUCTIONS FOR ASSEMBLY 2355mm x 4665mm Workshop

Garden Room 2.4m BCGRSM2360 Assembly Instructions

ASSEMBLY INSTRUCTIONS FOR MODELS CG85, CG86, CG87, CG88, CG89 HD85, HD86, HD87, HD88, HD89 HW85, HW86, HW87, HW88, HW89 WO85, WO86, WO87, WO88, WO89

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Panoramic Door Block Frame Installation Manual

INSTALLATION INSTRUCTIONS for the JOMY RETRACTABLE LADDER. If there are any questions, please call (800)

340 & 350 SERIES BATH ENCLOSURES

ASSEMBLY INSTRUCTIONS

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Ledger Board Lean-to Instruction Manual

640D & 650D SERIES FRAMED BYPASS BATH ENCLOSURES

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Absco EZISLIM Shed Model: 08151F

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Transcription:

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508 Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions and properly maintained, give you years of trouble free performance. IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS. USE THE PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/OR PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY. PLEASE KEEP INSTRUCTIONS SAFE FOR FUTURE USE. WARNING! Ensure Health & Safety, local authority, and general workshop practice regulations are adhered to when building this shed. Keep the work area clean, uncluttered and ensure there is adequate lighting. Keep children and unauthorised persons away from the working area. DO NOT use the shed for any purpose other than that for which it is designed. Use appropriate safety clothing including eye protection. Note! The assembly of this product will require assistance. Before commencing the assembly, we recommend that you read the instructions thoroughly. Your new shed comes with all the holes pre drilled to make for fast easy assembly. We recommend that you assemble the shed using a trestle table or sawhorses and planks. This will ensure that you are working off the ground and make it easier for you. Assembly is a two person job and should not be attempted in windy conditions. Step 1: Check all parts against the component list. Step 2: Assemble the rear wall panels. Step 3: Assemble the side wall panels. Step 4: Assemble the roof panels. Step 5: Assemble the front wall panels. Step 6: Assemble the front door. Step 7: Fit the panels together. Concrete Slab: It is recommended that your new shed is secured to a concrete slab as per the specifications in this manual.

Concrete slab: Please ensure that your site is level. It is recommended that your slab is 100mm thick and you use builders plastic and F52 reinforcing mesh. We recommend that you make your slab 100mm bigger than the base dimensions of your shed. This will allow for a 50mm edge around your shed. We recommend that you slope the 50mm edges downward by 10 mm so that rain water can be drained away from your shed.

Tools Required:

Step 1. Check all parts against the component list. Lay out all parts with number facing outwards and check off against parts list. Part Picture Description Component Location No. QTY Check Sheet Sheet 1980x770 creamleft rear wall 1L 1 Sheet Sheet 1980x770 creamright rear wall 1R 1 Sheet Sheet 1900-1980x770 cream-left side wall 2L 1 Sheet Sheet 1900-1980x770 cream-right side wall 2R 1 Sheet Sheet 855x770 cream roof 3 2 Sheet 1900x708 cream front 4 1 Door Sheet 1845x770 cream door 5R 1 Channel channel 1508 off white roof 20A 2 Channel channel 1508 off white rear wall 20B 1 Channel channel 1508 off white rear wall 20C 1 Channel channel 1508 off white front 20D 1 Channel channel 1508 off white front 20E 1 Channel channel 768 off white side wall 21A 2 Channel channel 768 off white side wall 21B 2 Channel channel 1898 off white front 22 1 Channel channel 775 off white front 23 1 Channel channel 1458 off white rear wall 31 1 Channel channel 718 off white side wall 32 2 Channel channel 674 off white front 33R 1

Jamb jamb 1898 white front 41A 1 Jamb jamb 1898 white front 41B 1 Jamb jamb 775 white front 42 1 Lip lip 856 off white roof 50 2 FITTINGS PACK Picture Component QTY Picture Component QTY Self tapping screws(10mm) 120 Self tapping screws(16mm) 10 4*10mm Rivet 12 3*10mm Rivet 6 Pad bolt 1 Keeper 1 Bracket 8 M8*18m/m Hexagonal bolt 8 M8 Hexagonal Nut 8 Mid wall brace bracket 3 Self tapper safety cover 25 Channel safety cover (L type) 1 Channel safety cover (R type) 1 Rawlbolt 8 ` In the unlikely event that you find you are missing a part, please contact your Sealey dealer.

Shed Overview

Step 2: Assemble rear wall panels. You will find it easier to assemble your shed using sawhorses with timber studs attached ( timber needs to be the same length as the shed (1.5M) or alternatively, a trestle table. Place 1R and 1L on the sheeting your work table and join together with the self tapping screws per the diagram.

Now fit 20B top channel and 20C bottom channel to the sheeting by tapping it in (diagram A) or sliding it in. (diagram B) Be noted that the small lip of the channel is always facing out. This is to ensure that rain water can not build up inside your shed.

Now fit 31 mid wall channel to the sheeting and position it by the self tapping screws. Please note that the groove should face downwards. Fix the top and bottom channels using the self tapping screws.

Step 3: Assemble side wall panels Place 2L the sheeting on your work table and tap or slide in 21A top channel and 21B bottom channel. Fix and position the 32 mid wall channel by the self tapping screws. Fix 21B the bottom channel by the self tapping screws but not 21A the top channel in this stage. Note that the small lip of the channel is always facing out. This is to ensure that rain water can not build up inside your shed. Repeat the same steps for 2L the other side wall.

Step 4: Assemble the roof panels. Place 3 and 3 sheeting on your work table and join together with the self tapping screws per the diagram. Now tap or slide in 20A and 20A the channels to the sheeting and fix them using the self tapping screws. Now fit 50 and 50 side lips to the sheeting and fix them using the self tapping screws.

Step 5: Assemble the front wall panels. Place 4 the sheeting on the work table. Fit 20D the top channel, 20E the bottom channel, 41B the jamb (There are pre-drilled holes for next step on both 4 and 41B and must be aligned.) and 33R the mid wall channel to the sheeting and fix them using the self tapping screws. (NOT those with cross mark in this stage) Fit the 41A the jamb, 42 the jamb and 23 the bottom channel in following and fix them using the self tapping screws (NOT those with cross mark in this stage). Be aware of the joint details per the diagrams. (DIAGRAM B IS AS THE SAME AS DIAGRAME A.)

Step 6: Assemble the front door. Fit 5R the pre-assembled door to the front wall panel per the diagram. Use riveter to fix the door into the pre-drilled holes. Fix the pad bolt (but NOT its keeper in this stage) to the pre-drilled holes using supplied rivets or self tapping screws.

Step 7: Fit the panels together. Attach the two side walls to the back wall, then the front wall, then the roof. Fix all the components by the self tapping screws. Fix the pad bolt keep with rivets or screws. FOR GREATER SECURITY RIVET AS BELOW

Now fit the bolt down kit using the supplied Rawl Bolts as per the diagram. Strengthen your mid wall brace by applying 72 the mid wall brace bracket on each corner if necessary. RAWL BOLT

Sealey sheds are weatherproof; however, heavy winds with driving rain could cause your shed to leak. Condensation will also occur in some weather conditions such as extreme heat or cold. We would recommend the use of a waterproof sealant to help seal around all joins and wherever you feel that water may get in under these extreme conditions. Shed is not to be used to store corrosive substances or as a chemical store. Apply channel safety cover L type on channel 32 and R type on channel 33R. Apply the self-tapper covers on the screws fixed on the wall to prevent accidental injuries.

If required, the door can be assembled on the opposite side. Align the door with the edge and drill new holes. Remove the pin from the hinge and reverse it before assembling the door. Fill the old pre-drilled holes with rivets if required. Perform the same procedure for the pad lock. NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice. IMPORTANT: No liability is accepted for incorrect use of this product. WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim. INFORMATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode. Sole UK Distributor, Sealey Group, Kempson Way, Suffolk Business Park, Bury St. Edmunds, Suffolk, IP32 7AR 01284 757500 Web www.sealey.co.uk 01284 703534 email sales@sealey.co.uk Original Language Version GSS1508 Issue: 1-24/05/10