LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS

Similar documents
MADISON METROPOLITAN SEWERAGE DISTRICT MADISON, WISCONSIN PUMPING STATION 15 REHABILITATION CITY OF MADISON PLANNING COMMISION SUBMITTAL

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Operating Standards Attachment to Development Application

Last Name: First Name: M.I:

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

754 Sir Francis Drake Boulevard

City of Santa Paula Planning Department

CITY OF MERCER ISLAND

Assignment 1.5 Pre-Design Base Building Model Investment Bank ARCH 5901 Instructor: Glenn Hill Fall 2013

DESIGN REVIEW PROCESS AND APPLICATION

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Operating Standards Attachment to Development Application

ARB ACTION MEMO. Mr. Wardell called the meeting to order at 1:00 p.m. and established a quorum.

Major Site Plan Application

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Goodwill Arden Hills, Minnesota

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Intentionality: Competing in the 21 st Century

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

ADMINISTRATIVE REGULATION Governing The Submittal and Review of Unified Commercial/Mixed Use Development Use Permit Applications

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

PASON OFFICE BUILDING

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

CASE STUDY 50 ASCENT, WINTER 2017

BAY MEADOWS SPECIFIC PLAN

PROJECT ENTITLEMENT APPLICATION

APPLICATION FOR SITE PLAN CONTROL

Checklist for Minor Plan Modification

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

5.7 Plan Documentation and Supporting Information.

SITE PLAN APPLICATION

6.05 acres acres Single-family attached

Minor Site Plan Application

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Recommended Changes to the Public Hearing Draft Zoning Ordinance

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Applying for a Site Development Review

Lantz-Boggio Architects 5650 DTC Parkway, Suite 220 Englewood, CO UPPER LEVEL 113' - 4"

GENERAL REQUIREMENTS (Print or Type) PROJECT DESCRIPTION OWNER CERTIFICATION

Article 4.0 Measurements and Exceptions

Conceptual, Preliminary and Final Site Plan Review in Holladay City

NON-RESIDENTIAL DEVELOPMENT

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

824 University Mixed-Use

185'-3 5/8" LOT DEPTH 92'-7 13/16" 92'-7 13/16" N89 54'02"W ' 24' HEIGHT LIMIT 31' HEIGHT LIMIT

Proximity to Employee Housing and Centers of commerce. 2 Minutes to Georgetown. 3 Minutes to The Pentagon

b. What would the projected employee count be at 100% leased? Applicant s Response: The projected maximum employee count is approximately 500.

ADMINISTRATIVE DESIGN REVIEW Information

PLANNING Development Services Department

Intentionality: Competing in the 21 st Century

PLANNING AND DEVELOPMENT

What Plans Do I Need for a Building Permit?

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

Site Development Permit Submittal Requirements

Moorhead / Dilworth Fixed Route Expansion Study

CONCEPT REVIEW GUIDELINES

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Central District Retail Phase I Site Plan #90

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Site Plan/Building Permit Review

UCL CULTURE. Artist Brief 1. Permanent commission for public access areas Destination artwork

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

ARCHITECTURAL REVIEW BOARD MINUTES September 6, 2011

Schedule. Aerial Photo. Mawson Oval. City of Holdfast Bay Sporting Reserve Community Land Management Plan 30

Procedure for Obtaining Design Review Committee Approval

View referenced exhibit back-up material. (See Report to the City Council No ) Adoption of a Resolution certifying findings that:

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

MILLENNIUM TOWER AVENUE SW CALGARY, ALBERTA

Discretionary Project Submittal Requirements

Porter County Plan Commission

CITY OF CAPE CANAVERAL COMMUNITY APPEARANCE BOARD APPLICATION PACKET

VARIANCE APPLICATION INFORMATION SHEET

SOUTH BAY CORPORATE CENTER

Addendum for 2018-COA-486 and 2018-COA-487 for the LeRoux and Cho 77 Projecting signs

March 1, Buildings for Our Future: 2016 Update

Item 2. September 28, 2017

A-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile

SITE STATISTICS SQ.FT [ SQ.M.]

Essential Skills: Reading and Interpreting Maps and Plans

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

The New Transit Oriented Town Center Development. metrocentreom.com 100 Painters Mill Road, Owings Mills, MD

COUNTY COUNCIL OF PRINCE GEORGE S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL ORDER OF REMAND

Transcription:

LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS

Project Introduction Address: Chuck Noll Way & West General Robinson Street Zoning District Riverfront - IPOD-5 (Interim Planning Overlay District) Project Description A new structured parking facility located within surface parking Lot 1 Approximately 331,600 GSF with 1,000 spaces Protected bicycle parking for 100 bicycles Situated near LRT Stations, Bus Stops, Pittsburgh Bike Share Station & Heritage Trail Green Garage Certification Goal Gold Award Level 1

Location Map Site N 2

North Shore Master Plan Addendum 3

North Shore Master Plan Addendum 4

North Shore Master Plan Addendum 5

North Shore Master Plan Addendum 6

Site Influences West Gen Orientation Lot 1 PM AM B Pedestrian Paths Bike Paths Lot 1 Easements N 7

Landscaping Plan Lot 1 North Lot 1 East (Existing) 21 Shade Trees 11 Ornamental Trees 475 Shrubs Note: All Dimensions Approximate Lot 1 West (Existing) N 8

Proposed Plant & Landscape Materials Increase Pervious Surface Low Maintenance, Native & Indigenous Biodiversity Appropriate Mature Size Groundcover, Perennials, Shade Trees Consistent Fencing & Bollards Lot 1 Easements 9

Site Context Vantage Points C V Z Y R X Q W E F D N S G P U T I J J M K H O L B A N 10

Context W. General Robinson Street Lot 1 View F Easements West General Robinson Street Garage 11

Context North Shore Drive Lot 1 View J Easements Stage AE View K N. S. Place N I/II 12

Context Three Rivers Heritage Trail View L Big Heart Pet Brands Building N 13

Context Chuck Noll Way View M North Shore Place I N 14

Context Heinz Field View U Looking Northeast 15

Building Elevations LIGHT POLES COLORED PRECAST CONCRETE TEXTURED PRECAST CONCRETE ALUMINUM AERO-FOILS ALUMINUM PANEL FASCIA 68-10 61-9 74-4 ALUMINUM STOREFRONT FRAMING PERFORATED METAL SCREENS GREEN SCREENS South Elevation 16

Building Elevations LIGHT POLES COLORED PRECAST CONCRETE TEXTURED PRECAST CONCRETE ALUMINUM AERO-FOILS 65-0 65-0 METAL SCREENS North Elevation 17

Building Elevations COLORED PRECAST CONCRETE TEXTURED PRECAST CONCRETE ALUMINUM AERO-FOILS LIGHT POLES COLORED PRECAST CONCRETE TEXTURED PRECAST CONCRETE ALUMINUM AERO-FOILS ALUMINUM PANEL FASCIA 74-4 78-0 65-0 50-9 61-9 68-10 PERFORATED METAL GRILLES GREEN SCREENS METAL SCREENS PERFORATED METAL GRILLES East Elevation West Elevation 18

Perspective Views Aerial Context View 19

Aerial View 20

Aerial View w/ PV Array 21

Elevated View 22

Elevated View w/ PV Array 23

Chuck Noll Way Looking North 24

West General Robinson Looking West 25

Tony Dorsett & Reedsdale Street Looking West 26

Reedsdale Street Looking West 27

Route 65 Looking Southeast 28

Fort Duquesne Bridge Looking Northwest 29

Heinz Field Looking East 30

Garage Facade Landscaping Removed 31

Garage Facade Looking East 32

Art Rooney Avenue Looking West 33

West General Robinson Looking Northwest 34 West General Robinson Looking North 31

West General Robinson Looking North 35

Point State Park Looking North 36

Fort Duquesne Bridge Traveling North 37

Route 65 Traveling East 38

Building Materials Concrete: Natural & Textured Aluminum Louvers & Storefront Framing Glass Green Screens Exposed Steel Perforated & Wire Screens 39

Sustainability & Stormwater Management Green Parking Council Increased Energy Efficiency and Performance Reduced Environmental Impact Efficient Parking Space Management Integrated Sustainable Mobility Services and Technologies Diversity of Sustainable Transportation Options Stronger Community Relationships Goal: Gold Green Garage Award Level Stormwater Management Increasing Pervious Surface Area Stormceptor Bio Swales (Planted & River Rock) Ground Cover Plant Diversity 40 1

Accessibility & Universal Design Accessible Car & Van Parking Elevators Serving all Levels Speed Plateau & Material Change at Main Pedestrian Crossing Dedicated Bike Path 41

Community Process Ongoing Meetings: Planned Meetings: ALCO Parking Bike Pittsburgh Continental Real Estate Green Building Alliance North Side Leadership Conference Allegheny City Central Association Allegheny West East Allegheny Community Council Manchester Citizens Council North Shore Stakeholder Group Pittsburgh Bike Share Pittsburgh Downtown Partnership Pittsburgh Pirates Pittsburgh Steelers Port Authority of Allegheny County Public Stadium Authority Board Meeting Riverlife 42 42

Transportation Study - Scope 12 Intersections Analyzed Daily Weekday Event Weekend Event Coordinated w/ City Planning 43

Circulation Weekday Ingress Typical Weekday N 44

Circulation Weekday Egress Typical Weekday N 45

Circulation Pirates Ingress/Daily Egress Typical Weekday N 46

Circulation Pirates Egress Typical Weekday N 47

Circulation Pirates Ingress Typical Weekend N 48

Circulation Pirates Egress Typical Weekend N 49

Circulation Steelers Ingress Typical Weekend N 50

Circulation Steelers Egress Typical Weekend N 51

Design Parking Statistics Two-way Level Floor Plates (West, East & South) w/cascading Ramps (North) 90 Parking Layout 1,000 New Garage Spaces, Approx. 608 Net Gain in Lot 1 Total of Approx. 1,758 Spaces 52

Design Bicycle Parking Protected Bicycle Parking for a Minimum of 100 Bikes Bike Maintenance Station Adjacent to Manager s Office Security Cameras Dedicated Entrance 53