Meva Guided Screens MGS Technical Instruction Manual

Similar documents
MEP Shoring System Technical Instruction Manual

MEP Shoring System Technical Instruction Manual

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

February 2004 RONDA. Circular Formwork Instructions for assembly and use

Experience the Hi-Lite Advantage

6.1. PUSH-PULL-PROPS and accessories

1.1. THREADED SLEEVES for different fixing purposes

MevaDec. Contents. Ref. No. Description / Application Product m² list kg

Big expertise. Real convenience. Concrete commitment. stem

H20 Beam for Elevated Slabs Application Guide

CaroFalt. Contents. Product list

User Guide MEGAFORM 02FAR14

Products for fixing to Steelwork and Decking

THE POWER OF RED SPACE-LIFT CONCRETE CONSTRUCTION PRODUCTS APPLICATION GUIDE

SPACE-LIFT DAYTONSUPERIOR.COM APPLICATION GUIDE. Jump Forming System

Clopay Models 835/837 Sliding Door System Installation Guide

Installation Instructions - Model V4JSD 1

HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Circular Column Formwork Circo. Contents. Product list. Ref.-No. Description / Application m² kg

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Installation Instructions

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Imperial Technical Instruction Manual

Clamping devices 521

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

Assembly instructions Pantograph shutters

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

3.1 General Provisions

MEFA mounting accessories

96 (Standard Length)

Installation Instructions

HV Support System. The HV Support System is compatable with all CSS Support Systems:

Notes. Modifications and constructional corrections arising particularly from technological development excepted.

Independent Containment System (ICS)

Closet System Installation Manual

Installation Instructions

2. Connect driver to power source leads. After connections are made, place driver above ceiling. SEE MINIMUM SPACE REQUIREMENTS BELOW.

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

U.S. Solar Mounts TOP Mount Installation Instructions. Adjustable 4 (2) 60-Cell Module Top-of-Pole Mount REV 1

ALDoor DOUBLE DOOR INSTALLATION

KS SERIES - VERTICAL INSTALLATION

Mounting a BalanceBox 400 to a brick wall

BioPrism Solid Surface

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Oxford Stalls Installation Instructions

ClearSpan End Frame Kit 26' Wide x 12' High

MPA-9000 Universal Ceiling Projector Mount Kit

THE POWER OF RED STEEL-PLY CONCRETE FORMING SYSTEM APPLICATION GUIDE

PERFORM WITH PRECISION MAX A FORM STS FORMING SYSTEM CONCRETE CONSTRUCTION PRODUCTS APPLICATION GUIDE

Acrowall-60 General Technical and Application Manual

Installation Manual for Gate Guard

technical sheet facade stabilization anchors shoulder bolt type Description

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Pole Mount Installation Manual

SPECIFICATION SHEETS SOFTERCLOS HINGE FOR. FRAMELESS GLASS pool fencing

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

Modular XP Ramp Assembly Manual

MM750 Installation Instructions

EURO-BEARINGS LTD COMBINED ROLLER BEARINGS & MATING STEEL PROFILES

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

BIKE FILE (301)

Track Rack. * Track Racks are not lockable

Modular XP Ramp Assembly Manual


8 Ft Wide Enclosure Assembly Guide

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

RAPID-EPS SAFETY INSTRUCTIONS AND INSTALLATION GUIDE. American Standard OSHA

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

Fixed Wall Arm. Installation Guide. Part number Rev E 2012 PolyVision Corporation All rights reserved

INSTALLATION INSTRUCTIONS

southpaw enterprises, inc.

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

MONOPRICE. Above Fireplace Pull-Down Full-Motion TV Wall Mount. User's Manual P/N 27773

JOINT FOR ELLIPTICAL BAR (LUXE) C = Nominal boom length. Rubber bead boom A. ig.1

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

HPD Aerated concrete anchor. Approvals / certificates. Basic loading data (for a single anchor)

Installation Instructions

Pole Mounting System Installation Manual

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS FOR 9000 DOOR

SINGLE SLIDE RAIL INSTALLATION INSTRUCTIONS

Assembly Instructions 10 X 10 Aluminum Roof Support

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Installation Instructions for Solar Snow Pad (SSP-T-3)

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation Guide. Rockfon Eclipse

Gared Pro-S Portable Backstop

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

OVERVIEW You are installing 2 Major components: SITE PREP Remove organics

MOSO precast fixings for concrete façades

The General Principles of Detailed Design at Ruukki Construction Ltd. Julia Piiroinen

General Layout. Eng. Maha Moddather

Qwik-Fence Installation Instructions

INSTALLATION INSTRUCTIONS

Transcription:

Meva Guided Screens MGS Technical Instruction Manual

Product Characteristics: The MEVA Guided Screens (MGS) system encloses complete floors especially in high-rise construction independent of the height of the building. The MGS System allows to choose the size of the screens to adapt to buildings of any shape. Screens which cover a huge area can be lifted quick and safe in one pick. Maximum safety is guaranteed in all work phases: The complete windshield unit remains anchored to the building during the entire construction period. Thus, safe working conditions are given, even in great heights. It is as safe as working on ground. Through the guiding rails the MGS system is also connected and secured to the building when moving one unit to the next cycle. Wide working platforms equipped with fall protection at all sides improve the safety and the efficiency of the personnel. Work can be done independent of climatic influences: Safe working is possible up to wind speeds of 70 km/h. Advantages: A protection system, which encloses a complete floor under construction The System protects against wind and weather and improves productivity and efficieny The lifting process is quick and safe due to guiding rails MGS is a system with single units resulting in a perfect adaptation to any building layout Most economical solution due to flexible sizes of single units Abbreviations, dimensions, figures, tables etc. The abbreviation MGS is used for Meva Guided Screens. Any further abbreviations are explained where they are used the first time. Measurements: This manual uses the metric system and thus m (for metre), cm (for centimetre) and mm (for millimetre). Dimensions without a unit are in cm. The page numbers in this manual start with MGS. The figures and tables are numbered per page. Depending on its product abbreviation, a cross reference in the text refers to a page, table or figure in this or in another manual. October 2011 MGS 2

MGS MEVA Guided Screens Please note: Contents This Technical Instruction Manual contains information, instructions and hints describing how to use the MEVA equipment on the construction site in a proper, quick and economic way. Most examples shown are standard applications that will occur in practice most often. For more complicated or special applications not covered in this manual, please contact the MEVA experts for advice. When using our products the federal, state and local codes and regulations must be observed. Many of the details shown do not illustrate the climbing system in the ready-to-pour condition as to the aforementioned safety regulations. Please adhere to this manual when applying the equipment described here. Deviations require engineering calculations and analysis to guarantee safety. System description...4-5 System description - Platform...6 Load capacity of platforms...7 Load capacity of climbing cones...8 Assembly of climbing cones...9 Dimensioning (height) of climbing cycles...10 Assembly...11-12 Operating sequence...13-14 Corner platforms...15-16 Notes...17-18 Product list...19 Assembly instructions (created by site management) are intended to minimise site-specific risks and must contain the following details: The order in which all working steps including assembly and disassembly must be carried out The weight of the panels and other system parts The type and number of ties and braces as well as the distance between them The location, number and dimensions of working scaffolds including working area and fall-down protection Pick points for panel transport by crane. Please observe the manual since any deviation may require an additional structural analysis. Important: Generally, only well maintained material may be used. Damaged parts must be replaced. Apply only original MEVA spare parts for replacement. MGS 3

System description 1 2 3 Trapezoidal sheet Square timber 8/14 Guard rail post 140/3000 with timber fixture 3 2 3 4 Planks 5 Ledger 1 6 Guiding profile (8850/7750) 7 Cover sheet 4 8 Platform 11 9 Bracing (Threaded rod) 10 Sliding sheet (25 x 150) 5 6 1 7 8 2 Description...Ref.-No. 9 Trapezoidal sheet 915/1600...................29-945-85 Trapezoidal sheet 915/3000...................29-945-80 Guard rail post 140/3000 with timber fixture....29-942-30 Timber fixture U200 - ledger...................29-943-40 Guiding profile 8850...29-941-10 Guiding profile 7750...29-941-20 Cover sheet...29-944-85 Threaded rod 60 LH...29-009-10 Threaded rod 70 LH...29-009-15 Threaded rod 80 LH...29-009-20 Threaded rod 130 RH...29-009-40 Threaded rod 180 RH...29-009-50 Threaded rod 230 RH...29-009-60 Threaded rod 280 RH...29-009-70 Threaded rod extension 29-009-90 Turnbuckle nut M 16...29-009-95 Fig. 4.1 10 8 Fig. 4.2 MGS 4

MGS MEVA Guided Screens System description 1 2 3 4 5 1 2 3 4 5 6 7 8 Guard rail post 140/3000 with timber fixture Steel beam U160 with square timber 10/16 Top platform profile Timber fixture U200 - ledger Safety lock MGS red - final position Platform Timber fixture U200 with square timber 8/14 Spacing plate 20 - ledger 6 9 Trapezoidal sheet 4 Description...Ref.-No. Fig. 5.1 7 6 8 9 Fig. 5.2 Guard rail post 140/3000 with timber fixture....29-942-30 Timber fixture U200 - ledger...................29-943-40 Spacing plate 20 - ledger...................29-944-80 Steel beam U160, l = 3000...................29-014-30 Steel beam U160, l = 4000...................29-014-40 Steel beam U160, l = 5000...................29-014-50 Steel beam U160, l = 6000...................29-014-60 Top platform profile...29-941-60 Safety lock MGS red - final position...29-943-80 Platformgirder 1800-2900...................29-945-40 Platformgirder 2300-3400...................29-945-30 Platformgirder 2800-4700...................29-945-20 Platformgirder 3300-5000...................29-945-10 Timber fixture U200...29-943-10 MGS 5

System description - Platform Top platform 1 Trapezoidal sheet 2 Top platform profile 3 Steel beam U160 4 Square timber 10/16 5 Planks (Thickness 5 cm) attached to steel beams U 160 and square timber 16/8 6 Guiding profile 7 Guard rail post 140/3000 with timber fixture 8 Carriage bolt M12x100 (Attachment of square timber 8/14) 9 Carriage bolt M12x130 (Attachment of square timber 10/16 at steel beams) Fig. 6.1 1 2 3 4 5 6 7 8 9 Lower platform 1 Trapezoidal sheet 2 Guiding profile 3 Planks (Thickness 5 cm) attached to platform girders and square timber 12/6 4 Platform 5 Carriage bolt M12x70 (Attachment of planks 5x14) 6 Timber fixture Fig. 6.2 1 2 3 4 5 6 MGS 6

MGS MEVA Guided Screens Load capacity of platforms q=+/- w 2.0 kn/m 2 Top platform Table to determine Wind speedt, impact pressure and wind load Wind speed (v) Impact pressure (q) [m/s] [km/h] [kn/m²] 28.3 101.9 0.50 35.8 128.9 0.80 42.0 151.2 1.10 A climbing unit MGS consists of one top platform, and one or more lower platforms and is designed for the following loads: Top platform, Scaffolding group 3: 2.00 kn/ m² Lower platform, Scaffolding group 1: 0.75 kn/m² per level 45.6 164.2 1.30 46.7 168.2 1.36 55.3 199.0 1.91 v = Wind speed [m/s] or [km/h] q = impact pressure [kn/m²] q = v² [m/s]/1600 0.75 kn/m 2 Lower platform Tab. 7.2 Attention If the wind speed exceeds 20 m/s (72 km/h) the moving of the MGS units has to be stopped. Ice and snow on the climbing unit must be removed prior to use. 0.75 kn/m 2 Fig. 7.1 Lower platform MGS 7

Load capacity of climbing cones The charts on this page illustrate the admissible load on the climbing cone 15/M24 in combination with the anchor plate 15/120 and the suspension screw M24 (installation depth = 160 mm) or the anchor plate 15/170 and the suspension screw M24 (installation depth = 210 mm). The concrete mix is equivalent to a C 20/25 concrete. The nominal strength ß WN is indicated in N/mm². This minimum compressive strength ß WN is necessary due to the locally limited strength which is relevant for the cone. The nominal strength ß WN has to be documented on site by means of concrete test cubes. Fig. 8.1 1 Axial load 2 Resulting suspension load 3 Shear load Permissible load of the climbing cone 15/M24 With anchor plate 15/120: Installation depth 160 mm 3 Shear load in kn 90 80 70 60 50 40 30 1 2 5 N/mm² 75 The load angles between 15 and 75 are measured perpendicular to the concrete surface, that means that the angle is 0 if an axial force is applied and 90 if a shear force is applied. According to type test FMPA Baden- Würt temberg (Test report Nr. 24-21151/2). 15 N/mm² 10 N/mm² 60 25 N/mm² 45 N/mm² 35 N/mm² 45 30 Attention Please observe approval Nr. 21.6-1751 of DIBt, especially part 4.4. You can order the approval via info@meva.de. For applications, not covered in the approval the charts of the type tests can be used. Permissible load of the climbing cone 15/M24 With anchor plate 15/170: Installation depth 210 mm 20 10 0 90 80 70 0 10 20 30 40 50 60 70 80 90 75 Axial load in kn 60 15 45 Shear load in kn 60 50 10 N/mm² 30 25 N/mm² 40 5 N/mm² 15 N/mm² 30 15 20 10 0 0 10 20 30 40 50 60 70 80 90 Axial load in kn MGS 8

MGS MEVA Guided Screens Assembly of climbing cones Recommended method of attachment of climbing cones to the formwork Important The dimensionally accurate installation of the cones is obligatory. 90 see Fig. 9.2 Fig. 9.1 1 Fig. 9.2 2 3 4 5 4 3 6 Attachment of suspension shoe at the slab 1 2 3 4 5 6 Hex. bolt M24x60, 10.9, ISO 4017 Facing Climbing cone 15/M24 Conical sleeve Tie rod DW 15 Positioning disc 880 440 390 350 Assembly with hex. bolt M 24/60 (Fig. 9.1 and 9.2) This type of assembly should be preferred as long as the cones are always at the same position. This type of assembly guarantees the dimensionally accurate installation of the cones. 1. Screw hex. bolt through predrilled facing, Ø 25 mm, into the climbing cone. 2. Use conical sleeve to facilitate disassembly of climbing cone after stripping. 3. Screw in tie rod. 4. Mount second climbing cone and conical sleeve to the tie rod. 5. Before pouring the slab: Screw positioning disc into second cone to avoid intrusion of concrete in the thread of the cone. 6. Unscrew positioning disc before stripping, then detach forms from concrete. Fig. 9.3 Fig. 9.5 max. 250 We recommend a minimum distance of 1-2cm between shoe and slab edge. Fig. 9.4 Suspension screw M24 Provide additional attachment as lock against rotation. We recommend the installation after a MGS unit was suspended. Attachment of suspension shoe to the slab The suspension shoe is mounted to the slab by using the suspension screw M24 and an additional screw (against rotation of shoe). The projection over the slab edge should be not more than 25 cm and not less than 1-2 cm (Fig. 9.3 to 9.5). MGS 9

Dimensioning (height) of climbing cycles The height of the climbing cycles depends on the requirements of the building. To determine the height of the MGS System, three facts need to be considered: - The guiding profile should start or end approx. 30.0 cm below the ceiling. (Fig. 10.1). 30.0 cm - Always, at least two (2) storeys have to be secured by the MGS system (Fig. 10.1). - The guiding profile has to be secured by at least two (2) suspension shoes (Fig. 10.1). Fig. 10.1 MGS 10

MGS MEVA Guided Screens Assembly Fig. 11.1 Fig. 11.2 66.5 20 66.5 20 36.5 35 20 280 20 35 Pre-assembled top platform 100 Assembly area To guarantee a proper assembly an assembly area on site should be provided. Requirements of the assembly area on site: The assembly area should be clean, even and spacious (approx. 12m x 6m). The surface should be stable enough to withstand the occuring loads. The mounting trestles need to be stable enough as well (see Fig. 11.1 and 11.2) and secured against tilting and shifting. The assembly area should be protected against all weather conditions and should provide a power supply. The whole area should be in the swinging range of the crane. Guiding profile Ledger General assembly process Fig. 11.3 Step 1 Safety lock Threaded rods Timber fixture Step 1: Place guiding profiles in the centre line distance, install ledgers and attach threaded rods. Do not tighten the threaded rods, yet. Attach pre-assembled top platform. Fig. 11.4 Step 2 Pre-assembled guard railing Pre-assembled lower platforms Step 2: Install pre-assembled guard railing and lower platforms. MGS 11

Assembly General assembly process Step 3: Attach pre-cut square timber 8/14. The threaded rods (diagonal crosses) can now be tightened. Square timber 8/14 Step 4: Attach trapezoidal sheets. We recommend drilling screws (by contractor) 5.5 x 50 horizontal with a distance of 18 cm or 5.5 x 25 vertical with a distance of 30 cm at the sheet joints. Fig. 12.1 Step 3 Trapezoidal sheet Attention Crane eye For special dimensions or detailed information about dimensions please see assembly drawings which are made projectrelated. Fig. 12.2 Step 4 Such information is: Distance of guiding profiles Length and installation dimensions for threaded rods Projection of square timbers Arrangement of trapezoidal sheets Extension length of ledgers Defining attachment holes of guiding profiles for attachment of platforms Installation positions of safety locks Fig. 12.3 Square timber 8/14 for attachment of trapezoidal sheets Arrangement of trapezoidal sheets Threaded rod with turnbuckle nut Arrangement of trapezoidal sheets MGS 12

MGS MEVA Guided Screens Operating sequence Typical sequence: 1. Step: The pre-assembled MGS unit is lifted from the assembly trestles by crane and moved to the building (crane eye see Fig. 12.2). There, the unit is threaded into the suspension shoe. As soon as the guiding profile is guided through two (2) suspension shoes, the whole unit is secured by the safety locks (Fig. 13.1). The position of the safety lock was already considerd during assembly. 2. Step: On top of the slab which is now protected by the MGS, the slab formwork can be errected (Fig. 13.2) and the cones for the next cycle can be installed. Installation of cones see page MGS 9. Fig. 13.1 Fig. 13.2 MGS 13

Operating sequence 3. Step: Now the slab can be poured and (after stripping of the slab formwork) the suspension shoe can be attached (Fig. 14.1.). 4. Step: The MGS unit is picked by the crane and pulled upwards. The storey which is not any longer protected by the MGS system needs to be equipped with a guard rail system. The suspension shoes (which are no longer needed) can be removed and reused in the upper levels (Fig. 14.2). Fig. 14.1 Fig. 14.2 MGS 14

MGS MEVA Guided Screens Corner platforms There are three (3) different types of corner solutions: 1. A corner of the building in a right angle (Fig. 15.1). Side-guard post Square timber 8/14 Trapezoidal sheet Connection for side railing Support for side railing In general it should be a goal to design the platform as symmetrical as possible. Sometimes, due to the geometry of the building and the associated planning of all platform lengths, that is not possible. Fig. 15.1. shows a corner configuration which is very close to a symmetrical solution. The platform with more cantilever holds the side protection. To the side protection (Fig. 15.2-15.4) belong: Connection for side railing Side-guard post Support for side railing Fig. 15.1 Side protection Trapezoidal sheet Square timber 8/14 Timber fixture U 100 Side-guard post 100/3000 Support for side railing Arrangement of trapezoidal sheets Fig. 15.2 Elevation Fig. 15.3 Elevation complete Fig. 15.4 Section Description...Ref.-No. Side-guard post 100/3000...................29-012-80 Connection for side railing...................29-944-45 Support for side railing...................29-944-40 Suspension shoe 250/800...................29-942-60 Corner suspension shoe 250/910...................29-942-50 Flange screw 18....29-401-10 MGS 15

Corner platforms 2. A corner of the building in an obtuse angle (Fig. 16.1). Also at this angle it should be a goal to design the platforms as symmetrical as possible. Fig. 16.1 shows a solution with accessories required for the side protection. 3. A corner of the building in an acute angle (Fig. 16.2). At an acute angle it is possible that suspension shoes interfere with each other due to limited space. Fig. 16.2 shows a solution using the corner suspension shoe (Fig. 16.3). The corner suspension shoe is able to hold the MGS unit by going over the standard suspension shoe. The accessories for the side protection are equivalent to the already shown parts of the other corner ssolutions. Fig. 16.1 Side-guard post Support for side railing Square timber 8/14 Connection for side railing Support for side railing Trapezoidal sheet Square timber 8/14 Side-guard post Fig. 16.3 Corner suspension shoe Corner suspension shoe Description...Ref.-No. Side-guard post 100/3000...................29-012-80 Connection for side railing...................29-944-45 Support for side railing...................29-944-40 Suspension shoe 250/800...................29-942-60 Corner suspension shoe 250/910...................29-942-50 Fig. 16.2 MGS 16

MGS MEVA Guided Screens Notes MGS 17

Notes MGS 18