Dalhousie University Phoenix Controls Standards. Revision 04/30/2013

Similar documents
REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

SECTION LOW PRESSURE DUCTWORK

Honeywell. W7620 Zone Controller Water Source Heat Pump A. GENERAL RESIDENTIAL AND BUILDING CONTROL GUIDE SPECIFICATION FOR THE ENGINEER

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

BFS / BFSM SERIES Installation & Maintenance Manual

1.1 GENERAL RECORD DRAWING REQUIREMENTS

GUIDE SPECIFICATIONS CONTROLS SPECIFICATIONS AND CONTROL POINT DATA MAP GENERAL DESCRIPTION

Howard Smart Transformer Specification Guide

RFP # CULVER CITYBUS: BUS SIGNAL PRIORITY SYSTEMS PROJECT Response to Questions

KM-4800w. Copy/Scan Operation Manual

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

ROAM System Specification Guideline Division 16520

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

PACSystems* RX3i IC695MDL765

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

SECTION SUBMITTAL PROCEDURES

This specification describes the general requirements for Engineering Services provided to Vale.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Quick Start Instructions EMV-INspektor V2

VELTRON II Microprocessor Based Pressure & Flow Smart

Introduction to BAS Technology

3. DESIGN SPECIFICATIONS

SECTION COMMON WORK RESULTS FOR HVAC

LIFE SAFETY DIVISION GUIDELINE. Subject: BDA Radio Amplification Checklist Date initiated: Date revised:

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

APPENDIX D: DRAWING SUBMISSION STANDARDS

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

CADPIPE Industrial Pipe. Tutorial

WEB I/O. Wireless On/Off Control USER MANUAL

Design Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at

EC-CAD New features and changes The following improvements have been made to the EC-CAD Product: EC Design to Fabrication.

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

*************************************************************************************************************

Update: July 20, 2012

Image. Installation VAV-Universal Retrofit-Set. General Information. Safety notes

HLC-1000 High-limit Humidity Control

Heat Exchanger Construction Checklist

The Microstation configuration must be set up with the correct CAD resource files as outlined in SPEC

A/E REVIEW CHECKLIST HVAC

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

AC and DC solutions- Multiple AC and DC solutions available, please contact factory for your application.

theben Fan Coil Actuator FCA 1 Fan Coil Actuator FCA 1 FCA Version: Jan-08 (Subject to change) Page 1 of 77

4-20mA, 0-10V and general process measuring bargraph displays

Facility Services Subgroup Preface for Divisions 21` through 28

SECTION INTEGRATED AUTOMATION

Smart Pump VMS2310-D. Smart Pump with DeviceNet Installation & Maintenance

Commercial Infill Project Guide

2018 Design Competition Frequently Asked Questions. Q: Are teams allowed to register in more than one category of the competition?

Context-Aware Planning and Verification

1. Instrument diagnostics Interpreting the Optical Image and Diagnostic Values Prism washing... 8

Section XV - PER, Design, and Construction Submittal Requirements

Stryker BACnet VAV Wizard Configuration Guide (WEBs-N4)

SECTION BUILDING METERING (Indianapolis Campus Only)

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

Actuator ICAD 600A / ICAD 600A-TS / ICAD 1200A

Ductwork Construction Checklist

Installation and Maintenance Manual IM 770-1

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

MR Modulo Adjustable Constant Airflow Regulator

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section

WPE 48N USER MANUAL Version1.1

SAX.. ACVATIX Electromotoric actuators for valves. with a 20 mm stroke

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Digital Drawings Submittal Process

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

Metasys Integrator Power Measurement Ltd. Application

Configuration of C310 multifunction transmitters by keypad

1. State that all workmanship must conform to all pertinent laws, ordinances and regulations of all bodies having jurisdiction.

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Supplementary User Manual for BSWA Impedance Tube Measurement Systems

UNIFIED FACILITIES GUIDE SPECIFICATIONS

IMPORTANT! READ BEFORE PROCEEDING! SV Weather Caps

Fan Coil Actuator FCA 2

MARINE WIRELESS. Owner s Manual. Navigation Server MWNS11B. Marine Wireless 470 Castro Street Suite 200 Phone (415) Fax (415)

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

VA-9070 Series Electric Rotary Actuators for Two-Position and Modulating Service

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

OVEN INDUSTRIES, INC. Model 5C7-362

B. The designated coverage areas shall include both indoor and outdoor coverage.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Version 8.8 Linked Capacity Plus. Configuration Guide

SAX.. ACVATIX Electromotoric actuators for valves. with a 20 mm stroke

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

Contents. Overview Introduction...3 Capabilities...3 Operating Instructions Installation...4 Settings... 5

Metasys Zoning Package Commissioning

Week 15. Mechanical Waves

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

Actuating Terminal Equipment Controller (ATEC) Base VAV - Cooling or Heating, Application Application Note

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION

SAX.. Electromotoric actuators for valves ACVATIX. with a 20 mm stroke

Transcription:

Dalhousie University Phoenix Controls Standards Revision 04/30/2013 The system standard shall be Phoenix Celeris II. Products from past generation or future generations of Laboratory and Fume Hood control are not acceptable. Shop Drawings Hardware Phoenix Room Schedule Sheet (RSS) shall be sent to the consultant for completion/approval and maintained throughout the design and construction phase of the project. The RSS shall be turned over as As-Built at the completion of the project, with all changes integrated into the one master RSS. The RSS shall be submitted in both PDF and Excel Spreadsheet formats. Shop Drawings shall be submitted in electronic, and hard copy. Product Literature shall be submitted in electronic format only. A bill of material that references the associated product literature and exact version which is installed shall be created and form part of the Shop Drawing package. Electronic Submissions shall include one PDF file of all documents, book marked for easy navigation. Sections shall be labeled Section X Section Description that is in the Table of Contents. All supporting documents such as PDFs, Excel Spreadsheets, Word for Window documents, Auto CAD, etc. files that were used to create the single PDF file shall be provided as Supporting Documentation. The Shop Drawings shall include each Room s Laboratory Verification Table. This Table shall have the Monitor Verification Table completed when there are one or more fume hoods in the room. This table shall list all of the 23 Parameters from the X30 Fume Hood Monitor User s Guide and the specific settings installed. Server, Router and Repeater locations shall be documented on the shop drawings. Neutralizers, if supplied, shall be shown on the consultant s design drawings as well as the Phoenix shop drawings. Neutralizers shall also be listed in the RSS. Fume Hood Monitor FHM631-ENG-XXX Room Temperature sensor a decision of which Room Temperature sensor will be used is currently outstanding. Band Clamps Page 1 of 10

Vertical Air Valves Shall be provided with factory supplied flanges. No Band Clamps Horizontal Air Valves Band Clamps shall be provided at the discretion of the installing contractor. Horizontal valves shall have the ductwork on both sides supported such that the connection between the ductwork and the valve does not provide any structural support, only an air seal. Neutralizers Laboratories will be designed to maintain background noise as per the latest published ASHRAE guidelines. RC(N): QAI 5dB Criterion. It is expected that noise levels can be achieved without any neutralizers. If a neutralizer is specified the engineer must submit to the owner from review the acoustic assessment that attests to its requirement. If neutralizers are required, they shall be shown on the Engineer s ventilation detail drawings as well as the Phoenix Shop Drawings and the RSS table. No Differential Pressure Sensor shall be supplied on SUP or GEX valves. No LDU s will be provided for Vivariums, or any other space. A Metasys User Group will be created with the same information for the user. All Auxiliary Temperature Control Zones shall be via Phoenix LabFull configuration and a temperature sensor and control valve. There shall be no independent third party Temperature Control using additional controllers. In the event that Traccel valves are specified, upgrade to low speed Celeris should be considered. Macro Servers shall be installed in air louvered ventilated cabinets which have an Un- Interrupted Power Supply (UPS). In retrofit applications, unless the Engineer can demonstrate that the existing or retrofitted system can accommodate Medium pressure Air Valves, Low Pressure Air Valves shall be provided. All cabinets shall be labeled and correspond to the Shop Drawings Page 2 of 10

All power circuits shall be documented on the As-Built drawings. Switchable Rooms will be changed via the BMS and available within the user s specific User Group Fume Hood Monitor Calibration Parameter Setup (Hood Monitor to be setup in Imperial Units) Number Name Standard Comment 1 FHM Mode Depends on type Must be documented 2 Step 1 Display 00001 ft/min Parameter and Unit of Measure 2 Step 2 Display Yes Display is active. Parameter and Unit of Measure 3 Flow Scale 200 CFM/V Factor 4 Standard Face 100 ft/min Velocity Set Point 5 Leakage Area Determined on site Must be documented. Hood Type dependent 6 Fixed Sash Determined on site Must be documented Dimension 7 Minimum Hood Flow Determined by the Engineer Based on Engineer s Spec. Must be documented. 8 Maximum Hood Flow See comment Based on 12 inches of Sash Opening. Hood must have a sash stop at 12 inches 9 Minimum Sash S-cl Must be documented Opening 10 Maximum Sash S-oP Must be documented. Should be no Opening 11 Face Velocity Display Offset Adjustment Determined on site Page 3 of 10 greater than 12 inches Must be documented 12 Setback % 60% If a Zone Presence Sensor Exists 13 Minimum Setback Clamp No Non Applicable unless a Variable Speed Drive type hood. 14 Sash Opening opal Set at 14 inches of opening Alarm 15 Broken Sash Py_o Threshold 16 Sash Fully Py_c Closed 17 Beeper Volume Hi

Number Name Standard Comment 18 Emergency Yes Mutable 19 Mute Duration 5 20 Auto Mute 0 21 Drive Application N/A Non Applicable unless a Variable Speed Drive type hood. Offset and Gain 22 Fume Hood FAcE Decommission 23 Energy Waste Alert No Disable Fume Hood Sash Sensors Sash sensors shall be mechanically attached to the hood. No tapes or adhesives are permitted. Sash sensors shall be mounted outside of the fume hood so as to avoid corrosion to its potentiometer. The fume hood control manufacturer shall provide the sash sensor's mounting bracket, if necessary. Micro Server vs. Macro Server There shall be no Micro Servers installed. All Phoenix Laboratory and Fume Hood Control components shall be connected to the nearest Macro Server. The choice of which Macro Server to connect to will confirmed in writing with the University, in advance of connection. Each building shall have a unique database on its Macro Server. A Username and Password that provides all capabilities for the Macro Server shall be provided to the University. The IP Address & MAC Address & Subnet Mask for the Macro Server shall be identified on the Network Drawing. The Macro Server location shall be documented on the Network Drawing. Macro Servers will use DHCP. Air Valve Setup Valve Minimum shall always be the factory valve minimum not the Hood Minimum. This is so that the decommission mode can work/add value. All rooms shall be configured to have Occupied and Un-Occupied Modes, Minimums and Maximums. The Engineer shall establish these and provide them in an Excel Page 4 of 10

spreadsheet. Simply provided in AutoCAD is not acceptable. If a room is not to have different volumes for Occupied vs Un-Occupied the values for both modes shall be identical. Set Primary Temperature Control to 'Use BMS Set Points' rather than 'Use These Set Points' OptiNet/Air Quality Interface This interface shall always be hard wired. A network dependent solution is not acceptable. Engineering Units The Engineering Units to be used shall be as follows: BAS Integration Hood Monitor = Imperial Elsewhere = Metric Temperature = Deg C Flow = Liters/Sec Face Velocity = FPM (Feet per Minute) The following points will be integrated into Metasys: Fume Hood Sash Open Percent % Face Velocity Set Point ft/min Face Velocity ft/min Valve Flow Feedback l/s Valve Flow Command l/s User State Broken Sash Cable Hood Override Flow Alarm Jam Alarm Page 5 of 10

Example Graphic: Laboratory As per the graphic below plus the follow added to the graphic: Indoor Air Quality Bias Lab offset 0 100% OptiNet into Phoenix l/s Vivarium As per the graphic below plus the follow added to the graphic: Indoor Air Quality Bias Lab offset 0 100% OptiNet into Phoenix l/s Page 6 of 10

The following Lab and Fume Hood points will be trended in Metasys. Trend interval shall be 15 minutes. Trends will be set up to archive automatically to the ADX server.: Fume Hood Sash Open Percent % Face Velocity Set Point ft/min Face Velocity ft/min Valve Flow Feedback l/s Valve Flow Command l/s User State Broken Sash Cable Hood Override Flow Alarm Jam Alarm Laboratory All the points in the following graphic plus Indoor Air Quality Bias: Page 7 of 10

Vivarium All the points in the following graphic: Naming Convention Server Naming Server devices that that require an IP address will be named in using the building code, an equipment specific name and a consecutive numbering scheme campus wide (ie. Number does not restart with each building). Building codes will be provided by the Dalhousie Project Manager. The IP address shall be obtained using the Network Registration Form which will be provided by Johnson Controls. This form is to be submitted to FMIT by Johnson Controls through the Dalhousie Project Manager. Page 8 of 10

Naming Phoenix points shall be named using the full location and equipment reference as described below: [Building Name].RM-[Room # Location].[Equipment Type].[Point Description] Phoenix System examples using the DOS Building Main Lab Controller Names: Point Names: Instance Numbers: DOS.RM-135.MAV-1 (Makeup Air Valve 1 serving Room 135 in DOS Building) DOS.RM-135.GEX-1 (General Exhaust Air Valve 1 serving Room 135 in DOS Building) DOS.RM-135.FH-1 (Fumehood 1 serving Room 135 in DOS Building) DOS.RM-135.MAV-1.SA-F (DOS Building, Room 135, Makeup Air Supply Air Flow) DOS.RM-135.FM-1.JAM-ALM (DOS Building, Room 135, Fumehood 1 Jam Alarm) Instance numbers for all equipment shall be coordinated through the Johnson Controls project team. The vendor will supply the count of instance numbers required and Johnson Controls will supply a block of values to apply to that particular project. Page 9 of 10

Phoenix objects shall use instance numbers in the range of 100,000 through 199,000. Page 10 of 10