PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Similar documents
AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

2017 UPDATED INSTALLATION INSTRUCTIONS

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

PVC Composite Railing & Stair Kit

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

Clearview Railing System Installation Instructions

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

ATLANTIS RAIL Contact Information

WOOD POST FD POST. Installation Guide FD POST MOUNT STAIR / ANGLE RAILING LAG STAIR / ANGLE RAILING STUD CABLE RAILING FITTINGS

Installing AZEK Evolutions Rail

Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

TREX TRANSCEND RAILING

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

IDR assembly instructions:

Face Mount to Through-the-Post Mount

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

Installation Instructions for. Before You Begin TOOLS REQUIRED

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Rockwell 4-in-1 Sliding Door

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

TREX REVEAL RAILING Installation Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Box Track INSTALLATION INSTRUCTIONS

RAILING R A IL ING 51

Kit 102 Series Installation Instructions for Wood or Metal Posts on Level Runs

Two Panel Frameless Bypass Door

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

POST INSTALL INSTRUCTIONS

Ford Pick Up Rear leaf Spring Kit Installation Instructions

MAG-CONV Basic, 48, 48R & Midline Front Mount

T A P N T W I S T INSTALLATION GUIDE

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

The following instructions will guide you through the installation of your new vinyl railing.

TREX SELECT RAILING Installation Instructions

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

Horizontal Cable Systems

Regency Railing. Rail Installation Instructions

Continuous Handrail Kit Installation Instructions

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

A Step-by-Step How To Guide

1. TOOLS + MATERIALS REQUIRED

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Horizontal Cable Systems

TREX SELECT RAILING. Installation Instructions PARTS

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Open Up Your View With CABLE SYSTEMS

MobileTrak5 Installation Instructions

Pillar Hanger ASSEMBLY INSTRUCTIONS

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Frameless Inline Door With Return QCI5263

Assembly Instructions 10 X 10 Aluminum Frame Building

General Array Layout Sketch

Installation Instructions for. Handrail Component System

TWIG Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Assembly Instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

Roll In W/L Dock PAGE 1

Installation Instructions

Installation Instructions

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Stag Hanger ASSEMBLY INSTRUCTIONS

TREX POST MOUNT DECKING AND CONCRETE

T r e x Art i s a n Se r i e s Railing

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

TITAN2-EDGE Public Access Computer Station Dual Track

PREPARATION & TOOL CHECK LIST

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Cellar Hanger ASSEMBLY INSTRUCTIONS

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

Mounting the 6 or 12 Indexer on PRS Gantry Tools

Big Block Installation Manual For Systems without A/C

Pickup Box Utility Rack Package Installation (Instruction ID: )

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

Heavy-Duty Bypass Track System

Dublin Stalls Installation Instructions

Sea Doo Spark Engine Access Kit

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Frameless Inline Door QCI5248

Hammer. Loctite 242 Blue. April 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Contour Hanger ASSEMBLY INSTRUCTIONS

Oxford Stalls Installation Instructions

Transcription:

175 SERIES FIXED STAIR CABLE RAIL - INSTALLATION INSTRUCTIONS PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: FIXED STAIR TOP RAIL (1) A FIXED STAIR BOTTOM RAIL (1) B D UPPER SADDLE BRACKET (1) C BRACKET COVERS (2) G ADHESIVE TAB SHEET(1) LOWER SADDLE BRACKET(1) D E UPPER BOTTOM BRACKET (1) LOWER BOTTOM BRACKET (1) #10X1-1/2 SELF DRILLING SCREW(12) H I H 10 SUPPORT BLOCK (1) F 3-1/2 DRIVER BIT (1) 175 SERIES AFCO-RAIL FIXED STAIR CABLE RAIL J K H ANGLE BALUSTER CONNECTOR (2) PRE-DRILLED FIXED CABLE BALUSTER (1) L M

INSTALLATION INSTRUCTIONS CONTINUED PAGE 2 FIXED CABLE RAIL INSTALLTION NOTES & TIPS POST INSTALLATION: This instruction will provide information to properly locate and position posts to be used with the 175 Series Fixed Stair Cable Rail. Additional information regarding the mounting and properly securing the post to the decking can be found in detail in the instructions that are packaged with each post. It is recommended to review the Post Installation Instruction to ensure the decking and or mounting surface is adequate to properly install and secure posts. Upon review and determining the structure and mounting surface for the posts are adequate, proceed using this instruction to install the 175 Series Fixed Stair Cable Rail. FOR A SUCCESSFUL INSTALLATION: Read the instructions completely before beginning the installation. Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete with desired post locations. Check local building codes to ensure compliance. Check carton(s) to determine part count is complete. After cutting rails, balusters, or posts, paint exposed metal for maximum protection against the elements. Installation is best accomplished with two people. Wear personal protection equipment; safety glasses, etc. Use care not to over-torque the screws. Pre-drilling is recommended. Provided hardware to install AFCO-Rail is for use with Aluminum AFCO-Rail posts. If installing to other surfaces the installer must acquire the appropriate hardware as needed for proper installation. TOOLS REQUIRED:FOR INSTALLATION: Drill bits: 5/32" (.156) / 1/4 (.250) 9/32 (.281) / 29/64 (.453) 1/8 hex wrench 7/16 wrench Drill (with adjustable clutch, recommended) Miter Saw (with metal cutting blade) Level Rubber mallet NOTES: Cables and Fittings for this rail system are sold separately. 36 height rail uses 9 cables. 42 height rail uses 11 cables Posts are sold and packaged separately. An AFCO-Tool is recommended to simplify the locating, pre-drilling and installation of brackets and locating of the cables. Tape measure Cable cutters Grinder with cutoff wheel and or hacksaw Touch-up paint

INSTALLATION INSTRUCTIONS LOCATING CONTINUED AND MOUNTING POSTS: PAGE 3 1. Start by placing the pre-drilled line post on a flat surface. Measure from the center of the uppermost hole 3-1/8 upward towards the top of the post and make a reference mark. This will be the location of the Upper Saddle Bracket (C). 3-1/8 2. From that reference mark in step 1 measure down towards the base of the post 31 for 36 height rail, and measure down 37 for 42 height rail. Place another reference mark on the same side of the post. 3. Place upper post in the desired position with reference marks facing towards the stairs. Lay the Bottom Rail (B) on the stair-nosing from top to bottom, and adjacent to the post. Align the lower reference mark from step 2 with the top edge of the bottom rail. (Post can be mounted with reference line higher than the top of the bottom rail if desired) Post should not be mounted with reference mark below the top side of the bottom rail. Note : When installing posts on treated decking use the provided ACQ pad that is included between the post base and the treated surface. 4. With Bottom Rail (B) still laying on the stair-nosing, position the lowest undrilled post where desired on the stairs. Measure up from the top side of the Bottom Rail (B), on the upper side of the post and ensure there is a minimum of 34 for the 36 rail height and a minimum of 40 for the 42 rail height, to the top of the post. If position of posts meets this criteria, measure up from the top side of the Bottom Rail and place a mark on the post at 31 for the 36 height rail, and 37 For the 42 height rail.

INSTALLATION INSTRUCTIONS CONTINUED PAGE 4 5. If the criteria are met in both steps 3 & 4, secure posts in place with the appropriate fasteners. Refer to page 1 of the post installation instruction details that are included with each post, regarding the proper fastening and securing of posts to the decking. Note: Do not install base trim at this time. 6. Place Bottom Rail (B), with baluster connector facing up and centered between the posts, on the stair-nosing from top to bottom, adjacent to the posts, mark a line on the rail from the inside of each post. 7. Place the Top Rail (A) with the bottom side of the rail facing up next to the Bottom Rail (B), and duplicate the marks from the bottom rail cut line onto the top rail. Now mark the top rail 5/8 shorter on each end; this is the cut line for top rail. 5/8 8. Install base trim over posts to cover bottom flange and mounting bolts of the installed posts. 9. On the lowest undrilled post where you placed a reference mark at 31 or 37, (in step 4) measure down 3-1/8 and place mark at the center of the post. Transfer this mark also to the opposite side of the post. On both sides of the post where the reference marks were placed drill a hole using a 5/32 (.156) drill bit. Note: Optional AFCO-Tool will aid in centering and drilling this hole.

INSTALLATION INSTRUCTIONS CONTINUED PAGE 5 10. Using the Installation Tool, align the holes drilled in step 9 with the top cable hole on the tool, locate the lower cable hole on the tool and drill holes down the post on opposite sides, repeating for the required amount of cables being installed using the Installation Tool for correct spacing. Note: If not using the Installation Tool for hole spacing, drill holes for cable with 3-1/16 spacing center to center. Note: There are 9 holes to drill for the 36 height rail. There are 11 holes to drill for the 42 height rail. 11. If installing an intermediate post on stair treads, locate post in desired position and ensure the minimum clearance to the top of the post is achieved from the top side of the Bottom Rail (B) to the top of the post the same as in step 4. Note: Minimum of 34 to top of post for 36 rail height and 40 to top of post for 42 rail height. 12. Mark the hole locations to drill the intermediate post, by temporarily installing a cable in the top holes, from the upper post through to the lowest post in the drilled holes with cable laying adjacent to the intermediate post. Mark the upper and lower side of the post at the locations on the intermediate post where they intersect the cable. Note: Only intermediate posts will have holes drilled at an angle for cable to pass through. Post on the top and bottom of the stairs will have holes drilled straight through both walls. 13. Transfer marks from step 12 to both the upper and lower side of the intermediate post. Drill a pilot hole using a (5/32) drill bit in the center of the post at those marks. Using the Installation Tool, align the hole drilled with the top cable hole on the tool, locate the lower cable hole on the tool and drill holes down the post on opposite sides for the required amount of cables being installed. Once pilot holes are drilled, or marked, drill out each hole to a 1/4 diameter. Note: Optional AFCO-Tool will aid in centering and drilling these pilot holes. 14. From the center of the top hole drilled, on both sides of the post, measure up 3-1/8 and place a mark across the post. Align Screw holes in the Upper and Lower Saddle Brackets (C&D) on the marked lines on the posts. Make sure the brackets are centered on the posts. Mark the screw hole locations with a pencil.

INSTALLATION INSTRUCTIONS CONTINUED PAGE 6 15. Attach saddle brackets (C&D) with 1-1/2" self-drilling screws (H) at the marked screw locations. Note: Pre-drilling with a 5/32 drill bit is recommended The Optional AFCO-Tool will also aid in locating the screws by using the Site Hole centered over the reference mark and use the Fixed Stair holes to mark and or pre-drill holes. 16. Install support block connector(s) (L) using 1-1/2 self-drilling screw (H) to the underside of bottom rail (B) at the desired location. Note: One support block, cut from support block material (K), is recommended for rails measuring 72 in length or less; two support blocks for longer lengths. If one support block is required, install support block connector (L) at center point of bottom rail (B). If two support blocks are required, install support block connectors (L) equal distance from each end of the bottom rail (B). 17. Slide Bracket Covers (G) onto Top Rail (A) 3 to 4 inward, as well as the Upper and Lower Bottom Brackets (E & F) with counter-bore holes down and towards the center of the rail. Bottom Brackets may require installing with holes up for accessibility. Note: A small piece of tape may be needed to hold covers and bottom brackets on rail while installing the rail kit. 18. Assemble Top and Bottom Rail (A&B ) with pre-drilled Fixed Cable Baluster (M), Place assembled rails between post with top rail resting in the Top Saddle Brackets (C&D). Top Rail Bo om Rail 19. At the point where you installed the support block connectors (step 16), carefully measure the distance from the underside of the bottom rail (B) to the stair tread. Cut support block material (K) to fit. Slip support block over support block connectors (L). Slide the rail back into place and make certain the rail is plumb. Note: Top cut of the support block that attaches to rail will be typically cut at 34 degrees. Cut according to plan layout for correct stair angle.

INSTALLATION INSTRUCTIONS CONTINUED PAGE 7 20. Apply adhesive tab (J) to flat surface of Top Rail (A) near the posts. Slide Bracket Cover (G) to interlock with the flange on the saddle Brackets (C & D). 21. Screw self-drilling screws (H) into the Top Rail (A) from the underside of each Saddle Bracket (C&D) through the provided locating hole to securely fasten the rail. Slide the Upper and Lower Bottom Brackets (E & F) against the post and secure with self-drilling screws (H). Note: Screw holes in bottom brackets are angled to make mounting easier. Bottom Brackets may need to be inverted to allow for better accessibility. CABLE INSTALLATION 1. Drill out and enlarge the holes in the outermost wall only of the first post of your cable run with a 9/32 drill bit through the holes already in the post for the treaded cable end. Lower Post Also drill the outermost wall only on the opposite end of the cable run with a 29/64 drill bit. This step is to allow the line cable fittings to be installed. NOTE: If continuing from a Level cable run down stairs, the Upper Stair Post will not require additional drilling. 2. Remove cable and fittings from packages and install the required washer and brass nut on the threaded stud end of the cables, and feed the bare ends of the cable through all posts and support balusters and drilled Intermediate Posts (if used), starting at the holes drilled out to 9/32.

INSTALLATION INSTRUCTIONS CONTINUED PAGE 8 3. Slide line fittings with required round black washers onto the cables while twisting in a clockwise motion until the fittings are fully seated in the end post. Pull the bare ends to remove as much slack as possible. 4. Use a small block of wood and a mallet to tap the cable at the point the cable is coming out of post to set the cable angle. 5. Return to the treaded stud end of the cables and starting with the centermost cable, insert a 1/8 hex wrench into the end of the treaded stud. Tighten the locknut with a 7/16 wrench while holding the hex wrench to prevent the cable from turning. 6. It is recommended that you follow the sequence of tensioning the cables starting at the center and alternating above and below until all cables are properly tensioned. After cables have been tensioned follow step 6 to set the cable angle again if needed, and re-tension cables as necessary in the same sequence. 1 2 4 6 8 3 5 7 9 7. When all cables are tight, cut off the cable ends running through the fitting and any exposed stud threads near the locknut as close as possible using a cut-off wheel or hacksaw. Press the nut cap over the locknut. Press the cap onto the fitting. AFCO INDUSTRIES, INC., 3400 ROY AVE., ALEXANDRIA, LA 71307 AFCO Form AR22 Rev. 4/2018 For more information, contact Customer Service at 1-800-599-9912 or visit our website at www.afco-ind.com.