SET SHEETS- ARCHITECTURAL THIS ONE 33 SALMON FARM ROAD FRANKLIN ME THIS IS A 24 X 36 SHEET.

Similar documents
The Cottage Beach Design

RemoteTeller SYSTEM - RTS VAT 21 GX CUSTOMER UNIT COMPONENTS CUSTOM DESIGNED CUSTOMER AREA

PURCHASING DEPARTMENT

670 Freestyle/Style Door with In-Line Panel

Sample Plan RETAINING WALL DETAILS NARRATIVE. Sample Plan RETAINING WALL DETAILS CHECKLIST

5'-7 3/4" AFI 1'-11" BEDROOM 2 AFI AFI CLOSURE PANEL ABOVE *NOTE: ELEVATOR PIT MUST BE A FULL 8" DEEP GAME ROOM CARPET T-2 2'-0"

Johnson Fine Arts Center

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

NORTH STAR 4-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

Series Door with In-Line Panel (GIH / AHD)

A '-4" 10'-10" 16'-6" 7'-0" 23'-0" 10 3/4" 9'-6" 5 1/4" 2'-11 1/2" 2'-6" 3'-2 3/4" 3'-1" 4'-8 3/4" 2'-5 3/4" 2'-6" 7'-2" R.O. HD 7'-3" R.O.

BUILDING OVERHANG (6'-0") STREET TREES IN 5X5 PLANTER BEDS ALONG E GRAND PLANTER BEDS

Radiant systems 0801EN March 2016 Radiant plasterboard ceiling and/or floor system ISO /7

ASSEMBLY INSTRUCTIONS

B R A D F O R D V E T E R A N S V I L L A G E

FOR DEVICES SOLD PRIOR TO

Remove (E) carpet, underlying flooring material, and all remaining glue residues. E Consultant 29'-2" VIF

LIST OF ARCHITECTURE PLANS

* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

REQUEST FOR PROPOSALS ADDENDUM

TUR DOORS SHOWER DOORS

A0.0 TENANT IMPROVEMENTS FOR FACILICARE AND RENOVATIONS AND LUCKY SAVANNAH

General Instructions 03HEL1010DDFW-V3. Please retain product label and instructions for future reference. 10x10 Helios Summer House

* * 98/9949 CS 98/ Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

THE CHANDLERY. image area: a PISANI + ASSOCIATES ARCHITECTS. 270 Dorchester Avenue South Boston, Massachusetts

ARK CHEVRON INSTALLATION GUIDE

SECTION 4 - REINFORCED CONCRETE MASONRY UNITS (CMU)

Ultimate Push Button Astragal Prehanger Installation Instructions

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2017 REVISIONS

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

The College of New Jersey T-Dubs Dining Hall Renovation October 29, For Construction

Version (See back cover)

Multi-Point Astragal Prehanger Installation Instructions

Version (See back cover)

EDUCATION GRADE 12 JUNE EXAMINATION 2013 UMLAZI / ILEMBE / UGU ENGINEERING GRAPHICS AND DESIGN PAPER 1 MANUFACTURING ENGINEERING & TECHNOLOGY

PANEL FASTENERS. Fairfield Metal 9 Audrey Place, Fairfield, NJ Phone: VAPOR BARRIER (BY FM) NOMINAL SHIM

SOUTH HAVEN FISHING PLATFORM AND BANK STABILIZATION DNR #

* TURNING SPACE ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * TURNING SPACE ** RAMP

Project: NEW CONCESSIONS/ TOILET BUILDINGS FOR FLOMATON HIGH SCHOOL FOR THE ESCAMBIA COUNTY BOARD OF EDUCATION BREWTON, ALABAMA

ET 51 EXTERIOR ROOF DRIP SIDE FINISH MOULDING INSTALLATION

A000 GENERAL INFORMATION C000 CIVIL

Version (See back cover)

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

Whole House Fan. WHF 1500, GF 1500, WHF 3000 Installation Instructions. Parts List * Required Tools:

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:

INVESTOR LANDSCAPE: SQLA INC 380 N. PALM ST. SUITE B BREA, CA

DESIGN DRAWING INDEX PROJECT INFO. WEATHERBY / PIPER MCKEE GROUP x 136

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

METAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH

NOTE THAT THE HANDLE IS BELOW THE LOCK BASE

HOMES BY NOVARE DEVELOPMENT

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Ultimate Flip Lever Astragal Prehanger Installation Instructions

Pro-Master Ridge Vent Enabling Attic Air to Exit. Moist, Hot Attic Air. Cool, Fresh Air Enters Through Soffit Vents

WYOMING CLEAN WATER PLANT

IPA FITTINGS FOR REHAU NORDIC DESIGN A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Ultimate Trilennium Astragal Prehanger Installation Instructions

Water Street Apartments

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse

Floor Area Ratio. Note: Handicap parking is provided in accordance with ADA standards. SITE DATA FIRE LANE STRIPING FIRE HYDRANT PARKING COUNT

120.28' PLANTER AC PAVING ' COMMERCIAL BUILDING 4,100 SF / R-1 SPD 3333 I STREET APN: LANDSCAPE ' 4' WIDE CITY SIDEWALK

LEXUS IS250/IS350 FRONT SPOILER Section I - Installation Preparation. Part Number: Section I - Installation Preparation.

24 X32 3 CAR GARAGE POLE BARN STYLE FRAME

EAUZONE PLUS EPH - HINGED DOOR WITH HINGE PANEL FOR RECESS

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH "H" HOLDER ARMS

IPA FITTINGS FOR VEKA DANLINE 70 A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

IPA FITTINGS FOR ALUPLAST NORD-LINE A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

EAUZONE PLUS EPQ - QUINTESSE DESIGN WITH HINGED DOOR

S.R. 32 AT GRADE CROSSING

CABLE-RAIL A B B C C PARTS LIST DESCRIPTION SECTION C-C DIMENSION UNITS. Displayed: Millimeters Vista. 1:20 ASSEMBLY DRAWING Cable Railing

A Women's Restroom North Scale: 3/8" = 1'-0" 113 Women's Restroom South Scale: 3/8" = 1'-0" Keyed Notes Scale: NTS. 108 Men's Restroom North

846-GP. Neo-Angle Enclosure. Technical Assistance is available Monday - Friday 8:00 a.m. - 5:00 p.m. (Central Time) GP 12/05

PENINSULA - TYPE 1 3/8"=1'-0" ADA PENINSULA - TYPE 3 3/8"=1'-0" PENINSULA - TYPE 2 3/8"=1'-0" VANITY TYPES - NOTES 3/8"=1'-0"

463-GP. Swing Door. Technical Assistance is available Monday - Friday, 8:00 a.m. - 5:00 p.m. (Central Time) (Toll Free) 463-GP 5/06

TP Series - Triple PV Top of Pole Solar LED Lighting System

Fitting & User Instructions

CONTURA Rocker Switches

Incremental encoders Solid shaft with clamping or synchro flange pulses per revolution

Particular Specification for Furniture (Total of 11 pages, not including this page)

POOLPAK R-410A MPK SERIES

NOTE: UNLESS OTHERWISE SPECIFIED. 1. SEE SHIPPING INSTRUCTIONS FOR FINAL PACKAGING

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

IIHS LATCH Measurement Tool Set Drawings REV1. iihs.org

DO NOT SCALE DRAWING TITLE: AWNING INSTL 100-SERIES

NOTE: UNLESS OTHERWISE SPECIFIED. 1. SEE SHIPPING INSTRUCTIONS FOR FINAL PACKAGING

NOTE: UNLESS OTHERWISE SPECIFIED. 1. SEE SHIPPING INSTRUCTIONS FOR FINAL PACKAGING

WETROOM WALK-IN AWL1500 AWL1200 AWL900 AWC850

4. Current Standard Plans including Transmittal Letters are available on the web at:

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

Translate and Classify Conic Sections

STANDARD CONSTRUCTION DETAILS PAVING REVISED -MAY 2017 DEPARTMENT OF ENGINEERING

1st FLOOR FURNITURE PLAN

MATKI ONE MOWP - WETROOM PANEL & BRACE BAR MOWV - WETROOM PANEL & CEILING BAR

Material List for Log Complete Packages

GENERAL NOTES: G1. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION. G2. DUCT SIZES SHOWN ARE ACTUAL INSIDE DIMENSIONS.

063-GP. Swing Door with In-Line Panel

* * 98/9949WDC. 1-Point Latch (LBL) 2-Point Latch includes these additional parts. Customer Service

Specialty Equipment Schedule. Provided By. Connection Size (LxWxH) Comments

Transcription:

07..58 COVER RT SET SHEETS- GENERL NUMER DTE TITLE SHEET GENERL NOTES EXISTING RES SET SHEETS- RCHITECTURL THIS ONE NUMER SLMON FRM ROD FRNKLIN ME 0-0 -0-00 -700-70 NME DTE DEMOLITION PLN ROOF PLN REFLECTED CEILING PLN ELEVTIONS EXTERIOR DETILS TTIC DETILS SET SHEETS- STRUCTURL S- S- S- NME DTE ROOF FRMING PLN SECTIONS ND DETILS SECTIONS ND DETILS PROJECT TEM NUMER ROOF RENOVTION G-000 G-00 G-00 NME GOOGLE ERTH IMGE " = '-0" PROJECT LOCTION " = '-0" THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt STRUCTURL ENGINEER: ECKER STRUCTURL ENGINEERS 75 YORK STREET PORTLND ME 00 CONTCT: ETHN RHILE, P.E 07.87.88 EXT 0 //08 :7:5 PM RCHITECT: SELNDER RCHITECTS 7 MIN STREET SUITE C ELLSWORTH ME 005 CONTCT: MIKE SELNDER, I 07--58 CLIENT: UNIVERSITY OF MINE 575 SERVICE UILDING ROOM 7 ORONO ME 0 CONTCT: RT OTTIE 07.5.787 7 JN 08 " = '-0" TITLE SHEET G-000

Key Value SPECIFIED COMPONENTS LEGEND Keynote Text 0 00. CONCRETE 0 00 00. SHIM 0 0 00. DIM. LUM. 0 00. OS.5 0 00.H PLY, /" 07 00. FI. INSUL. 07 00.D.0 PCF SPRY FOM 07 5 00. 07 00. MTL ROOF PNEL 07 00. INS. MTL PNEL 07 00. LINER PNEL 07 00.5 EXT FSCI 07 00. EXT SOFFIT 07 00. SHT METL ROOF 07 00. RIDGE CP 07 00. ZEE VENT 07 00. FLSHING 07 00. ROOF FLSHING 07 00.E RECEIVER 07 00.E CLET 07 5 00. FLEX. FLSHING 07 7 00. 07 7 00.D 07 7 00.E OOT 07 7 00.E CLMPING RING 07 00. SELNT 08 7 00.C HINGE 0.C HT CHNNEL 0 00. 00. DWV 8 00. CONDENSING UNIT 00. LIGHTNING ROD THIS LIST INCLUDES IDENTIFIED COMPONENTS THT RE EXISTING ND PRT OF THE WORK. CONTINUOUS FRMING. DISCONTINUOUS FRMING/LOCKING. ERTH OR NTIVE FILL. POROUS FILL. WOOD SND OR GYPSUM CONCRETE PLYWOOD MSONRY PROJECT MTERILS GLSS OR PLSTIC FERROUS METL NON-FERROUS METL RIGID INSULTION Material: Description # SPF PCF SPF F. INSUL. GLSS GW MTL ROOF OS SHT MTL, PTD. STL. STL. NEW COMPONENTS SHOWN LCK (E) COMPONENTS SHOWN GRY. NEW/EXISTING DETIL GRPHICS LOOSE OR TT INSULTION /" = '-0" ST. STL XX.50 METL SHPES NOTED Y MTERIL ND SHPE OR THICKNESS. SHPE/GUGE NOTING /" = '-0" 0 NOTE TG WLL TG X0 X0 / X0 EXISTING TO REMIN. EXISTING TO REMOVE. DEMOLITION WLL GRPHICS ' - 5/" ' - " CLR I-MS CN- NEW WLLS EXISTING WLLS CENTERLINES USE DOT. FCES USE DIGONL. CLER DIMENSION. DIMENSIONS RE TO FCE OF WLL FINISH UNLESS NOTED. UILDING SECTION WLL SECTION ELEVTION IR RRIER (LIGNING LINE, ) CENTERLINE (CENTER LINE) EXTENT OF WORK (DSH DOT DOT /8" 0-MINUTE (DSH, 7) 0-MINUTE (DSH DOT, 7 0-MINUTE (DSH DOT DOT, 7) MESURED DISTNCE (DOT /", CLER SPCE (DOT, ) SC 5' - 0" T5 IRCH /" = '-0" NEW CONSTRUCTION WLL GRPHICS /" = '-0" DIMENSION NOTES /" = '-0" VIEW ES /" = '-0" SPECIL LINE STYLES /" = '-0" ROOF TG CEILING TG MTERIL TG FLOOR TG 8 KEYNOTE DETIL TG REVITION MENING (E) EXISTING (N) NEW (P) PROTECT (R) REMOVE (S) SLVGE CX PLYWOOD GRDE CX DJ DJUSTLE FF OVE FINISH FLOOR HU IR HNDLING UNIT.O... OTTOM OF LDG UILDING S* CKING SYSTEM, SEE DETILS. C.L CENTERLINE CDX PLYWOOD GRDE CDX CLG CEILING CLO CLOSET CLR CLER CMP COMPOSITE METL PNEL CMU CONCRETE MSONRY UNIT CONC CONCRETE CONT CONTINUOUS CP* CRPET CPT* CRPET TILE CT* CERMIC TILE CTR CENTER CTSK COUNTERSINK DT DT OUTLET DL DOULE DIST DISTNCE DUP DUPLEX CONVENIENCE OUTLET EIFS EXTERIOR INSULTION ND FINISH SYSTEM EJ EXPNSION JOINT EP* EXTERIOR PINT EPDM ETHYLENE PROPYLENE DIENE MONOMER EQ EQUL ERU ENERGY RECOVERY UNIT F.O... FCE OF F FIRE LRM FD FLOOR DRIN FDN FOUNDTION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CINET FIN FINISH FLR FLOOR FSW FLOWING SE WTER FTG FOOTING FTR FIN TU RDITOR FU FURNCE UNIT G GUGE GLV GLVNIZED G* GR R GFI GROUND FULT INTERRUPT GSM GLVNIZED SHEET METL GW GYPSUM WLL ORD H HOSE I HDWD HRDWOOD HM HOLLOW METL HR HOUR HR HOUR IC INTERNTIONL UILDING CODE ID INSIDE DIMETER IF(O) INSIDE FCE (OF) IP* INTERIOR PINT JN. JNITOR JOX JUNCTION OX JT JOINT LVL LMINTED VENEER LUMER M/E/P MECHNICL/ELECTRICL/PLUMING MX MXIMUM M* MRKER ORD MDF MEDIUM DENSITY FIERORD MIN MINIMUM MIN MINUTE MJ MOVEMENT JOINT MTD MOUNTED NFP NTIONL FIRE PROTECTION SSOCITION O OVERLL OC ON CENTER OD OUTSIDE DIMETER OF(O) OUTSIDE FCE (OF) OFCI OWNER FURNISHED CONTRCTOR INSTLLED OFOI OWNER FURNISHED OWNER INSTLLED OH OPPOSITE HND PEN PENETRTION PERP PERPENDICULR PL* PLSTIC LMINTE PLY PLYWOOD PM POWER MONUMENT PMD PLUG MOLD PS* PROJECTION SCREEN PSL PRLLEL STRND LUMER QCO QUD CONVENIENCE OUTLET R.O ROUGH OPENING R RUER SE RD ROOF DRIN RF* RESINOUS FLOOR RFT* RESILIENT FLOOR TILE RJ* REVEL JOINT RS* RESILIENT SHEET RS* ROOM SIGN RWL RIN WTER LEDER SC-* SUSPENDED CEILING SD SHOWER DRIN SIM SIMILR SPLIT SPLIT DT/PHONE JCK ST STL STINLESS STEEL T.O... TOP OF T* TCK ORD TEL TELEPHONE TGM* TEMPERED GLSS MIRROR TPO THERMOPLSTIC POLYOLEFIN TT TERRZZO TILE ICL UON UNLESS OTHERWISE NOTED UV UNIT VENTILTOR WF* WOOD FLOORING WO WHERE OCCURS WRC WESTERN RED CEDR WS* WORK SURFCE WT* WINDOW TRETMENT. SEE DDITIONL REVITIONS ON ELECTRICL, STRUCTURL ND MECHNICL DRWINGS. REVITIONS ENDING IN * INDICTE SCHEDULED ITEMS, SUCH S INTERIOR PINT (IP, IP...). SEE CSEWORK ES FOR CSEWORK NOMENCLTURE. SEE WLL ES FOR WLL NOMENCLTURE 07..58 ROOF RENOVTION 7 JN 08 GENERL NOTES //08 :7: PM 5-F-8 E MRK. SSEMLY NMING " = '-0" MTERIL GRPHICS /" = '-0" 5 LEDER ES /" = '-0" 7 REVITIONS " = '-0" G-00 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

C D E F 0M PUMP RM. SF 0X ELEC RM. 85 SF G H 05 WENING 5 SF I J K L 07 ROTIFER 7 SF 0 RTEMI 5 SF M N 0 ENTRY 8 SF EGG 57 SF O P Q R S T U V W 07..58 0 FISH RM. 550 SF 05 FIRST FEEDING SF LGE SF 7C CORRIDOR 57 SF YOLKSC 8 SF 0 FIRST FEEDING 05 SF ROOD STOCK 50 SF ROOD STOCK 5 SF RESERVOIRS SF C CORRIDOR SF EGG SF 5W THROOM SF DN ENTRY 8 SF DN EXISTING UILDING KEY PLN /" = '-0" C D E F G H I J K L M N O P Q R S T U V W 8' - 5 /" ' - 0" 80' - 0" LIGHTNING ROD ROOF RENOVTION 7 JN 08 //08 :7:7 PM EXISTING ROOF -0 /" = '-0" EXISTING RES G-00 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

. MINTIN UILDING SERVICES DURING CONSTRUCTION, INCLUDING ND DUCT EXHUST FUNCTIONS. 0.000 07..58 DEMOLITION NOTES " = '-0" MTL ROOF PNEL MTL ROOF PNEL OS 5/8" ROOF FLSHING KEYED DEMOLITION NOTES KEY DESCRIPTION CONCRETE (R) SOFFIT (R) OVERHNG FRMING (R) LIGHTNING PROTECTION 5 (R) METL ROOF ND OS SHETHING (R) FSCI METL 8 PROTECT MECHNICL UNITS (R).0 EXT SOFFIT EXT FSCI CONCRETE ICL EXISTING SOFFITS " = '-0" EXISTING GLE END /" = '-0" C D E F G H I J K L M N O P Q R S T U V W 8 5 ROOF RENOVTION 7 JN 08 //08 :7: PM DEMOLITION PLN DECK REMOVL -0 /" = '-0" -0 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

0 ROOFS LL Type Mark RE Description SR 7 SF SINGLE SKIN METL T5 SF SPF/FIERGLSS INSULTION Grand total: 8 SF 0.000 07..58 SR ROOF ' - /" T5 TOW ' - 0" EXTEND VENT FROM CEILING ELOW THROUGH ROOF, ICL OF FIVE LOCTIONS ON SOUTH SIDE OF UILDING ND TWO LOCTIONS ON NORTH SIDE. PENETRTE ROOF MXIMUM FOUR FEET FROM RIDGE. VENT LOCTIONS ON PLN RE PPROXIMTE. VENT EXTENSIONS /8" = '-0" C D E F G H I J / K L M N O P Q R -700 S T U V W -700 / -700 7-700 5-700 -700-700 / ROOF RENOVTION 7 JN 08 //08 :7:0 PM / -0 ROOF PLN /" = '-0" ROOF PLN -0 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

07..58 CEILING KEYED NOTES Site note Description PROTECTED MECHNICL UNITS PROVIDE NEW GRILLES NOTCH SOFFIT T S. PROVIDE ESCUTCHEONS (R) VENT PENETRTION 5 5'-" SOFFIT. 5 VENTED PNELS PRLLEL TO UILDING '-5" SOFFIT. VENTED PNELS PRLLEL TO UILDING 7 0-INCH SOFFIT. VENTED PNEL PRLLEL TO UILDING 8 TTIC INSULTION (E) CURVED WNING ND SOFFIT OVE REMINS 0 NEW VENT ND PENETRTION C D E F G H 7 I J K L M N O P Q 8 0 0 0 0 0 0 0 R S T 5 U V W ROOF RENOVTION 7 7 JN 08 //08 :7:0 PM TTIC REFLECTED CEILING -0 /" = '-0" REFLECTED CEILING PLN THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt -00

C D E F G H I J K L M N O P Q R S T U V W 07..58 UILDING SOUTH -0 /" = '-0" W V U T S R Q P O N M L K J I H G F E D C CONDENSING UNIT UILDING NORTH -0 /" = '-0" 7 JN 08 //08 :7: PM ROOF RENOVTION ELEVTIONS UILDING WEST -0 /" = '-0" UILDING EST -0 /" = '-0" THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

DIM. LUM. HT CHNNEL SHIM /" SHT METL ROOF OS.5 RECEIVER ROOF FLSHING PROVIDE S T PENETRTIONS ND OVE DOORS S SHOWN ON ROOF PLN. LENGTH T PENETRTIONS: THREE PNEL SEMS (0 INCHES) LENGTH OVE DOORS: TWO PNEL SEMS PST OPENING. MTL ROOF PNEL NEW MTL ROOF PNEL OS.5 07..58 FLSHING CENTER VENTED PNEL(S) IN SOFFIT RE. PROVIDE UNVENTED PNELS T EDGES. FLSHING EXT SOFFIT PRLLEL SOFFIT PNEL T FSCI -0 " = '-0" RKE T EVE -0 " = '-0" TTCHMENT -0 " = '-0" ROOF SSEMLY " = '-0" 0" 0" SELNT CLMPING RING SHT METL ROOF OOT SELNT RIDGE CP " OS.5 SHT METL ROOF ZEE VENT MTL ROOF PNEL OS.5 ROOF FLSHING.0.0 RECEIVER RELOCTE TO CENTER OF SHT. MTL. PNEL. SELNT DWV FIELD NOTCH ZEE CLOSURES. SET ZEE IN UTYL TPE. SEL ROUND REMINING EDGES. OS.5 PENETRTION FLSHING -0 " = '-0" 7-0 RIDGE VENT " = '-0" -0 GLE END " = '-0" 5 FLSHING FLSHING ' - 0" RUN OVE ND ELOW EXT. FSCI. CLET SELNT SHT METL ROOF FLSHING T RKE " = '-0" MTL ROOF PNEL CLET SELNT MTL ROOF PNEL FLSHING ELOW " = '-0" 0 " MTL ROOF PNEL OS 5/8" DIM. LUM. FLSHING FLSHING OVE -0 " = '-0" CONCRETE DWV SPF X TRUSS FIT THROUGH TIGHT-FITTING HOLE CENTERED IN X PENETRTION NCHORING /" = '-0" 8 ROOF RENOVTION EXT FSCI RECEIVER FLSHING DIM. LUM. HT CHNNEL SHIM EXT SOFFIT DIM. LUM. HT CHNNEL SHIM EXT SOFFIT /" DIM. LUM. HT CHNNEL SHIM 7 JN 08 //08 :7: PM FLSHING EXT SOFFIT EXTERIOR DETILS SLIDING EVE T DRIP EDGE " = '-0" 5 SOFFIT PNEL T RKE FSCI " = '-0" SOFFIT PNEL T CONCRETE WLL " = '-0" SOFFIT PNEL JOINT " = '-0" -700 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

' - " ' - " HINGE /" /" ' - 0" ' - " " FI. INSUL..0 PCF SPRY FOM INS. MTL PNEL 07..58-70 DIM. LUM. I-DL T5 PLY, /" NIL PLYWOOD TO FRMING WITH 8D GLV. NILS INCHES ON CENTER. DIM. LUM. PLY, /" (E) TRUSS PROVIDE MINIMUM R-8 FIERGLSS INSULTION, MINIMUM SETTLED THICKNESS 5 INCHES. TOW ' - 0" PLYWOOD DOOR T HINGE " = '-0" -70 CTWLK /" = '-0" TTIC INSULTION /" = '-0" ICL TTIC DOOR -70 /" = '-0" 5 TTIC NOTES " = '-0" WORK ON THIS SHEET IS PRT OF DD LTERNTE. REMOVE LOWN CELLULOSE INSULTION. REMOVE (E) CTWLK X. SEL PENETRTIONS THROUGH EXISTING CEILING LINER PNEL. PROVIDE INSULTION S SHOWN. PROVIDE CTWLK. PROVIDE PLYWOOD DOORS. DOOR PNEL: /-INCH CX. DOOR FRME: X # SPF. HINGES: NTIONL 8 TEE HINGE, TWO PER DOOR. LTCHES: NTIONL V5 SWINGING DOOR LTCH. / / 00 005 7' - " -70 00 00 00 5/ -70 00 I-DL / ROOF RENOVTION (E) SHER WLL, ICL OF. (E) DRFTSTOP WLL, ICL OF 5. DN 7 JN 08 //08 :7: PM / TTIC DETILS -0 TTIC /" = '-0" -70 THIS IS X SHEET. \\llspark\public\current\75 Roof\uilding\.rvt

C D E F G H I J K L M N O P Q R S T U V W '-5 /" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" '-0" EXIST SHER WLL/ DRFT STOPPING WLL ( PLCS) 0'-0" 07..58 80'-0" GIRDER TRUSSES @ '-0" O.C. CONDITION 5 T ENDWLLS () CONDITION 5 T ENDWLLS () 0'-0" MECHNICL UNIT (). SEE CONDITION FOR REINFORCING T OPNG (). EXISTING ROOF TRUSSES @ " O.C. CONDITION THIS RE () REF REF EXIST x8 TRUSS TOP CHORD NOTE: HEEL CONDITION VRIES NEW x8 SISTERED TO EXISTING WHERE INDICTED ON PLN NEW x8 () 0d NILS @ " O.C. x8 JOINTS T PNEL POINTS S SHOWN 80'-0" 80'-0" EXISTING ROOF FRMING PLN /"='-0" NOTES:. CONTRCTOR VERIFY LL DIMENSIONS IN FIELD.. CONDITIONS & RE TO E FIELD LOCTED. SE ID TRUSS TOP CHORD REINFORCING SHOWN- SEE PLN FOR LOCTION PROVIDE DD/DEDUCT UNIT PRICING PER LINER FOOT FOR TRUSS TOP CHORD REINFORCING TRUSS PROFILE ""(ICL TRUSS) /" = '-0" EXISTING TRUSS RCING LOCTION () EXISTING TRUSS RCING LOCTION REF REF GENERL NOTES: SE ID: REINFORCE TRUSS TOP CHORDS WITH NEW x8 SEE TRUSS ELEVTION "" ELOW ND NOTES.. TRUSS TOP CHORD REINFORCING IS PRT OF SE ID- PROVIDE DD/DEDUCT UNIT PRICING PER LINER FOOT FOR TRUSS TOP CHORD REINFORCING. THE WORK DEPICTING ON STRUCTURL DRWINGS S THOUGH S [CONDITIONS THORUGH 5] RE PRT OF DD LTERNTE. PROVIDE DD/DEDUCT PRICING (E INSTNCE) FOR ECH CONDITION.. THE FOLLOWING NOTES RE INTENDED TO E USED S OUTLINE SPECIFICTIONS FOR THIS PROJECT. THE REFERENCED STNDRDS RE PRT OF THIS WORK.. LL DIMENSIONS, EXISTING CONDITIONS, ND S-UILT CONDITIONS MUST E VERIFIED IN THE FIELD. NY DISCREPNCIES SHLL E ROUGHT TO THE TTENTION OF THE STRUCTURL ENGINEER EFORE PROCEEDING WITH THE EFFECTED PRT OF THE WORK. 5. THE STRUCTURE IS DESIGNED TO E SELF SUPPORTING ND STLE ONLY FTER THE STRUCTURL WORK CONTINED IN THE STRUCTURL DRWINGS IS COMPLETED. IT IS THE CONTRCTOR'S SOLE RESPONSIILITY TO DETERMINE ERECTION PROCEDURES ND SEQUENCE TO ENSURE THE SFETY OF THE UILDING ND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE DDITION OF NECESSRY SHORING, SHEETING, TEMPORRY RCING, GUYS OR TIEDOWNS. SUCH MTERIL SHLL REMIN THE PROPERTY OF THE CONTRCTOR FTER COMPLETION OF THE PROJECT.. SECTIONS ND DETILS SHOWN ON NY STRUCTURL DRWINGS SHLL E CONSIDERED ICL FOR SIMILR CONDITIONS S DETERMINED Y THE STRUCTURL ENGINEER. THE STRUCTURL ENGINEER RESERVES THE RIGHT TO INTERPRET DETILS TO DDRESS OTHER PROJECT CONDITIONS. WOOD FRMING NOTES:. LUMER TO CONFORM TO THE NTION DESIGN SPECIFICTION FOR WOOD CONSTRUCTION (NDS). EDITION S REFERENCED Y THE INTERNTIONL UILDING CODE.. DIMENSIONL LUMER: No. GRDE OR ETTER SPRUCE-PINE-FIR (SPF OR SPF-S). ROOF TRUSS RCING REPIRS /7/8 /5/08 5:07:7 PM ROOF FRMING PLN NOTE: HEEL CONDITION VRIES TRUSS PROFILE "" /" = '-0" S THIS IS X SHEET. C:\Users\ethan\Documents\0 R8_erhilebse.rvt

S S 07..58 DD NEW x8 TRIMMER E SIDE OF EXISTING OPENING S CONDITION : MISSING TRIMMERS T ROOF PENETRTIONS. ESTIMTED NUMER OF CONDITIONS 8 (V.I.F.) PRT OF DD LTERNTE NUMER PROVIDE NEW RCING WHERE RCING HS EEN REMOVED CONDITION : CUT HORIZONTL TRUSS RCING. ESTIMTED NUMER OF CONDITIONS: 7 (V.I.F.) PROVIDE NEW DIGONL RCING IN ECH OF WE PLNES, OTH SIDES OF EXISTING SHERWLL '-0" (V.I.F.) PRT OF DD LTERNTE NUMER CONDITION : TRUSS RCING OUT OF PLNE/DISCONTINUOUS. ESTIMTED NUMER OF CONDITIONS: (V.I.F.) [8 NEW DIGONLS TOTL] (CONDITION MIRRORS SHER WLL ND RIDGE) x8 E.S. EXIST OPENING SIMPSON LU8 E END OF NEW x8's INSTLLED W/0dx /" NILS EXIST x8 TRUSS TOP CHORD SECTION DETIL /" = '-0" S /" = '-0" S EXIST TRUSS WES EXIST Y WITH CUT RCING NEW x RCE DJCENT TO EXISTING. NIL W/()d NILS E WE, LP MIN WE MEMERS E SIDE OF CUT RCING. EXIST TRUSS WES () NEW x DIGONL (0)0d NILS, NEW DIGONL TO LOCK () PRT OF DD LTERNTE NUMER NEW x LOCK TWN TRUSSES ()d NILS T E WE INTERSECTION (0)0d NILS, EXIST HORIZONTL MEMER TO TRUSS () SECTION /" = '-0" S ROOF SHETHING SIMPSON HG0KT, E END OF LOCK, INSTLLED W/SIMPSON SDS /"x /" SCREWS NEW x LOCK TWN TRUSSES & TIGHT TO SHETHING EXIST RCING HORIZONTL /5/08 5:07: PM ROOF TRUSS RCING REPIRS /7/8 SECTIONS & DETILS S THIS IS X SHEET. C:\Users\ethan\Documents\0 R8_erhilebse.rvt

S 07..58 EXIST SINGLE LPPED TRUSS WE RCING S CONDITION : SINGLE LPPED TRUSS RCING. ESTIMTED NUMER OF CONDITIONS: (V.I.F.) WHERE EXIST CLIPS RE PROVIDED, NO NEW CONNECTION REQUIRED. PRT OF DD LTERNTE NUMER S NEW x W/()d NILS, LP MIN ONE TRUSS TO E SIDE OF SPLICE EXIST HORIZ RCING, WITH SINGLE LP SPLICE EXIST TRUSS WES DETIL /" = '-0" S CONDITION 5: TRUSS RCING TERMINTING T CONCRETE SNDWICH PNEL WLLS WITHOUT CONNECTION. ESTIMTED NUMER OF CONDITIONS: 5 (V.I.F.) PRT OF DD LTERNTE NUMER EXIST TRUSS RCING MEMER ()SIMPSON /"x /" SDS SCREWS NEW L5x /x/x0'-5" LONG W/5/"Ø HOLES FOR NCHORS " " DETIL /" = '-0" S /" ()/"Øx /" TP CON SCREWS, " CENTER TO CENTER /5/08 5:07: PM ROOF TRUSS RCING REPIRS /7/8 SECTIONS & DETILS THIS IS X SHEET. C:\Users\ethan\Documents\0 R8_erhilebse.rvt S