Installation of AF-Neutral Section Insulators. 01/07/ Installation of AF Neutral Section

Similar documents
INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

INSTALLATION RECOMMENDATIONS For The Con-Tech ODYSSEY Line Voltage Flexible Track System

C 0.05" ALLEN WRENCH. Installation Instructions for Cirrus Channel Suspension T1 with 4" Square or Round Canopy. Section One: Adjusting Cable Position

DO35 MAINTENANCE INSTRUCTIONS

Session: Introduction to PPE and T&P

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

Introduction to PPE and T&P

WARNING!! DO NOT LIFT DOORS UP WHEN THE HOOD IS OPEN. THE DOORS WILL HIT THE HOOD!

Clearview Railing System Installation Instructions

Installation Instructions for Cirrus Suspension Downlight with Power - End Feed. Section One: 4" Flush Canopy Version

Eraser Conveyor Belt Cleaning System IWARNING Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and con

Stanley Hand tools Stanley FatMax push-lock adjustable joint pliers. 3 piece Stanley FatMax pushlock. Stanley FatMax groove joint pliers.

TorqueMaster Replacement Spring

earth fault loop/pscc meter

Installation Instructions

Ohbot. Eyes turn. servo. Eyelids open. servo. Head tilt. servo Eyes tilt. servo. Mouth open servo. Head turn servo

TRACK TYPE DISCLAIMER. THESE INSTRUCTIONS ARE INTENDED FOR PROFESSIONAL GARAGE DOOR INSTALLERS and only apply to the fittings

Anti-Chattering Retrofit Assembly

AUGMENT THE WEIGHT STACK SELECTION PRO SELECTION PRO MED INSTALLATION MANUAL

MODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS

NOTE: The 1-piece panel is required for installation (the face mounts to the panel).

108 - CEILING HUNG RINGS

T-FITTINGS INSTALLATION INSTRUCTIONS

JSP60617 KIA EXPRESS SERVICE TOOL KIT

ClampStar Safe-T-Link Tether Installation Instructions for Deadends

ELECTRIC TOOL CORPORATION

Introduction To Automotive Technology

Rugged Ridge 2 Receiver Hitch Kit (J21068)

ABM International, Inc. Navigator Assembly Manual

Quick Set Dovetail Jig

MOR/ryde Steer Axle Suspension System

Electrical Construction Name:

1. Layout. Step 1. Step 2. Step 3. Fig. 1

STRAIGHT HANDLEBAR KIT

ASSEMBLY AND CARE INSTRUCTIONS CEILING HUNG RINGS 108

Part 7 Assembling the X axis

Installing CNC Stepper Motor Mounts On A Sherline Mill

A500 ASSEMBLY & INSTALLATION INSTRUCTIONS

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

SERVICE ADVISORY SA-11

ROOFSAFE ANCHOR & CABLE

These Installation Instructions are valid for antennas in the following version:

HANDLEBAR KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS TOOLS REQUIRED. Instr Rev Page 1 of 6

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

REC Series Rack Installation Guide

OX CNC. Mechanical Assembly Instructions. S.A. Brown & Maker Store

Product #: Product #:

Quick Hoops Seedling and Micro Green Bench Instruction Manual

Formula Suspension Fork RCC INSTALLATION AND ASSEMBLY INSTRUCTIONS

TO INSTALL SIDE PLATE:

Front axle components, overview

WARNING. BX Ford Explorer With Adaptive Cruise Control & Eco Boost Installation Instructions

INSTALLATION INSTRUCTIONS CHAIN-LINK FENCE AND GATE

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Custom Pendant- Hardwire Assembly and Installation Instructions

SwingSafe Swing-Away Mailbox Support Diagram

WARNING Kia Spectra 5 Installation Instructions BX2713. Serial Number

THIS KIT INCLUDES: 8 M8-1.25X40MM BOLTS WITH WASHERS 8 M8-1.25X30MM BOLTS WITH WASHERS RIGHT AND LEFT HINGE

BUILD YOUR OWN. Pack 22

Installation Instructions for OPGW Bolted Dead End

Work Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A332

TABLE OF CONTENTS DRAWINGS

2009 Acura TL Installation Instructions

Installation Instructions for Vista Air Vertically Folding Walls

STRENGTH Aligned teeth provide superior gripping power over standard vertical teeth. STRENGTH Diamond serrated jaws provide a firm grip

ASSEMBLY AND ADJUSTMENT

Replacing the build plate clamps

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A335

F5513 APOGEE 30"DIA 3LTS PENDANT INSTALLATION INSTRUCTIONS WARNING

Mainz Product Catalogue

Diva Acoustical Ceiling

Hullavator Gas Spring Replacement (simplified)

121PB - PRO UNEVEN BARS

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

Chapter 6. General-Purpose Tools and Equipment, Service Information

Tools for Plumbing. Introduction

CMA-455 Suspended Ceiling-Tile Reinforcing Kit

Retractable Tongue Kit Model MPG457 Instructions

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

Installation instructions, accessories. TV receiver, digital

TWL 1500 TORQUE WRENCH LOADER

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

Maintenance Information

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

MICC Ltd Unit 21 Sedling Road Wear East Industrial Estate Washington Tyne & Wear NE38 9BZ Tel: +44 (0)

Printrbot Simple (Model 1403) Rev F Printrboard

Connecting the Channel A

Installation Guide. Overview

INSTRUCTIONS FOR HIT LOCK MORTISER

Tools Needed Hardware Provided (per shade) Hardware Needed

Independent Containment System (ICS)

MTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2

Professional Pliers. Quality to Depend on

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

NATIONAL CERTIFICATE (VOCATIONAL) ENGINEERING TECHNOLOGY NQF LEVEL 2 NOVEMBER 2010

INSTALL INSTRUCTIONS: FRAME REPAIR KIT

Transcription:

Installation of AF-Neutral Section Insulators page 1

Installation of HS25 Section Insulator Flury-Adjustment JIG with complete tools item no 655.900.001 page 2

Neutral Section 25 kv AC Neutral Section page 3

Installation Instruction for each type of SI / NS Each box of SI / NS contains 1 Installation Instructions Installation training by AF instructor Download Installation Instruction on www.aflury.ch page 4

page 5

Installation 1. Check completeness of NS-Parts 2. Prepare your tools 3. Define installation location 4. Prepare the contact and messenger wire 5. Measure the average high of contact wire and the Hogging factor 6. Installation of messenger wire insulator 7. Place Neutral Section Insulator body 8. Cut contact wire 9. Adjustment of NS height, level and suspension 10. Install skids (parallel to track, with Jig) 11. Controll everything page 6

Controll complettness of Parts Controll your neutral section parts according to the list of parts page 7

Tools for Installation Make sure you got all nessesary tools for the installation 1 Ring spanner 16/17 mm 1 Torque wrench 17 mm (50 Nm) 1 Adjusting JIG FLURY 1 Spirit level (FLURY Art. no 655.141.000) 1 Metal cutter (+ possibly 1 metal cutting saw) 1 Copper hammer approx. 2 kg 1 Flat nose pliers or universal pliers 1 Straightening wood 1 Measuring scale Additionally for: - Cut-in the messenger wire insulator - Replace of a used neutral section insulator 1 Pulley block with 2 cable sockets (mounting dead end) page 8

Preparation of contact and messenger wire Straighten the contact wire at the installation location and make sure it is not twisted! Place the contact wire and the messenger wire in the middle of the track (+/- 50 mm). Contact wire and the messenger wire must be positioned vertically above each other. page 9

Location As a standard for phase breakers a pylon should be placed in the middle of the system. PYLON page 10

Installation Instruction Installation direction Installation direction Turn to adjust Place the JIG with red side to the installation direction. Adjust the spirit level for the red side. Turn the JIG 180 and place the JIG with yellow side to the installation direction. Adjust the spirit level for the yellow side. page 11

Negative Presag (Hogging) of the NS Install with negative presag: A + B + X 2 A X B page 12

Installation without Hogging page 13

Impacts on Runners page 14

Impacts on Runners page 15

Installation with Hogging page 16

Negative Presag (Hogging) of the NS Measure the high of the contact wire at the guide arm clamps before (A) and after (B) the installation location. A B page 17

Negative Presag (Hogging) of the NS Calculate the average value: A + B 2 A B page 18

Negative Presag (Hogging) of the NS Measure the hogging factor X X page 19

Determination of Hogging Use a spring balance and pull the contact wire with 120 N - 150 N to measure hogging factor (x). page 20

Determination of Hogging 120-150N page 21

Negative Presag (Hogging) of the NS Install with negative presag: A + B + X 2 A X B page 22

page 23

General Layout item description pcs. 1 Phase break 1 2 messenger wire insulator 2 3 hanger 4 4 hanger 4 5 saddle clamp 2 6 forked collar socket 4 page 24

Installation Instruction Install the messenger wire insulator with saddle clamp and cable hangers page 25

Installation Instruction page 26

intermediate result READY page 27

Installation Instruction Mount Section Insulator onto contact wire without runners. Adjust position according to general layout drawing. page 28

Installation Instruction WARNING! The teeth of the contact wire clamps must grip over the full length! page 29

1. Installation Mount Section Insulator onto contact wire without runners. First tighten all bolts of the contact wire clamp with 50 Nm by using a tourque wrench and retighten 3 times 2. Mount counternuts and block with 50 Nm page 30

Installation Cut contact wire Bend contact wire ends up 30-45 page 31

intermediate result READY page 32

Installation Mount the Adjustment JIG fix center Turn 90 page 33

Installation Suspend the section insulator and adjust hogging Hogging (A+B/2)+X If not known x = 70 mm Adjust height of registration arm as well! page 34

Installation Adjust precisely with turnbuckles in respect to the spirit level on the JIG page 35

Installation page 36

Installation Turn the JIG 180 and do the same adjustment with the JIG in yellow Turn 90 center fix page 37

Installation Suspend the section insulator and adjust hogging Hogging (A+B/2)+X If not known x = 70 mm Adjust height of registration arm as well! page 38

Installation Adjust precisely with turnbuckles in respect to the spirit level on the JIG page 39

Installation page 40

Installation Mount Runner on the left side Keep contact page 41

Installation Tighten the nuts with 50 Nm page 42

Installation Clip at Skid-Entrance Step 1: tighten the nut (green) with 50Nm Step 2: tighten the nut (purple) with 50Nm page 43

Installation Install and tighten the strengthening rods with 50 Nm Block with 20 Nm page 44

Installation page 45

Installation Mount Runner on the right side Keep contact page 46

Installation Tighten the nuts with 50 Nm page 47

Installation Clip at Skid-Entrance Step 1: tighten the nut (green) with 50Nm Step 2: tighten the nut (purple) with 50Nm page 48

Installation Install and tighten the strengthening rods with 50 Nm Block with 20 Nm page 49

Installation page 50

intermediate result READY page 51

Controll page 52

Earthing Phase 1 Phase 2 page 53

Installation and Design Recommendations Each neutral section insulator should be well centred and aligned parallel to the track. page 54

Most important points for NS Installation Skids in parallel to the track Hogging page 55

Last Point page 56

page 57

Maintenance Instruction page 58

Maintenance Instruction page 59

Maintenance Instruction page 60

Maintenance Instruction page 61

Maintenance Instruction page 62

The End Thank you for your attention page 63