MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Similar documents
MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

American Electrical Institute

Article 250 Grounding & Bonding

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

NEC 2014 Code Changes

ECET Fall 2017 Name: _ Lab Assignment #01

Journeyman's Practice Exam

Electrical Wiring: Commercial, Seventh Canadian Edition

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

Continued from Part 1 Rules 1 25.

Wisconsin Contractors Institute Continuing Education

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

Article 225: Outside Branch Circuits And Feeders

Department of Labor and Industry Electrical Licensing

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

CONTINUING EDUC ATION

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

12.6 Delta Phase versus Line Current

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm.

Code Check Electrical is a field guide to common code issues in residential

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Wiring of the Main Distribution Panelboard

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

2014 NEC Changes Part 1

We have 3 ways to help you prepare

Short-Circuit Current Calculations

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

Three Phase Transformers

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

POWER SERVICE DETAILS

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

CHAPTER 2 Wiring and Protection. Article 200 Use and Identification of Grounded Conductors

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST

HPS Universal BUCK-BOOST TRANSFORMERS

2017 NEC TABLE OF CONTENTS

Quality Control Checklist - Design Drawings

UNITY/I TM. Installation Manual. UT3K, UT4K, UT5K and UT8K. Single-Phase Uninterruptible Power Systems

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Electrical Inspectors

Note: The let-through of the protective device must be equal to or less than the short-circuit current rating of the component being protected.

Grounding and Bonding of Service Equipment

UNION COUNTY ENGINEER DIVISION OF BUILDING REGULATIONS

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only*

3Ø Short-Circuit Calculations

Short Circuit Current Calculations

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

INTRODUCTION...xiii Author s Comments...xiii Exam Preparation...xiii Difficult Concepts...xiv Textbook Errors and Corrections...xv Internet...

SECTION PANELBOARDS

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

Bulletin Voltage drop in single dwelling units Rule 8-102

SECTION BUILDING WIRE AND CABLE

Calculating AC Line Voltage Drop for S230 Microinverters with Engage Cables

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

Bulletin Filming in Minnesota

Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables

Bulletin Voltage drop in single dwelling units Rule 8-102

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

ELPT 1429 RESIDENTIAL WIRING

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220

Datawave Magnetic Synthesizer

Description & Applications Questions & Answers Selection Charts Single Phase Selection Charts Three Phase...

Grounding and Bonding

Grounding Recommendations for On Site Power Systems

WAVEFORM CORRECTOR (WAVEFORM CORRECTORS) REPLACES SURGE PROTECTION DEVICES (SPD) PREVIOUSLY KNOWN AS (TVSS)

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

Basic Information Required for Photovoltaic Plan Check Submittal *Informational Purposes Only* 2013 CEC

Page Electric Utility Service Specifications

Article 700: Emergency Systems. 2.! Audible and visual signal devices shall be provided, where practicable to indicate.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Energy Management Service

BUCK-BOOST TRANSFORMERS

Calculating AC Line Voltage Rise for IQ-Series Micros with Q Cable

The Variable Threshold Neutral Isolator (VTNI)

Chapter 25. Lighting Plans

Box Fill. We have learned how to fill or NOT overfill a conduit. We must also determine how to fill boxes and conduit bodies.

Electrical Occupations

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

SIMpull THHN, it slips and slides - all with NoLube.

Technical Assignment #2 Electrical Existing Conditions Report

RESIDENTIAL SOLAR ROOF TOP EXPEDITED PERMITTING GUIDELINE. 10 KW OR LESS

INTELLIMETER REGISTER

THHN12STGN500 THHN 12 STR Green 500

Licensed Electricians Practical Assessment (LEP)

Customer Requirements RF Antenna Installations

THHN2BK2500 THHN 2 STR Black 2500

EPG. by Chris C. Kleronomos

CP /240-MC4 User Manual

Liebert Datawave GUIDE SPECIFICATIONS kva Magnetic Synthesizer Power Conditioning System

Descriptions RoHS Compatible; Applicable Standard ASTM B3, ASTM B8, ASTM B787, Federal Specification A-A-59544, NFPA 70, NEMA WC-70

SECTION DISTRIBUTION SWITCHBOARDS

THHN6WH500 THHN 6 STR White 500. Features Conductor Size Current Rating 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C)

Transcription:

MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection at the generator, and it s feeding a trough. Off this trough I am feeding two 200 Amp disconnecting means. 1) How do is size the conductors to the trough? 2) How do I size the conductors to my disconnects? See 445.13 and 19. 445.19 (2) first of all allows a generator to feed individual enclosures tapped from a single feeder for load separation and distribution. 1) 445.13 says if those feeder conductors to the trough don t have overcurrent protection ahead of them, they shall be sized to carry 115% of the generator nameplate current rating. 2) We would then size the conductors to the disconnects per the appropriate tap rule found in 240.21 and load calculations per article 220. 2. Is a disconnect required within sight of a range hood controller? Yes No - Maybe. 422.31 & 422.32 Exception & 422.34 (D). If the motor is 1/8 hp or less and 300 VA or less; the answer is no. (422.31(A)) If the motor is over 1/8 hp and there is no unit switch, then yes, there must be a disconnect within sight of the controller. (422.32) If the motor is over 1/8 hp and there is a unit switch, then the disconnect is permitted to be out of sight from the controller. (422.31(B) & 422.34(A-D)) NOTE: A unit switch(es) with a marked-off position that is a part of an appliance and disconnects all ungrounded conductors shall be permitted as the disconnecting means required by this article where other means for disconnection are provided in occupancies specified in 422.34(A) through (D).

Page 2 of 6 3. I have a lug that is attached to the meter can (not to the neutral bar which is also attached to the can). Am I allowed to attach the grounding electrode conductor to this lug. (see attached picture) No. 200.2(B) states The continuity of a grounded conductor shall not depend on a connection to a metallic enclosure, raceway, or cable armor. 4. In a 120/240-volt 3-phase, 4 wire, delta-connected panelboard, are straight voltage rated 2-pole breakers (240-volts) required only when one pole is connected to the high leg ( B phase); and are slash-rated 2-pole breakers (120/240-volts) permitted where connected to the A & C phases? See 240.85 that states, A circuit breaker with a straight voltage rating, such as 240V or 480V, shall be permitted to be applied in a circuit in which the nominal voltage between any two conductors does not exceed the circuit breaker s voltage rating. A circuit breaker with a slash rating, such as 120/240V shall be permitted to be applied in a solidly grounded circuit where the nominal voltage of any conductor to ground does not exceed the lower of the two values of the circuit breaker s voltage rating and the nominal voltage between any two conductors does not exceed the higher value of the circuit breaker s voltage rating. Therefore, a 240-volt circuit breaker can be connected between any two phases of a 120/240-volt, 3-phase panelboard supplied by a 120/240-volt delta 3-phase system. A 120/240-volt rated circuit breaker may service 120-volt line-to-ground circuits and/or 240-volt line-to-line circuits. A slash rated 120/240-volt circuit breaker may not be applied on a 208-volt line-to-ground circuit. There is no NEC prohibition in connecting a 2-pole, 120/240-volt rated circuit breaker between A and B or between B and C phases where the nominal voltage of any conductor to ground does not exceed the lower of the two values of the circuit breaker s voltage rating and the nominal voltage between any two conductors does not exceed the higher value of the circuit breaker s voltage rating. The UL panelboard marking guide states, Some circuit breakers, like single-pole breakers for use with handle ties rated 120/240 colts, should not be connected to the phase that is 20-volts to ground. Also the UL panelboard marking guide goes on to state, Generally, the B-phase is used only in conjunction with either the A- or C- phase for a 240 single-phase branch circuit or with both the A- and C-phase for a three-phase branch circuit. Circuit breakers or cartridge fuses rated for straight 240 volt systems are suitable for this use.

Page 3 of 6 5. Is a bonding jumper required around a water meter when the grounding electrode conductor is connected to the street side of the water meter? Maybe, see 250.53(D)(1) that states, Continuity of the grounding path or the bonding connection to interior piping shall not rely on water meters or filtering devices and similar equipment. If the street side of the meter has a metal water pipe that is in direct contact with the earth for 3.0 m (10 ft) or more and the grounding electrode conductor is connected to that pipe on the street side of a water meter, then that pipe is adequate as a metal underground water pipe electrode per 250.52(A)(1). However, the interior portion of the metallic water piping system on the house side of the water meter cannot benefit from that sole connection on the street side of the water meter, therefore either a bonding jumper needs to be installed around the water meter to provide continuity of the metal water piping system or a separate bonding conductor per 250.104(A) will be required to be installed to the interior water piping system that is on the house side of the water meter. See 250.104(A)(1) that states, Metal water piping system(s) installed in or attached to a building or structure shall be bonded to the service equipment enclosure, the grounded conductor at the service, the grounding electrode conductor where of sufficient size, or to the one or more grounding electrodes used. The bonding jumper(s) shall be sized in accordance with Table 250.66 except as permitted in 250.104(A)(2) and (A)(3). 6. Is the 10 AWG DC grounded conductor of a PV system required to have a white outer finish or can it being re-indentified? In accordance with 200.6(A), grounded conductors that are smaller than 6 AWG and used in PV source circuits are permitted to be marked at the time of installation with a white marking at all terminations. Also see 200.6(A)(2) that states A single-conductor, sunlight-resistant, outdoor-rated cable used as a grounded conductor in photovoltaic power systems as permitted by 690.31 shall be identified at the time of installation by distinctive white marking at all terminations. See also 200.6(B) and 690.13.

Page 4 of 6 7. I have a 5000 amp feeder with 12 parallel runs of 600 kcmil THHN copper ungrounded conductors installed in 12-4" PVC conduits. What is the minimum size copper equipment grounding conductor required in each conduit? 600 kcmil or 700 kcmil? For a 5000 ampere overcurrent device Table 250.122 shows a 700 kcmil. While this might seem to qualify for the allowance in 250.122(A) where the EGC is not required to be larger than the phase conductor, it does not apply to these conductors that are in parallel. This EGC sizing requirement is in place because the majority of the ground fault current could be supplied by all the phase conductors but be returned to ground by only one EGC. 8. Can you explain why the DC conductors for PV systems are sized by multiplying 125% twice? Section 690.8(A) requires the photovoltaic source circuit maximum current to be the sum of parallel module rated short circuit currents multiplied by 125% (these are maximum short circuit currents). Section 690.8(B)(1) requires the dc circuit conductors and any overcurrent protective devices to be sized to carry the maximum short circuit currents figured at 125% in 690.8(A) plus an additional 125% for continuous use or a total of 156%. This 156% will ensure the conductors are large enough to handle both normal current plus the additional fault current at the point of fault from both the array at the fault site and any that are in parallel with the array. 690.8(B)(2) Overcurrent protection for photovoltaic output circuits with devices that will internally limit the amount of current from the photovoltaic output circuits (for example, where fuses are built into the system) are permitted to be rated less than 156%. These overcurrent protective devices can be rated at least at 125% of the limited current value. The conductors must still be rated at 156%. 690. 8(D) Where a single overcurrent device is used to protect a set of two or more parallel connected module circuits, the ampacity of each of the module interconnection conductors shall not be less than the sum of the rating of the single fuse plus 125% of the short-circuit current from the other parallel connected modules.

Page 5 of 6 9. Is a disconnect mandatory both inside and outside for a mini-split system? Yes-No-Maybe. 424.19 There are so many different makers and combinations of make-ups of these systems that no one answer will cover them all. You will have to look at the installation instructions first and then apply the proper Code section. It should be noted, however, that in some cases it is allowable for the breaker in the panel to serve as the disconnect for these units per 424.19. 10. There is a GFCI protected 125 volt 15 amp receptacle outlet installed on the front porch of a single dwelling. I have to step up onto the porch slab 4 inches from grade to access the receptacle. Can this receptacle be recognized as the required outside receptacle on the front of the dwelling unit? As the question is written, no. See 210.52(E) that states For a one-family dwelling and each unit of a two-family dwelling that is at grade level, at least one receptacle outlet accessible while standing at grade level and located not more than 2.0 m (6½ ft) above grade shall be installed at the front and back of the dwelling. NEC 210.52(E)(3) requires a receptacle outlet within the parameter of the porch. A receptacle can be located to meet both of these requirements. 11. For a 240V to 208Y/120V transformer, is it better to bond the neutral to the metal frame at the transformer itself, at the panel, or at both locations? Better to bond at the source. There are three exceptions and one may bond the neutral at either point as long as the neutral does not carry parallel current. See 250.30(A)(1) that states This connection shall be made at any single point on the separately derived system from the source to the first system disconnecting means or overcurrent device, or it shall be made at the source of a separately derived system that has no disconnecting means or overcurrent devices. Also see Exception No. 2 that states A system bonding jumper at both the source and the first disconnecting means shall be permitted where doing so does not establish a parallel path for the grounded conductor. Where a grounded conductor is used in this manner, it shall not be smaller than the size specified for the system bonding jumper but shall not be required to be larger than the ungrounded conductor(s). For the purposes of this exception, connection through the earth shall not be considered as providing a parallel path.

Page 6 of 6 12. I was recently turned down by an inspector for using HCF MC cable to wire recessed and lay-in fixtures in a hospital. I understand that non-flexible raceways are required for emergency system wiring; but does that include whips for light fixtures, headboards, custom office furniture and other items that are difficult to connect as well? See 517.30 (C) (3) 3 d. After consulting with DOI and other enforcement entities, the consensus was that lay-in fixtures (luminaires) ARE considered necessary for flexible connection to equipment and thus they, along with the other equipment mentioned above, are permitted to be installed with listed flexible metal raceways and listed metal sheathed cable assemblies; not because they are difficult to connect but because of the need for flexibility after connection.