e-lite fabrication/assembly and Installation instructions

Similar documents
Series Sloped glazed Curtain wall. Installation Instructions

Series Advanced and alternate. Installation Instructions

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

Series Exterior glazed curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

Sun Control-Solar Eclipse-Solar Shelf

YES 600 Thermal Clip Storefront System Installation Manual

YCW 752 Outside Glazed Curtain Wall System Installation Manual

SERIES 406X. Installation Instructions. Place photography here. Don t go over grey area. (size w x h )

YES 45 TU Thermal Storefront System Installation Manual

INSTALLATION INSTRUCTIONS

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

YSG 40/50/50T Window Wall System Installation Manual

Storefront Installation Guide

Thermally Broken Framing and Door Installation

YWE 40 T Window Wall System Installation Manual

INSTALLATION MANUAL STOREFRONT DOORS

YES 40 FS/FI Storefront System Installation Manual

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

YSD 400 Sliding Door System Installation Manual

Frameless Inline Door With Return QCI5263

Assembly and Installation Instructions Section 1

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

INSTALLATION INSTRUCTIONS SERIES 3600 SUNSHADE SYSTEM

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

14000 Series. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

TCR 250 THERMAL COMPOSITE RIBBON WINDOW

Installation Instructions

4500 Series. Fabrication and Installation Instructions

YOW 225 TU Window System

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

Swing Door Installation Manual

SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES

Linear Open Style Suspended Ceiling Installation Guide

YHC 300 SSG Structural Silicone Glazed Curtain Wall System Installation Manual

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

YES 45 XT High Performance Thermal Storefront System

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

Frameless Inline Door QCI5254

YES 45 FS/FI Storefront System Installation Manual

FIXED PANEL SLIDER QCI5241

Frameless Inline Door QCI5248

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

Series 526 Thermal impact storefront. Installation Instructions

Series 955 Tech Set storefront. Installation Instructions

Installation Instructions

ELEPHANT DOOR SYSTEMS SERIES E1200

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

YHC 300 IG Inside Glazed Curtain Wall System Installation Manual

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

PORTA-FAB Cleanroom Wall Systems

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Series 406 storefront. Installation Instructions

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

A-935 RODA WALL MOUNT HINGES

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! OCTOBER Phone: OLDCASTLE ( ) Web Address:

Installation Instructions for Vista Air Vertically Folding Walls

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Sun Windows General Information New Construction Hinged Door Installation Instructions

SECTION HOLLOW METAL DOORS AND FRAMES

Series 525 impact storefront. Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Installation Guidelines

Installation Manual. YSD 600 T/TH Sliding Door. YSD 600 T/TH Sliding Door System

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

YVS 400 TU Window System

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

Heavy Wall Applied Stop Tube Frame and Door Installation

Frameless Fixed Panel Slider

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

YSD 600 T/TH Sliding Door System Installation Manual

Installation Guidelines

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Storefront Installation Guide INSTALLATION INSTRUCTIONS

WOODWORKS Walls. Installation Instructions WALL

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

Façade INSTALLATION INSTRUCTIONS 03/2014-V1

Installation Instructions and Details

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

Transcription:

e-lite fabrication/assembly and Installation instructions Part NO. YWLS February 2013

TABLE OF CONTENTS SECTION PAGE I. General Notes and Guidelines.. 3-4 II. E-Lite Stick Built Channel Base Assembly... 5 III. E-Lite Stick Built Internal Support Channel Assembly...6 IV. E-Lite Stick Built Aluminum Panel Installation...7-8 V. E-Lite Stick Built Terminator Channel Attachment 9 VI. E-Lite Stick Built Face Cap Attachment..10 VII. E-Lite (Optional) End Cap Attachment..11 VIII. E-Lite Module Built Base Frame Assembly...12-13 IX. E-Lite Module Built Aluminum Panel.14 X. E-Lite Module Built Aluminum Panel Module.15 XI. E-Lite Module Built Base Attachment..16 XII. E-Lite Module Installation..........17-18 XIII. E-Lite Module Alignment Clips Installation...19 Minimizing Condensation Note: Please reference EFCO's "Understanding Condensation" brochure which can be obtained through your EFCO representative. Condensation will form on any surface when unfavorable conditions (interior temperature and relative humidity and exterior temperature) are present. When the formation of excessive condensation is a concern, it is highly recommended that a design professional is utilized to perform an analysis of the shop drawings to recommend the best possible installation methods. Please contact your EFCO representative for information on EFCO's Thermal Analysis Services. Many current installation practices lead to an increase in the possibility of the formation of condensation. Though not all inclusive, the list of examples below illustrates conditions under which condensation is likely to occur: 1. Bridging system thermal break with non-thermally broken metal flashing or lintels that are exposed to the exterior 2. System exposure to cold air cavities 3. Interior relative humidity levels not maintained at recommended levels, see EFCO s Understanding Condensation brochure 4. Inadequate separation between system and surrounding condition at perimeter 5. Product combinations during the shop drawing stage that result in bridging thermal breaks of one or all products involved Note: These installation instructions are a supplement to the approved shop drawings and are to be used in conjunction with those drawings. EFCO CORPORATION 6/2012 PART NO. YWLS Page 2 of 19

Section I: General Notes and Guidelines A. HANDLING / STORING / PROTECTING ALUMINUM - The following precautions are recommended to assure early acceptance of your products and workmanship. 1. HANDLE CAREFULLY- Store with adequate separation between components so the material will not rub together. Store material off the ground. Protect materials against weather elements and other construction trades. 2. KEEP MATERIAL AWAY FROM WATER, MUD, AND SPRAY - Prevent cement, plaster, and other materials from contacting and damaging the finish. Do not allow moisture to be trapped between the finished surface and the wrapping material. 3. PROTECT MATERIALS AFTER ERECTION - Wrap or erect screens of plastic sheeting over material. Cement, plaster, terrazzo, and other alkaline materials are very harmful to the finish and are to be removed with soap and water before hardening. Under no circumstances should these materials be allowed to dry or permanent staining will occur. B. GENERAL GUIDELINES - The following practices are recommended for all installations: 1. REVIEW APPROVED SHOP DRAWINGS Become thoroughly familiar with the project. Shop drawings govern when conflicting information exists in these installation instructions. 2. INSTALL ALL FRAMING MATERIAL PLUMB, LEVEL, AND TRUE Proper alignment and relationships to benchmarks and column centerlines, as established by the architectural drawings and the general contractor, must be maintained. 3. THE SEQUENCE OF ERECTION SHOULD BE COORDINATED WITH THE PROJECT SUPERINTENDENT TO PREVENT DELAYS AND MINIMIZE THE RISK OF MATERIAL DAMAGE. NOTE: IF ADDITIONAL ANCHORS ARE REQUIRED, COORDINATE AND SUPERVISE ANCHOR PLACEMENT WITH THE GENERAL CONTRACTOR. 4. Verify that all job site conditions and accompanying substrates receiving the installation are in accordance with the contract documents. If deviations occur, notification must be given IN WRITING to the general contractor and differences resolved before proceeding further with the installation in the questionable area. EFCO CORPORATION 6/2012 PART NO. YWLS Page 3 of 19

Section I: General Notes and Guidelines 5. Prevent all aluminum from coming in direct contact with masonry or dissimilar materials by means of an appropriate primer. 6. Follow EFCO framing installation instructions. Verify contents of all material shipments received upon their arrival. Verify quantity and correct finishes. NOTIFY EFCO IMMEDIATELY OF ANY DISCREPANCIES OR DAMAGE, WHICH MAY HAVE OCCURRED Basic Design Guidelines E Lite is to be used for maximizing daylight potential in Southern Exposed Glazed Framing Products. E-Lite should be located at a height above the floor that does not interrupt flow of foot traffic. E-Lite projection must not exceed 36 from the mounting wall product or substrate. E-Lite nonexposed internal structural components are typically mill finish; however, they may be painted or anodized per preference. Aluminum panels will be painted as specified. It is suggested that a nonspecular light colored finish be used for the upper surface of the shelf to maximize the reflection of daylight into the space. [It is advised that local building and fire code officials be consulted for applications with E - Lite and fire sprinkler systems.] E-Lite is designed to be a self supporting sun control device. It is not intended to be used for storage of potted plants, books, etc. Do not place any objects on the E - Lite System or use as a support handle or step. [Additional loads (potted plants, books, etc.) may be possible to accommodate on a per project basis.] E-Lite System is designed as an accessory for EFCO Corporation Curtain Wall and Storefront Products. Contact your local representative for product specific attachment details. E-Lite System CANNOT be installed on any INSIDE GLAZED Curtain Wall or Storefront horizontals. Contact your local representative for specific product details. E-Lite System MUST NOT bridge any expansion joint or expansion mullion. EFCO CORPORATION 6/2012 PART NO. YWLS Page 4 of 19

Section II: E-Lite Stick Built Channel Base Assembly 1.) Fabricate, Assemble, and Anchor E-Lite Channel Base. A.) Start with the channel base. Cut to length, locate and drill all anchor and support strut attachment holes. Strut attachment holes (4 per strut) * #13D8 Channel Base Channel Base anchor holes * B.) Attach all struts with the lead-point attachment screws through the channel base into the strut and tighten firmly. Strut attachment screws Channel Base Channel base anchor screws (N.B.E.) Light Shelf support strut, centerline to centerline spacing not to exceed 24 O.C. C.) Attach the channel base support / strut assembly to the glazed wall product or substrate with *appropriate size and quantity of fasteners. (*Attachment fasteners are only sized and provided by EFCO when attachment is to EFCO material.) Horizontal framing mullion or vertical wall substrate Support Strut Channel Base EFCO CORPORATION 6/2012 PART NO. YWLS Page 5 of 19

Section III: E-Lite Stick Built Internal Support Channel Assembly 1. Fabricate and Install Internal Support Channel. A.) The internal support channel must be cut to length (nominally 4 less than strut centerline to centerline dimension). Locate and drill all attachment holes in the support channel. (Typically the same anchor screw is used at the internal channel support as used to anchor the channel base.) ± #13D9 #13D8 B.) Align drill a clear hole in the channel base and a pilot hole in the horizontal mullion. (This is recommended even if self drilling screws are used to avoid binding or breaking of the screw.) C.) Install internal support channel equally spaced between the support struts. Tighten attachment screws firmly. Framing system or wall substrate Support Channel Support Strut Framing system or wall substrate Channel Base Support Strut Support Channel EFCO CORPORATION 6/2012 PART NO. YWLS Page 6 of 19

Section IV: E Lite Stick Built Aluminum Panel Installation 1. Sizing the 1/8 aluminum sheet (sheared to make size dimensions). A.) The make size dimensions for the 1/8 aluminum sheet are not to exceed 36 X 120. The make sizes can be easily calculated by adding up the centerline to centerline dimensions of the support struts in long runs, and subtracting.125 at the intermediate panel locations, and adding.562 at the end panel locations. It is also recommended that a.125 gap be left between the aluminum panels at increments not to exceed 120 of panel length. The.125 gaps MUST OCCUR at the support strut locations. Support Channel Support Strut 2. Loading the Aluminum Sheet Panels. A.) The top aluminum sheet panel can be slid into place with the nonspecular reflective finish facing up. Take care to square the panels and the struts. DO NOT FASTEN the panel to the struts. Aluminum Sheet Panels EFCO CORPORATION 6/2012 PART NO. YWLS Page 7 of 19

Section IV: E-Lite Stick Built Aluminum Panel Installation B.) Insert the bottom panel in the same manner as the upper, squaring and spacing the struts down the length of the light shelf. The aluminum panel, once seated, should extend approximately ¼ past the end of the struts. Aluminum Sheet Panels C.) Once the bottom panels are in place, support the assembly at each strut approximately ¼ higher than the desired level above the finished floor. With panels supported and level along the run, align drill and countersink the bottom panel at each strut location. Then pin with the flat head fasteners provided. This will minimize unleveling due to sag over time. On panels that extend up to the maximum depth, it may be necessary to pin both top and bottom panels at the strut locations in the flexed position as illustrated below. E-Lite in supported flex position Level line E Lite in unsupported pinned position Level line EFCO CORPORATION 6/2012 PART NO. YWLS Page 8 of 19

Section V: E Lite Stick Built Terminator Channel Attachment 1. Fabricate and Install Terminator Channel. A.) The terminator channel must be cut to length. Locate and drill all strut attachment holes in the channel. #13E0 B.) Align the holes in the terminator channel with the races in the end of the strut, and attach with the lead-point screws. After all screws have been started, go back and tighten all screws firmly. Glazed Wall / Substrate Support Strut Terminator Channel Glazed Wall / Substrate Support Strut Terminator Channel EFCO CORPORATION 6/2012 PART NO. YWLS Page 9 of 19

Section VI: E Lite Stick Built Face Cap Attachment 1. Fabricate and Install Face Cap. A.) The face cap must be cut to length. Face Cap B.) Engage the face cap on the upper snap and rotate onto the lower snap. It may be necessary to use a block of wood and a mallet. Face cap fully snapped-on EFCO CORPORATION 6/2012 PART NO. YWLS Page 10 of 19

Section VII: E-Lite (Optional) End Cap Attachment On some applications, the light shelf does not terminate at an abutting wall, and the raw edges of the horizontal members are exposed. In this case, EFCO offers an optional finished end cap plate to be attached to the support struts to close off the end(s) of the light shelf unit. 1. Fabricate and Attach End Cap. Note: The end cap may be square cut to the depth of the light shelf and attached to the support strut with screws. There are a number of alternative attachment methods that could be used, including mastic, pop-rivets, etc. However, EFCO recommends using screws to provide a secure attachment that may also be disassembled should the need arise. Undercut countersunk hole for #8 FHSMS #13E2 Note: Any raw or sharp aluminum edges should be smoothed with a file or emery cloth and touch-up paint applied. EFCO provides air dry touch-up paint in any of the standard colors. For custom air dry touch-up paint, contact your local representative for availability and pricing. Any exposed flat head screws should be filled and painted to minimize their exposure. Raw, sharp, aluminum edges must be smoothed and countersunk holes with fastener heads should be painted. EFCO CORPORATION 6/2012 PART NO. YWLS Page 11 of 19

Section VIII: E-Lite Module Built Base Frame Assembly The Module Built E-Lite refers to the system of fabrication and assembly, so as to allow the light shelf to be fabricated and built into modules, transported to the job-site, and loaded into the Anchor Base Channel. The E-Lite Module Built system uses the same material; it is only fabricated and assembled in a different manner. The assumption is that the E-Lite material can be ordered in stock lengths, fabricated, and assembled in the customer s shop, then attached to a previously set curtain wall, storefront, or substrate wall. 1. Fabricate the Support Struts. A.) The struts have what is called a peel vee and can be run across a table saw to cut a kerf at the 2 mark so the material to be removed can be broken off with a pair of pliers. 2. Fabricate Internal Support Channel and Terminator Channel. A.) Locate and drill all strut attachment hole patterns in the support and terminator channels as indicated below. EFCO CORPORATION 6/2012 PART NO. YWLS Page 12 of 19

Section VIII: E-Lite Module Built Base Frame Assembly 2. Assemble E-Lite Module Frame. A.) Assemble components as shown into ladders, tighten all fasteners firmly. Strut to internal base Tek attachment screws Strut to internal base lead-point attachment screws Notched Ends Internal Base Terminator Channel Strut lead-point attachment screws E-Lite Support Strut centerline to centerline spacing is not to exceed 24 O.C. Completed E-Lite Module Ladder EFCO CORPORATION 6/2012 PART NO. YWLS Page 13 of 19

Section IX: E-Lite Module Built Aluminum Panel 1.) Load Aluminum Panels into E-Lite Module Ladder. A.) Assemble components as shown into ladders, tighten all fasteners firmly. Aluminum Panel Top and Bottom Assembled Module Ladder Framing 2.) Square the E-Lite Module Ladder to the Panels and Pin. A.)Flush the edges of the aluminum panel with the module ladder and clamp as a unit. Recheck for squareness. B.)Align drill and countersink the aluminum panels at 12 on center. Pin the panel with the Tek screws supplied, tighten all fasteners firmly. Make sure the fastener heads are at least flush or better yet, slightly recessed below the surface of the aluminum panel to minimize interference. Drill and countersink aluminum panel for Tek attachment screws top and bottom EFCO CORPORATION 6/2012 PART NO. YWLS Page 14 of 19

1.) E-Lite Module Panel Section X: E-Lite Module Built Aluminum Panel Module Tek attachment screws, top and bottom at 12 on center Module Length Standard Module Depths [16, 18, 20, 22, 24, 26, 28, 30, 32, 34, 36 ] Module Frame Depth Module Panel Depth Top Panel Support Strut Terminator Channel Bottom Panel Internal Base EFCO CORPORATION 6/2012 PART NO. YWLS Page 15 of 19

1.) E-Lite Base Section XI: E-Lite Module Built Base Attachment A.) Locate the horizontal component or substrate where the E Lite will be attached. Note: Typically the top of the base will be flush with the top of the horizontal. B.) Level the E-Lite Attachment Base in the perpendicular to the wall plane. While securing the base to the vertical wall, avoid flexing or bowing the E-Lite Base extrusion. (This will make it difficult to load the rigid E-Lite Module panels into the base.) #13D8 Attachment Base Vertical Curtain Wall, Storefront, or Substrate Attachment Base Attachment Base Fasteners Note: When E-Lite System is attached to EFCO Corporation Curtain Wall or Storefront Products, the size, type, spacing, and quantity of fasteners will be recommended based on the depth of E-Lite System. Attachment fastener recommendation to any other (non- EFCO) product or substrate must be designed accordingly by responsible party. EFCO CORPORATION 6/2012 PART NO. YWLS Page 16 of 19

Section XII: E-Lite Module Installation 1.) Install Light Shelf Panel Module into Base. A.) Load the E-Lite Panel Module into the Base and support temporarily. B.) Leave a recommended nominal 1/8 gap between the panel modules. (This gap should be defined on the shop drawings.) Note: Typically the top of the Base will be flush with the top of the horizontal mullion. Flush Horizontal Mullion Attachment Base Vertical Mullion Note: E-Lite MUST NOT bridge any expansion joint or expansion mullion. Tek Attachment Screws Attachment Base E-Lite Panel Module EFCO CORPORATION 6/2012 PART NO. YWLS Page 17 of 19

Section XII: E-Lite Module Installation C.) Align Light Shelf Panel Module into Base (Temporarily support terminating edge). Attachment Base E-Lite Panel Module D.) Attach Light Shelf Panel Module into Base. E-Lite Panel Module Tek attachment screws top and bottom 12 O.C. 1/8 gap between E-Lite Modules EFCO CORPORATION 6/2012 PART NO. YWLS Page 18 of 19

Section XIII: E-Lite Module Alignment Clips Installation 1.) Attach Alignment Clip. A.) Locate the alignment clips at the nominal 1/8 module gaps. The clips are designed to bridge the gap and clear all of the module frame assembly screws. Alignment Clip B.) Attach the clip with the Tek screws supplied. One (1) screw for each of the fixed holes first and one (1) screw in the approximate center of the adjacent slotted hole into the next light shelf module. It is expected that some minor alignment / adjustments will be needed before the clip is firmly seated, and then the screws are tightened. Alignment Clip TEK Screws C.) See SECTION VI for the Face Cap Attachment and SECTION VII for the End Cap Attachment. EFCO CORPORATION 6/2012 PART NO. YWLS Page 19 of 19