Reliance SG800 Series Steel Water Gage Valves

Similar documents
Reliance SG777 Series Steel Water Gage Valves

Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87

Fisher 667 Diaphragm Actuators Size 80 and 100

CV Control Valves Installation and Operation Manual

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

GH BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODEL F10207 DOUBLE ACTING HYDRAULIC ACTUATOR

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G13 SERIES HYDRAULIC ACTUATORS WITH POWER MODULE TIE BAR CONSTRUCTION

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

25000 Series Lo-T TM Butterfly Control Valve Instructions

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

VALVTECHNOLOGIES, INC. INSTALLATION, OPERATIONS & MAINTENANCE MANUAL STEAM CHOKE VALVES

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Series 4000 Model B 3-Piece Ball Valves with ISO Bonnet

Installation, Operation & Maintenance Manual

G01 through G10 Series Hydraulic Actuators Double-Acting with M11 Hydraulic Override Disassembly and Reassembly

Fisher 657 Diaphragm Actuators Size 80 and 100

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3

Installation, Maintenance and Operating Instructions

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

LPK1550 Hydraulic Crimping Tool 15-ton

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

Mounting Instructions For 3-Piece Namur Style Mounting Bracket To 2-Way 60 Series Valves

3 Emergency Breakaway Coupling

Operating Instructions for

Rhino Packing Gland Tool

Type XTSR71 Sizes

Repair Manual 12 PL PILOT

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Emission-Pak Assemblies

TECHNICAL INSTRUCTIONS

Series 4000 Model B 3-Piece Ball Valves with ISO Bonnet

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL

4" (DN 100) 5RET Tank Car Fire-Tite Bottom Unloading Valves. Installation, Maintenance and Operating Instructions

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

Fluid Sealing Association

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

MALEKO WALL-MOUNT FAUCET INSTALLATION

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.

TYPE 3710 CARTRIDGE SPLIT SEAL

Installation, Operation & Maintenance Manual

OnBoard Bass Drum/Gong Cart

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

8 TONNE LOG SPLITTER

SERVICE INSTRUCTIONS

H4670/42192 Submersible Trash Pump

SYGEF Standard SYGEF Plus PVDF Flanges

General Four-Way Operation, Maintenance & Service Manual

SERVICE MANUAL CLINTON FEED OFF THE ARM CHAIN CUTTER WITH EXTERNAL AIR DRIVE MODEL 2115FOTA-V FOR UNION SPECIAL 35800, & YAMATO FD-62 ML2115-7A

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

GP-SD GENIE PROBE SMALL DIAMETER

Installation, Operation & Maintenance Manual

INSTALLATION INSTRUCTIONS

OPERATION & MAINTENANCE MANUAL


SERVICE INSTRUCTIONS Model 9670 Lubricant Pump

EMO. Service Instruction. created by Frank Weithöner. Table of contents: Special Tools Assembling Mixing Chamber

Installation, Operation and Maintenance Manual. RB Weir Gate

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

PROCEDURE:INSTALLATION OF BOLTED AND THREADED CONNECTIONS. as a result of improper lifting technique.

Yoke Type Hinged Closures Installation, Operation & Maintenance

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Installation Instructions for Vista Air Vertically Folding Walls

400 SERIES GRINDER PUMPS 41502, 42202,43302, AND MODELS

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

Comp-DS Driveshaft. User Manual B

Airflex Product Line PDC Installation, Operation and Maintenance of PDC Assemblies

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

Service Instructions Part Number: E, Rev. C Release: August G01 through G10 Spring-Return Pneumatic Actuators with M11 Hydraulic Override

CRITICAL INFORMATION:

INSTALLATION INSTRUCTIONS

Caution: Installation and Operation Instructions. Locking Mechanism (if supplied) Set Screws Backed Out. Mounting Orientation

MAINTENANCE GUIDE ULTRAEDGE LHD LIP SHROUD SYSTEM INSTALLATION, MAINTENANCE AND REMOVAL INSTRUCTIONS

Service Instructions E Rev. C August G01 through G10 Double-Acting Pneumatic Actuators with M11 Hydraulic Override

DO35 MAINTENANCE INSTRUCTIONS

Gared Pro-S Portable Backstop

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

Introduction... 2 Scope of Manual... 2 Description... 2 Specifications Installation... 2 Actuator Mounting... 3 Loading Connection...

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

YONGJIA NSV VALVE CO.,LTD. GATE, GLOBE & CHECK VALVES ASSEMBLY & MAINTENANCE PROCEDURES

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

4456H TYPE 1 OWNERS MANUAL

MSR/MSB Mechanical Setting Tool

Fuel - Defuel Valve. Model Maintenance & Repair Manual. SM61499 Issued: February 1996 Applicable additional manuals: NONE

ETX Powered Loudspeaker Accessories

WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623

ITEM NO. PART NO DESCRIPTION QTY.

Bolt Together Pump/Screw Together Frame Conversion Kit

The DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly.

Service Instructions Part Number: E, Rev. C Release: August G01 through G10 Double-Acting Pneumatic Actuators with M11 Hydraulic Override

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

AFB (AIR FAN BEARING) INSTALLATION GUIDE

Transcription:

Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves

Note: Design variations in Steel Water Gage Valves necessitate typical illustrations, but basic elements are similar in function and appearance. STORAGE and HANDLING The Reliance Steel Water Gage Valves meet or exceeds all applicable specifications when shipped from the factory. The equipment should be stored in an area protected from the elements and corrosive fumes, in a secure manner where they can neither fall, nor be struck by other objects. Avoid placing any objects on the valves or Boil-out Kit (if furnished) at any time. The temperature of the storage area should not exceed 150 degrees F. (65.5 degrees C) or drop below 32 degrees F (0 degrees C). Unpacking and inspection Upon receipt of the Boiler Drum Level instruments, examine the contents of the container(s) for damage. Care should be exercised as the items are uncrated. The shipment may contain fragile glass components. Report any faulty conditions as soon as possible to your carrier to avoid acceptance of damaged goods. Clark-Reliance will not be responsible for goods damaged in shipping or storage, or subsequent loss or damage due to improper storage or exposure as a result of damage to shipping containers. Submit a digital photo of any damaged equipment and container to Clark-Reliance, if possible. Verify that all materials are present as recorded on the Packing List provided with each shipment. Report any discrepancies to Clark-Reliance immediately. Have the Clark-Reliance order number and shipping waybill available at the time of your call. Handling Your Clark-Reliance shipment has been carefully packed. However, the shipment may include spare parts, temporary water gages for Boil-out purposes, maintenance instructions, and engineering drawings. Upon receipt of the order, the equipment and above items should be identified and verified against the packing list. Any documentation that has been provided should be directed to the appropriate personnel. Important: Before proceeding, follow any and all plant lock out - tag out procedures required. If under pressure, the equipment should be isolated, or the boiler should be shut down before proceeding with the installation. Open drain valve to eliminate any trapped pressure. All inspection and installation steps should be performed by a qualified technician and should be executed in accordance with all applicable national and local codes. INSTALLATION OF NEW SG SERIES WATER GAGE VALVES: Models and connection information: Model No. Vessel Connections Ball Check Ball Check Max. Union Gage Connection Lower Upper Pressure SG854 ¾ MNPT No No No ¾ O.D. Nipple 1500 PSI SG855 ¾ MNPT Yes Yes Yes ¾ O.D. Nipple 1500 PSI SG854F-300 ¾ MNPT No No No ¾ -300# R.F. Flange 605 PSI SG854F-600 ¾ MNPT No No No ¾ -600# R.F. Flange 1135 PSI SG854F-900 ¾ MNPT No No No ¾ -900# R.F. Flange 1500 PSI SG860 ¾ -900# R.F. Flange No No No ¾ O.D. Nipple 1500 PSI SG861 ¾ -900# R.F. Flange Yes No No ¾ O.D. Nipple 1500 PSI SG861U ¾ -900# R.F. Flange Yes Yes No ¾ O.D. Nipple 1500 PSI SG885 ¾ -600# R.F. Flange Yes No No ¾ O.D. Nipple 1135 PSI SG885U ¾ -600# R.F. Flange Yes Yes No ¾ O.D. Nipple 1135 PSI SG886 ¾ MNPT Yes No No ¾ O.D. Nipple 1500 PSI

When mounting Steel Water Gage Valves, make sure they are mounted in exact alignment, especially when tubular glass is used during Boil-out procedures. Any angular or offset misalignment of the valves will strain the tubular glass and may cause early failure. When installing the armored type gage glass, any misalignment could cause a leak from the packing cartridge that may result in damage to the valve or gage glass. When mounting the gage glass or tubular glass in vertical mounting applications, the overall length of the gage should be 3 ¼ less than the valve centers. When mounting water gage valves and a gage glass directly to the vessel, the valve centers must be secured to prevent movement which could result in leakage around the gage glass nipple packing. Use of a Tie Bar with U-bolts, water column, or Standpipe to keep the water gage valve centers from expanding is recommended. Installing the valves: The valve set contains two valves: an upper and a lower. The lower valve has a ½ FSW/FNPT drain connection and must be installed on the lower connection to guarantee proper operation of the valves and gage glass. Reliance steel water gage valves typically are furnished with three types of vessel connections: 1) ¾ Male NPT 2) Flanged 3) Female Socket Weld If furnished with male NPT connections, coat the threads with a pipe joint compound such as TYTE-UNYTE Thread Sealing Compound or equal. Assemble the upper and lower valves on to the vessel connections making sure there is no angular or offset misalignment of the valves. Note that the valves may be seal welded to the connections if needed. This is normally recommended for installations that operate over 900 PSIG. Welding is to be done by ASME Section IX qualified welders and with approved welding procedures and Section II approved welding materials. If the valves are furnished with female socket weld connections, care must be taken the valves are oriented so there is no angular or offset misalignment. Welding is to be done by ASME Section IX qualified welders and with approved welding procedures and Section II approved welding materials. Flanged valves must be assembled to the mating flanges with the proper gaskets, studs, and nuts that are used for the flange size, class, and flange face. The studs should be lubricated with high temp copper based anti-seize lubricant or equal. Tighten the fasteners to the recommended torques value that is associated with the flange size and class. Attaching the Operating Levers Tools required: ½ wrench To set operating levers in the correct position, close the valve stems tight. Loosen the levers by removing the cap screws. Pull levers forward and turn, with right hand end down, until they are positioned 45 to horizontal centerline of valve. Push the lever back to engage the sprocket teeth at the nearest point to the 45 setting. If the levers do not line up, additional adjustment can be obtained by rotating the sprocket wheel 180 on the valve stem. Attaching the Operating Chain and Pull Handles Tools required: ¼ wrench, pliers Attach the chain to each side of the upper valve with the S hooks, which are included in the chain package. At this stage the levers should be parallel with each other. Attach the chain on the left side of the valve lever to the S hook on the lower valve. Insert the chain on the right hand side of the lever into the bronze locking fixture (Figure 1). Pull the chain tight between the two valves and tighten the locking screw. This is important in order to obtain full closure of both valves. If there is some slack in the chain on the left side of the valves, it has no adverse effect on the actuation of the valves for opening. Both chains should extend to a safe elevation below the water gage, usually one platform or 10 feet below. Be sure to have water gage valve-operating chains of equal length.

Bronze Locking Fixture Figure 1 Each pull handle comes equipped with S hooks. Insert the free end of each S hook in the bottom link of the correct chain. The handle marked Open is to be installed on the left-hand chain. The handle marked Closed is to be installed on the right-hand chain. Close each hook onto the chain with pliers. Refer to IOM Form E207-A for additional instructions. Maintenance: Caution: Prior to any maintenance and disassembly of the water gage valves, first isolate the valves and be sure that the valves are relieved of all internal pressure, the temperature is ambient, and have been drained or purged of any water. Failure to do this may result in a sudden release of pressure and fluids, which could cause physical injury to personnel. Repacking the valves: 1. Remove stem bushing locking set screw; loosen with a 5/32 hex wrench to clear bushing threads (Figure 2). Stem bushing set screw Figure 2 2. Remove stem, stem bushing, packing yoke, and all old packing material. Inspect packing chambers for pitting or steam cut. Polish as necessary with fine emery cloth. Replace valve if the chamber cannot be repaired with fine emery cloth. 3. Install new packing cartridge(s). Use SG854-4 stem packing cartridge for stem applications and SG854-5 nipple packing cartridge on valve models with nipple connections for the water gage. 4. Lubricate threads of stem. stem bushing, and cap screws with Molykote "G" high temperature lubricant, or equal. Install packing washer, yoke, stem, and stem bushing. 5. Retighten stem bushing locking set screw. 6. Replace yoke and cap screws lubricated with Molykote "G" high temperature lubricant, or equal and tighten with a 5/8" open-end wrench to avoid over-torqueing and binding the stem. 7. Crack open valves to allow gradual warm-up of gage glass for several minutes. 8. Close drain valve and further tighten packing yoke screws, if necessary, to stop leakage. 9. Open valves and check again for leakage once valves and packing have reached full operating temperature.

Repacking the seat: 1. Remove stem bushing set screw; loosen with a 5/32 hex wrench to clear bushing threads (Figure 2). 2. Remove stem, stem bushing, packing yoke, all old packing, and packing washer. Inspect packing chambers for pitting or steam cut. Polish as necessary with fine emery cloth. Replace valve if the chamber cannot be repaired with fine emery cloth. 3. Insert a 3/4" socket with an extension into the valve body, onto the valve seat and remove valve seat by rotating counter-clockwise. Note: old style valves contain a separate valve seat and seat holder. Remove seat holder with a 1/2" socket extension. 4. Lift out seat and seat gasket. Dispose of the gasket. 5. Clean and lubricate threads of seat with Molykote "G" high temperature lubricant, or equal. 6. Install new seat gasket and new seat. Tighten seat using 40 ft.-lb.(54 newton-meters) torque. 7. Lubricate threads of stem, stem bushing, and cap screws with Molykote "G" high temperature lubricant, or equal. Install packing washer, yoke, stem, and stem bushing. 8. Repack stem as described above. Retighten stem bushing locking set screw. Be sure to check for leakage and re-tighten cap screws (if necessary) shortly after boiler is returned to service. FIELD INSTALLATION OF LIVE LOADING KIT (RK-34) FOR SG800 SERIES WATER GAGE VALVES: The RK-34 Live-Loading kit is available to improve the performance and service live of Clark-Reliance Steel Water Gage Valves that are already installed in the field. Live-loading offers a more leak-free valve, resists damage from vibration, pressure variances, time and service, and other wear factors. Installation steps are as follows: 1. Remove stem bushing locking set screw; loosen to clear bushing threads (Item G). Remove and discard the old cap screws and flat washers from the packing gland (Item E). 2. Remove the stem bushing (Item B) and the stem (Item A). Then remove the packing gland (Item E) and the stem packing cartridge (Item F). 3. Inspect packing chamber for pitting or steam cut. Polish as necessary with fine emery cloth. Replace valve if the chamber cannot be repaired with fine emery cloth. 4. Install the new packing cartridge (Item F) in the packing chamber. Then re-install the packing gland, stem and stem bushing. Tighten the stem bushing and install the lock screw. 5. Lubricate both sides of the spring washers (Item H) and the cap screws (item C) with Molykote "G" high temperature lubricant, or equal. Install the washers and cap screws as shown in Figure 3. Note the orientation of the spring washers. 6. Tighten the cap screws evenly to guide the packing gland squarely into the packing chamber. Apply 10 ft-lbs of torque to each cap screw. 7. Cycle the valve several times to assure that the stem will operate smoothly. Reassemble the operating chains. Figure 3

REPLACEMENT PARTS FOR SG800 SERIES VALVES