INSTALLATION INSTRUCTIONS

Similar documents
INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. NBR SERIES EXPANSION JOINT COVER SYSTEMS

Installation And Care Instructions. Vertical Honeycomb Shades

Assembly Instructions

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION AND CARE INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

Assembly Instructions

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS 6" & WIDER CEILING JOINT COVER SYSTEMS

If you discover that material is missing or defective, contact our customer service department immediately:

INSTALLATION INSTRUCTIONS FOR BALCO, INC SERIES GYMNASIUM FLOOR JOINT COVERS

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

NX7 SERIES 5-1/2 HANDRAIL

Frameless Inline Door With Return QCI5263

Wallboard or plastic Pre-drill holes and use hollow wall anchors or toggle bolts to install your shade in wallboard or plastic.

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

INSTALLATION AND CARE INSTRUCTIONS

Vertical Honeycomb Shades

PAT installation of a Sun Dome over a in-ground

Spring Loaded All Season Roll-Up Doors

Installation Instructions - Model V4JSD 1

Frameless Inline Door QCI5248

10 Octagon Cedar Gazebo Assembly Instructions

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

Frameless Inline Door QCI5254

MICHAEL RIZZA COMPANY Premium Silicone Systems

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.

TrendWall Floor-To-Ceiling Panels Installation Instruction

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FOR BALCO, INC. BRONZE STAIR NOSINGS

EZ-Grow Professional Greenhouse Bench

CABINETRY Assembly Instructions

Door Installation. Bulletin Install Read and understand these instructions before proceeding! It saves frustration!

Installation Instructions

Gared Pro-S Portable Backstop

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

PRODUCT INFORMATION MANUAL SECTION: 9F-1 DUETTE ULTRAGLIDE LIFTING SYSTEM DUETTE SIGNATURE ULTRAGLIDE LIFTING SYSTEM

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

10x10 Trellis Pergola

Passenger/Right Front Mounting Bracket

Q-Sox Installation Instructions

Constructing Wire Fences

INSTALLATION INSTRUCTIONS

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS

ClearPix Fixed-Frame Screen Installation Manual

PRO Series Brakes Operating Instructions

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

ClearSpan Hydroponic Table Kit

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

1. Layout. Step 1. Step 2. Step 3. Fig. 1

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

WG-4 Wall Guard Installation Instructions

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

Octagon Vinyl Gazebo Assembly Instructions

Contractors Rack Assembly and Installation Instructions

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

Horizontal Cable Systems

Installation Operation Care

KD Table Base Assembly and Top Attachment Instructions

Horizontal Cable Systems

Mat Instructions: Rubber Hinge

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Rockwell 4-in-1 Sliding Door

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

UNIVERSAL PANEL AND GATE

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Trackstar Manual Folding Shade Installation Instructions

Pleated Shades with Corded Top Down / Bottom Up Option

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Frameless Fixed Panel Slider

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

Revised

OXYGEN INSTALLATION. Revision date

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

6a. Eight Steps to Chain-Link Fence Installation

Half Door Installation Instructions

McCue Bumper Installation Instructions

Loose Lay Luxury Vinyl Plank

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Quick Fit Installation Guide Retractable Screen - Double Door

Office Installation Guidelines

Desk/Wall-Mount Rack

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Deluxe Exterior Solar Shades

QWALL 5.2 (2 Back Panels)

MobileTrak5 Installation Instructions

10x10 Trellis Pergola

A-935 RODA WALL MOUNT HINGES

PRO Brake Operating Instructions

INSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space

VIEWPOINT ALUMINUM RUNNING BOARD TOYOTA RAV4

INSTALLATION INSTRUCTIONS PART#:17A096400MSS\17A096400MA MODULAR GRILL GUARD FOR TOYOTA TACOMA 05-09

Transcription:

INSTALLATION INSTRUCTIONS A CSW Industrials Company FGLP with Cast-In Frames FGLP-A, FGLP-C, FGLP-D IMPORTANT The following instructions are very important. Read them carefully, and be sure you understand them completely before you begin any work. Store this product in the horizontal position in a clean, dry location. This is a finished product. Store this product in a protected area. Do not stack anything on top of this product. Review approved Balco shop drawings for types and locations prior to beginning work. RECOMMENDED TOOLS DRILL / DRILL BITS FOR METAL AND CONCRETE / PHILLIPS, SLOTTED, AND HEX DRIVERS STEP ONE Lay out the frames for assembly. Grids and frames are pre-assembled and prefitted at the factory. However, the frames may be disassembled for shipping, requiring some re-assembly in the field. Ensure that the frames are in correct order for assembly. Note that the frame sections are marked with a letter indicating their relative locations. IMPORTANT: Install frames and grids in the final stages of building completion. If grid frames are installed prior to the final stages of building completion, protect them with plywood until construction is complete. STEP TWO Select the anchor bolt jam nuts and bent bolts (cast-in-place anchors). Place the required number of jam nuts into the frame raceways of each frame section. Note that the cast-in-place anchors are spaced in accordance with the spacing provided on the shop drawings. Rev. 04/17 Toll Free: 1-800-767-0082

STEP THREE After all the anchor bolt jam nuts are inserted into the frame raceways, assemble the frame, beginning with the corners. Locate the mating corner sections for each corner of the frame (see the details for the section designations). Select a corner frame splice bar and fasteners. Insert the splice bar into the recess in one frame and lightly tighten the fastener. Insert the splice bar into the recess in the other frame and tightly butt the frames together. Firmly tighten both fasteners, ensuring the frames stay tightly abutted. Repeat this procedure for each corner. STEP FOUR Complete the frame assembly by assembling the straight sections of frame. Select a corner frame splice bar and fasteners. Insert the splice bar into the recess in one frame and lightly tighten the fastener. Insert the splice bar into the recess in the other frame and tightly butt the frames together. Firmly tighten both fasteners, ensuring the frames stay tightly abutted. Repeat this procedure for each section of frame. FGLP with Cast-In Frames STEP FIVE Slide the installed jam nuts into their final positions. The cast-in-place anchors are spaced in accordance with the spacing given on the shop drawings. Select the frame anchors. Attach the cast-in-place anchor bolts to the frame by screwing them into the positioned jam nuts. Tighten the bolts to secure the anchors in place. email: info@ Page 02 of 05 Toll Free: 1-800-767-0082

STEP SIX Place the assembled frame into its installed position. FGLP with Cast-In Frames Ensure that the frame is level, properly aligned, and at the correct height. Stake the frame into position, attaching it to the concrete forms. Use wood bracing to securely brace the frame to prevent deformation during the concrete pour. NOTE: To prevent distorted installations, twisting the frame or racking the grid, ensure that at least one person is handling each side of the frame and grid assemblies. STEP SEVEN Pour the concrete or grout. Clean any excess concrete or grout from exposed surfaces of the frame before it sets up or hardens. Once the concrete or grout has cured, remove the wood bracing from the frame. Take care not to cause the frame to bow while removing the wood. STEP EIGHT If needed, pour concrete or grout into the inside of the frame until the concrete or grout is level with the lip of the frame. This will form the required level setting bed for the grid to rest upon. Allow this material to cure before proceeding. If a finished floor is to be installed, do so at this time. Follow the material manufacturer s installation instructions for all finish floor materials. email: info@ Page 03 of 05 Toll Free: 1-800-767-0082

FGLP with Cast-In Frames STEP NINE If the grid or grid sections are shipped rolled, release the bindings and unroll the grid sections to allow them to relax. Do not allow the grid sections to become soiled during this relaxing process. NOTE: Floor grid treads may shift during transport. When this happens, the grid or grid section may become out of square. If the grid or grid section is out of square, roll it back up, and using a rubber or leather mallet, tap uneven treads to even them out. This procedure will return the grid to square. STEP TEN After the grid has relaxed, place the grid into its installed position in the frame. Ensure that the grid is centered in the frame and that it is level, plumb, flush, flat and properly oriented. If the grid is provided in sections, place each grid section into its installed position. Ensure that the grid sections are level, plumb, flush, flat, properly oriented and aligned, and that each grid section is in the position established for it and illustrated in the details. The grid sections are assigned a letter designation, which is marked on the grid sections, to ensure proper placement. NOTE: Rolling and unrolling the grid can cause the hinges to stretch, extending the distance between treads and resulting in a longer traffic dimension. To correct, place the grid into its installed position, then gently kick along the traffic dimension of the grid to compress the hinges, until a proper fit is achieved. STEP ELEVEN Select the lockdowns and lockdown fasteners. Lockdowns are installed at each corner of the grid, and at 24 (610mm) on-center, at both edges parallel to the direction of traffic. Roll up or lift up the end of the grid to which the lockdown is to be attached. Place the lockdown plate into its installed position on the substrate, under the grid. Ensure that the lockdown is properly aligned with the recess of the grid s tread. Secure the lockdown to the floor with the fasteners provided by the factory. Restore the grid to its proper installed position in the frame. email: info@ Page 04 of 05 Toll Free: 1-800-767-0082

FGLP with Cast-In Frames SPLICING GRIDS The instructions in this section are applicable only to grids having multiple sections in the grid width. Lockdowns are installed at 24 (610mm) on-center at splices parallel to the direction of traffic. Roll up or lift up the end of the grid to which the lockdown is to be attached. Place the lockdown plate into its installed position on the substrate, under the grid and centered upon the splice. Ensure that the lockdown is properly aligned with the recess of the grid s treads, and spans both adjacent sections of the grid. Secure the lockdown to the floor with the fasteners provided by the factory. Restore the grid to its proper installed position in the frame. email: info@ Page 05 of 05 Toll Free: 1-800-767-0082

CLEANING AND MAINTENANCE A CSW Industrials Company FGLP Floor Grids FGLP-A, FGLP-C, FGLP-D FGLP floor grids are designed to be easy to clean and maintain. The following recommended procedures will help to ensure that the grid remains durable and retains its good appearance. ROUTINE MAINTENANCE OF FLOOR GRIDS For best results, Balco recommends that a regular cleaning and maintenance schedule be established for the floor grids at the time of their installation. This regular maintenance should include periodic inspections of the grids for loose and/or damaged treads. Loose or damaged treads should be replaced immediately. If new parts are required to repair a floor grid, please contact Balco, Inc. for pricing and availability. CLEANING INSTRUCTIONS Tread Rails and Frame (Including Serrated Grids) 1. To clean the aluminum rails and frame, Balco recommends brushing them with warm water and a mild detergent. 2. After cleaning, wet vacuum the rails and frame to remove as much excess moisture as possible. For best results, clean the rails and the frame at the same time that the carpet is shampooed or that the vinyl inserts or abrasive are washed. Always wet vacuum the grid and frame after cleaning to remove as much excess moisture from them as possible. Carpet and Designer Floor Grids 1. Power vacuum and/or sweep the surface of the grid. 2. If the carpet needs to be cleaned, Balco recommends shampooing it with a mild shampoo. Follow the shampooing with a wet vacuuming to remove as much excess moisture from the mat as possible. Abrasive Floor Grids 1. Sweep the surface of the grid. 2. If the vinyl or the abrasive tread inserts need cleaning, Balco recommends brushing them with warm water and a mild detergent. Make sure to remove all water and detergent from the treads after cleaning them. Cleaning Beneath Grids Periodically it will be necessary to remove dirt, etc. from beneath the grid. A regular schedule should be established for cleaning beneath the grid. When cleaning grids with multiple sections, mark each section so that it can be replaced in the same location within the frame. Rev. 04/17 email: info@ Toll Free: 1-800-767-0082