Boom Adjustment Instructions

Similar documents
BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

Hardware and Components:

CORVETTE CORVETTE REV: Made in USA U.S. PATENT #6,808,223; #6,845,547; #7,140,075; #7,059,655 and other patents pending.

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

THIS KIT INCLUDES: 8 M8-1.25X40MM BOLTS WITH WASHERS 8 M8-1.25X30MM BOLTS WITH WASHERS RIGHT AND LEFT HINGE

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Hardware and Components:

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

HD installation guide

AUTOMATIC ADVANCE MANUAL

Special Z-Axis Ballscrew Replacement

installation guide

INSTALLATION GUIDE NS Double Clamp Ladder Rack NV200 / City Express ( Aluminum )

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

2 SHOULDER BOLTS RIGHT AND LEFT HINGE USE 4 EXISITING DOOR BOLTS TOOLS REQUIRED FOR INSTALLATION: AIR RACHET, GRINDER AND CUTTER.

Assembly Instructions 10 X 10 Aluminum Roof Support

OTHER TOOLS MAY BE NEEDED DEPENDING ON YOUR VEHICLE.

Stuff-Your-Stuff Platform Bed (Twin and Full)

Assembly Instructions

CV1B Sliding Table Installation and Setup Guide

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

TOOLS REQUIRED FOR INSTALLATION: AIR RACHET, GRINDER AND CUTTER.

BY ALIEN TECHNOLOGIES CORP

Page 1 of 12 GENERAL INSTRUCTIONS KHJKK Installation

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Installation Instructions

Flat Panel Mobile Cart and Accessories

Race Splitter Upgrade Kit Installation Instructions

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

TABLE OF CONTENTS REQUIRED TOOLS

Removing the Z-Axis lead screw

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

No. 412, 414, 416 Operations Manual

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

a.k.a. casegoods instructions

Mount to the Wall INSTALLATION MANUAL

JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

User Instructions Multiline Otter Scoreboard Caddy Assembly

READ ALL DIRECTIONS CAREFULLY BEFORE BEGINNING INSTALLATION

Models 2230 and 2240

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

High Rise Sit-Stand Desk Converter

Side Winder R o u t e r L i f t.

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Instruction Manual. Banner Grip -banner stretching frame. Manual Version Sept27, Any size made: by Graphic size, OD Size, Live Area -1 or 1,000!

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

AIR MASTER SYSTEMS INSTALLATION GUIDE TABLE OF CONTENTS

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

INSTRUCTIONS FOR 1431 Door Closer with Hold Open Arms 1431 SERIES ADJUSTABLE FROM SIZE 1 THRU 6

INSTALLATION GUIDE 2009-CURRENT HUMMER H3T PRODUCT CODE:

7878 K940. Checkpoint Antenna. Kit Instructions. Issue B

PRECISION KNIFE SHARPENING SYSTEM USER MANUAL

Oxford Stalls Installation Instructions

SINCE 1922 P UBLICATION N O

Sunrise Deck Assembly Instructions for Kingston Left

Luxe Linen Honeycomb Shades

Gared Pro-S Portable Backstop

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

Power Train Lift Max. Capacity: 1,250 lbs.

KIT. Assembly Instructions. HayDay, LLC

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Assembly Instructions 10 X 10 Aluminum Frame Building

Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines

Kai Installation Instructions

Quick Hoops Seedling and Micro Green Bench Instruction Manual

Playground Assembly Instructions

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Motorized Tower Raising System Manual

Removing and Replacing the Y-truck

High Rise Sit-Stand Desk Converter

JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

Phone #: (360) Online Tech Support: Web:

Models CW and AW Installation Instructions

CORVETTE Page 1 of 12 CORVETTE C

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Sliding Door Kit

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Instructions for the installation of Ellison Bronze balanced door models #137 & 138

OPERATOR'S MANUAL 46" SNOW BLADE. Model Numbers OEM IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

Exponents Bench Cushion

Loading Dock Safety Gate

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

Installation Instructions - Model V4JSD 1

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

INSTALLATION GUIDE Rear Bumper. Jeep JL Wrangler

SERVICE MANUAL AND PARTSLIST

SARGENT 1331 DOOR CLOSER INSTALLATION INSTRUCTIONS WITH JUH (HOLD OPEN) ARMS

CONCEALED VERTICAL ROD PANIC EXIT DEVICE

Build the. Steam Locomotive. Pack 06

Owner s Manual AE PLUG AERATOR MANUFACTURING QUALITY LAWN CARE EQUIPMENT SINCE Made In CHINA REV

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE

Transcription:

P.O. Box 368, 123 Pickle Row, Wautoma, WI 54982 Phone: (920) 787-7010 Fax: (920) 787-7030 www.specialtyspraybooms.com Boom Adjustment Instructions Note: Call service line at 920.240.5218 with questions or for assistance. We are always happy to help. Warning: Boom maintenance and adjustments require proper Personal Protective Equipment and usual precautions used in the maintenance of heavy equipment involving hydraulics, pinch points, and heavy suspended loads. 2 people are required to perform certain adjustments. Contents Y Axis Alignment:... 2 Breakaway Bump Stop:... 4 Secondary Shelf Rest:... 6 Primary/Secondary Fold Cylinder Adjustment:... 8 X Axis Alignment... 9 Bump Stop Y - Axis Shelf rest X- Axis 1 Rev B

Introduction: It is normal for booms to require some slight adjustments after initial installation onto the sprayer. Test Drive: The objective of the test drive is to check that the booms do not have movement at the fold hinge when the booms are completely folded out. This is typically noticeable during turning or going over bumps. Boom Adjustments Boom Adjustments: There are 4 main components of boom alignment. The following diagram illustrates the adjustments in sequence. Y axis alignment Break-away bump stop Secondary shelf rest Fold Cylinder adjustment X axis alignment Y Axis Alignment: Proper Y axis alignment is checked with the boom folded out and the primary is sitting level to the ground in a flat area. The best way to check for straightness in the Y direction is to use the bottom rails for reference looking down the side that hinges. An initial slight slant upwards of the secondary and break-away is the factory setting to compensate for some normal downward movement over time. Figure 1 below is an example of a boom that has settled slightly and needs to have the secondary/breakaway adjusted up using the process described below. See how the red line is sloped down at a different angle from the primary. The frequency of adjustments will depend on field conditions, speed, acceleration/deceleration and sprayer damping characteristics of the center rack. 2 Rev B

Y Direction Adjustments are made using the load bearing jam nut on the top rod end located on the secondary at the fold hinge. Begin making adjustments in 1/4 revolutions of the jam nut and fine tune as necessary. Tightening or threading in the outside jam nut will raise the secondary/breakaway. Adjustments are easiest by taking some pressure off of the secondary by first loosening the non-load bearing jam nut and lifting up with a lifting device (figure 2) or lowering the secondary down onto safe and stable structure. Figure 2: Secondary Lift Point Figure 3: Secondary Rod End used for adjusting secondary/breakaway for proper alignment Load Bearing Non-Load Bearing loosen first Secondary Primary 3 Rev B

Y axis adjustment process Step 1: Loosen non-load bearing jam nut on secondary rod end approximately ¼ using 1-7/8 wrench. Step 2: Take pressure off of load-bearing rod end by either hoisting the secondary several inches using a hoist or forklift or lowering the secondary onto a rest using the sprayer hydraulics. It is best to lift or support the secondary at the end near the breakaway (see figure 2). Step 3: Make initial adjustment starting with 1/4 a revolution of the load bearing jam nut on the top rod end. Turning the load bearing jam nut inwards towards the Heim joint will raise the secondary tip and vice-versa. Step 4: Remove support device to allow the secondary to hang un-assisted and snug non-load bearing jam nut. Check for straightness in Y direction and repeat steps 2-3 as necessary making smaller adjustments if needed for fine tuning. Tighten non-load bearing jam nut when complete. Breakaway Bump Stop: When the boom is folded the breakaway should make contact near the middle of the bump stop (see figure 4) for most booms (top 1/3 for Rogator C-Series 132 booms). This is important so as to not have the breakaway bottom rail catch on the top or bottom of the bump stop and get caught which can cause damage the next time the boom is opened. If the breakaway is too high, be sure to check that the secondary shelf rest is not pushing up excessively (see secondary shelf rest adjustment). Figure 4: Breakaway bump stop Raising/Lowering breakaway bump stop contact position 4 Rev B

If the breakaway is not in the proper location on the breakaway bump stop (figure 4), the position can be raised or lowered by adjusting the 2 rod ends that make up the Heim joint at the primary/secondary fold. To raise the breakaway to contact the bump stop in a higher position, it is necessary to bring the entire secondary end plate closer to the primary end plate by adjusting both the primary and secondary rod ends in an equal amount (keeping plates parallel). The opposite is true to lower the contact location of the bump stop, where now the objective is to move the secondary end plate away from the primary end plate. The adjustment process is similar to that described for the Y axis adjustments, only now both the load bearing jam nuts need to be adjusted an equal amount so the Y axis alignment is not impacted. If care is not taken to adjust the jam nuts an equal amount it may be necessary to re-adjust the Y axis. It is helpful to mark the starting position of both load bearing jam nuts with masking tape and a marker. Figure 5: Rod Ends Green arrows show direction of Jam Nut travel to lower or raise breakaway contact position with bump stop. Load Bearing Non-Load Bearing Lower Raise Primary Secondary Raise Lower Load Bearing Non-Load Bearing Breakaway boom stop position adjustment process Step 1: If the breakaway contact position with the bump stop will need to be adjusted it will be necessary to adjust the shelf rest as well. Prior to adjusting the rod ends, first loosen the shelf rest bracket so it is not making contact with the shelf rest. Step 2: Loosen both non-load bearing jam nuts on secondary rod end and the primary rod end by approximately 1/4. 5 Rev B

Step 3: Take pressure off of rod ends by hoisting the secondary several inches using a hoist/forklift or lowering the secondary onto a rest using the sprayer hydraulics. It is best to lift or support the secondary at the end near the breakaway (see figure 2). Step 4: Mark starting position of load bearing jam nuts. Note: 1 full revolution of each jam nut will equal approximately 3 of boom tip travel. Make initial adjustment starting with ½ a revolution of both load bearing jam nuts in the appropriate direction to either lower or raise (see figure 6). Step 5: Remove support device to allow the secondary to hang un-assisted. Snug up the nonload bearing jam nuts to prevent the rod ends from slipping. Fold up the boom to check for proper position of the breakaway on the bump stop. Set position about 1/8 lower than final desired position as setting final shelf rest position will slightly raise where the breakaway contacts the bump stop. Repeat steps 2-4 as necessary until proper position is attained. Tighten non-load bearing jam nut when complete. Secondary Shelf Rest: The secondary shelf rest should be adjusted such that upon folding the boom closed the skid plate on the secondary makes contact with the front lip of the shelf rest just above the 2 stainless bolt heads used to fasten the UHMW (figure 6). The secondary should gently bump the front lip of the shelf rest and slide easily along the shelf rest and into the cushioned bumper in the final closed position. The initial contact with the front lip is important to deflect energy and slow down the boom when closing. The height of the shelf rest and angle can be adjusted using the 4 mounting bolts on the secondary shelf rest. If the boom has problems closing and opening off of the shelf rest, the height and angle will need to be adjusted so that the secondary skid plate both makes contact with the front lip and slides easily on the shelf rest. The fold hinge design does not have favorable mechanical advantage when fully closed so it is important to have the shelf rest bracket adjusted appropriately. Figure 6: Secondary shelf rest Bumper Secondary shelf rest bolts Contact Position Secondary skid plate 6 Rev B

Step 1: Open booms slightly from closed position. Have second person hold secondary away from primary to allow other person to position shelf rest. Set position such that the secondary skid plate makes initial contact with the lip on the shelf rest just above the 2 stainless bolts as show in figure 6. Tighten shelf rest and slide secondary onto shelf rest. Step 2: Open and close the booms just enough to observe how the skid plate is making contact with the shelf rest. The secondary should slide easily into the cushioned bumper with the shelf rest providing some light resistance. Adjust the angle of shelf rest so that the secondary slides easily into the cushioned bumper. It is common that between 1/2 and a 1.5 gap will exist between the shelf rest lip and skid plate once proper adjustment is attained. Too shallow of angle may result in the hydraulic cylinder struggling to get the secondary off of the shelf rest. Too steep of an angle may result in the secondary sliding off the shelf bracket during abrupt high speed turns. Figure 7: Shelf rest final position 7 Rev B

Primary/Secondary Fold Cylinder Adjustment: It is important to maintain the fold cylinder so that it retracts sufficiently to pull the boom tight and keep the secondary/primary fold firmly together. If movement is observed during operation, it is necessary to adjust. There are two adjustments that can be made to allow the cylinder to retract and tighten the fold hinge. The two methods are to (1) thread the cylinder clevis further into the cylinder rod (figure 8 easiest method), or (2) adjust the double ended Heim joint that connects the hinge arm to the secondary hinge plates so that it is shorter. Figure 8: Fold Cylinder Adjustment Method 1 Jam Nut Rod wrench flats Thread clevis into cylinder if additional retraction is needed to keep boom tight. Step 1: Loosen jam nut on cylinder clevis, then utilize 60 degree offset wrench to turn cylinder rod such that clevis threads further into cylinder rod. Step 2: Push on secondary to in direction of fold to verify there is not movement at the primary/secondary hinge point. Adjust as necessary and tighten jam nut. Figure 9: Method 2 Fold Cylinder Adjustment Method 2 - Double Heim Joint Remove 1 pin and spacers and thread rod end into cylinder if additional retraction is needed to keep boom tight. 8 Rev B

X Axis Alignment The best way to check for straightness in the X direction is to look use the top cap edge on the side of the boom that has the hinge brackets. Figure 10: X Axis Straightness Utilize the stop bolts mounted on the secondary to make necessary adjustments to straighten the boom. Both to top and bottom stop bolts should make contact. In Figure 11 below you can see where the top stop bolt needs to be adjusted out until contact is made. Both stop bolts should make even contact when the boom is straight. Figure 11: Stop Bolts 9 Rev B