Multi-layer Insulation Blanket for

Similar documents
Multi-layer Insulation Blanket for

To Order Superquilt direct at Lowest prices in the UK or Europe UK Customers Call From outside the UK Call

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for use in Roofs

Multi-layer Insulation Blanket for Roofs, Walls & Floors The Highest Performing Certificated MultiFoil on the Market

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

August 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level

June Non - Residential Refurbishment Pitched roofs - rafter level

Pitched roofs rafter level

June Residential Refurbishment Pitched roofs - rafter level

Certificate No: EW560

TRISO-SUPER 10 Installation Guidelines

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

GV Standard Pitchglaze

GV Standard PitchVent

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Acceptable Standards of Domestic Construction

Roll-Fix Kit The complete dry hip kit RFIG

Installation guide. Step-by-step instructions

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

NEW equinox INSTALLATION GUIDE Issue

NEW equinox INSTALLATION GUIDE Issue

Guardian warm roof conversion system. Installation Guide

SUPER-UNDERLAY SHEET

... the reflective insulation!

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Installation Instructions

TECHNICAL BULLETIN 28

The Leka System Installation Guide

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

Dry Verge System. For more information on CEMEX visit

Glidevale eaves ventilation

SpeedDeck. Fixing and Handling Guide

for Flexi Sun Lite Planning the layout

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

ROOFING DESIGN AND FIXING GUIDE

Glidevale eaves ventilation

COLORBOND steel clad. Details for bushfire-prone AS BAL-FZ sites

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

The Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.

for Rigid Sun Lite Planning the layout

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

FIXING GUIDE. Designed for Garages & Sheds, Houses, DIY, Flat Roofs, Industrial & Agricultural Buildings etc. IS THE LONG TERM ROOFING SOLUTION

PROFESSIONAL PITCHED ROOFING ANCILLARIES

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Installation guide for 20/20

AS TESTED TBA FIREFLY TBA FIREFLY BAL-FZ BUSHFIRE ROOF SYSTEM INSTALLATION GUIDE EASY TO INSTALL EASY TO CARRY EASY TO TRANSPORT

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

YWY M08 The new VELUX solution

Installation Guide GRP Dormer

BUILDERS RESPONSIBILITY

Installation Guidelines

Attic Installation Tips:

OptiLiner Banded Liner System Bi-Directional Banding

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

Egger Roofing Board Fast, Easy, Safe: With this board you can reach the top.

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

OptiLiner Banded Liner System Bi-Directional Banding

Inspire Aledora Slate Application Guidelines

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Retrofit OptiLiner Banded Liner System

video 10 YEAR GUARANTEE Durable and lightweight Guaranteed waterproof for 10 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

Insuvent Designed to ensure ventilation in existing roofs when insulation quilts are installed

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

Shingle Installation Guidelines

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

1. Tile Roof Installation:!

Base : (1 - batten spacing, 2 - bottom row batten spacing, 3 - ECOTILE, 4 - batten, 5 - rafter, 6 - fixing method)

Special Roofs and Vertical Slating

Installation manual. novotegra for tiled roofs

4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile

Everbright E610 polycarbonate light panels Installation guidance

Universal Installation Instructions. Preparation and Safety Information. Natural Lighting by Monodraught. Dust. Scaffolding

The better way to build TM. Installation Manual ROOF SIPs

Shingle Installation Guide

Verge Flashing. Verge Flashing. Only use if flashings requirements can be site measured before ordering. Verge Clip

ASSEMBLY INSTRUCTIONS RUUKKI HYYGGE

Three layer Felt Roofing using cold applied adhesive

Item Checklist & Additional Tools Required For Installation

Measuring Timber Pitched Roofs in Accordance with ARM4

technical datasheet Eaves Protector Stainless Steel Polytop Fixings 2 x 600mm Centres Eaves Protector

NAIMA. Insulation Between (filling) Purlins and Over Purlins. What Does Metal Building Insulation Do? Installation Instructions for New Construction

How-To-build guide Garden shed

2 Fibre cement slates fixing guide

orientation Conergy SunTop Instructions for professional installation

Knowledge of SCG Roof Installation

installation guide Villa

SmartVent Eave Edge Installation Instructions

IMAGINATION SOLAR LTD. Installation Guide A1. Planning The Collector Installation

Liniar Window. installation guide

Installation. ng Kitt

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Transcription:

Pitched roof insulation Fully certificated Thermally tested in accordance with EN12667 High thermal resistance of 2.71m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar over-heating barrier Lightweight, thin & flexible Fast and simple installation Vapour control layer Roofs Multi-layer Insulation Blanket for Thermal Insulation in a thin, flexible, multi-layer membrane RD850111 BDA Agrément Nr. BAR 11-346/2 BAR 11-347/2 BAR 11-348/2 194186 www.ybsinsulation.com

INSULATION FOR USE IN ROOFS Benefits Fully certificated Thermally tested in accordance with EN12667 High thermal resistance of 2.71m²K/W Effective solar over-heating barrier Effective in summer and winter Lightweight, thin & flexible Fast and simple installation Tear Resistant For pitched roofs 18 O or above is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN12667 achieving a high thermal resistance of 2.71m²K/W for accompanied by a 25mm air cavity either side of the material. How does Work? Due to the special composition of multi-layers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infra-red radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer, is a very effective solar over-heating barrier reducing the need for artificial cooling systems, preventing uncomfortable build up of heat in the building. General Fixing Instructions Installation of for pitched roof applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. must be installed with a 50mm overlap with all joints taped with YBS 75mm foil tape. can be cut with a craft knife or a sharp pair of scissors. can be easily fixed with staples at regular intervals. Minimum 14mm stainless steel or galvanised staples are recommended. is most effective with a minimum 25mm air gap on either side. Battens can be used to create this gap. No protective clothing/handling required Page 1

Under Rafter Application - Non-permeable Membrane & Fixing Instructions Combined Method (W/m 2 K) 0.15 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten & Counter Batten 50.00 - - Roofing Felt 3.00 - - Sarking Board 18.00 - - Vented Rafter Cavity 50.00-0.100 100.00 0.022 4.545 Rafter/Batten Cavity Batten Cavity 65.00-2.71 Plasterboard 12.50 0.190 0.066 Inside Surface - - 0.100 Total Resistance 7.561 *See installation video at www.ybsinsulation.com Installation of for under rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape.Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. Perpendicular battens, recommended 25mm by 38mm are fixed to the rafters. Battens must always be fixed around the perimeter of windows. The plasterboard is fixed over the and onto the battens in the usual manner. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) and 110mm (0.022 W/mk) and 170mm Glasswool (0.040 W/mK) and 140mm (0.022 W/mk) and 220mm Glasswool (0.040 W/mK) Description (rafters at 600mm centres) and 100mm (0.022 W/mk) and 160mm Glasswool (0.040 W/mK) and 130mm (0.022 W/mk) and 210mm Glasswool (0.040 W/mK) Page 2

Under Rafter Application - Permeable Membrane & Fixing Instructions Combined Method (W/m 2 K) 0.15 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten & Counter Batten 50.00 - - Breather Membrane - - - Sarking Board 18.00 0.143 0.125 Rafter Cavity 50.00-0.274 90.00 0.022 4.091 Rafter/Batten Cavity Batten Cavity 65.00-2.71 Plasterboard 12.50 0.190 0.066 Inside Surface - - 0.100 Total Resistance 7.293 *See installation video at www.ybsinsulation.com Installation of for under rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape.Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. Perpendicular battens, recommended 25mm by 38mm are fixed to the rafters. Battens must always be fixed around the perimeter of windows. The plasterboard is fixed over the and onto the battens in the usual manner. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) and 100mm (0.022 W/mk) and 160mm Glasswool (0.040 W/mK) and 130mm (0.022 W/mk) and 210mm Glasswool (0.040 W/mK) Description (rafters at 600mm centres) and 90mm (0.022 W/mk) and 150mm Glasswool (0.040 W/mK) and 120mm (0.022 W/mk) and 200mm Glasswool (0.040 W/mK) Page 3

Two Layer Application Two Layers (600mm Centres) ROOF COVERING (TILES SHOWN) Combined Method (W/m 2 K) 0.15 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Outside Surface - - 0.040 Slate / Tile 10.00 - - Batten & Counter Batten 50.00 - - Roofing Membrane - - - Sarking Board 18.00 Rafter Cavity Rafter Cavity Batten Cavity 125.00-4.929* Insulated Plasterboard 40.00-1.070 Inside Surface - - 0.100 Total Resistance 5.419 * Calculated to include timber bridging BATTEN OR STAPLE RAFTERS *See installation video at www.ybsinsulation.com PERPENDICULAR BATTEN INSULATED PLASTERBOARD Fixing Instructions Installation of for under rafter applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. For recessed installation please see page 5. For under rafter installation please see page 2/3 fixing instructions. When installing two layers of an air space should be maintained between layers at all times. table All calculations are based on 50mm rafters. For individual calculation please contact the technical team on 0871 917 0044 Description (rafters at 400mm centres) (2 Layers) with 55mm (0.022 W/mk) (2 Layers) and 25mm (0.022 W/mk) (2 Layers) and 50mm Glasswool (0.044 W/mK) (2 Layers) and 40mm insulated plasterboard (1.070 m 2 k/w) Description (rafters at 600mm centres) (2 Layers) with 50mm (0.022 W/mk) (2 Layers) and 25mm (0.022 W/mk) (2 Layers) and 50mm Glasswool (0.044 W/mK) (2 Layers) and 40mm insulated plasterboard (1.070 m 2 k/w) Page 4

Recessed Detail over rafter under rafter application ROOF COVERING (TILES SHOWN) BREATHER MEMBRANE ROOF COVERING (TILES SHOWN) ROOFING FELT ON TOP OF RAFTERS A B BATTEN OR STAPLE PLASTERBOARD AND FINISH C D RAFTERS INSULATION JOINTS YBS FOIL TAPED Where roof height is critical can be recessed between the rafters. A. is stapled to the top of the first rafter. B. is recessed into the rafter void and fixed with staples or with battens. C. The material is then fixed to opposite rafter as per instruction B. D. is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil Tape. A breather membrane is then fitted in accordance with the manufacturers fitting instructions. Tile batten and tiles can then be fitted. 1 2 3 BATTEN OR STAPLE PLASTERBOARD AND FINISH 4 RAFTERS INSULATION JOINTS YBS FOIL TAPED Ensure that there is an airspace above the at all times. 1. is stapled to the underside of the first rafter. 2. is recessed into the rafter void and fixed with staples or with battens. 3. The material is then fixed to opposite rafter as per instruction 2. 4. is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil tape. Plasterboard can then be fixed directly to the underside of the rafters below the. Purlins Detail Between purlins Around purlins ROOF COVERING (SLATE SHOWN) ROOF COVERING (SLATE SHOWN) BREATHER MEMBRANE ROOFING FELT RAFTER RAFTER INSULATION JOINTS YBS FOIL TAPED INSULATION JOINTS YBS FOIL TAPED PLASTERBOARD & FINISH PLASTERBOARD & FINISH PERPENDICULAR 25MM BATTENS PERPENDICULAR 25MM BATTENS PURLIN PURLIN is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is turned up at stapled in place. Perpendicular Battens are fixed through the into the rafters, at the purlins the battens are fixed into the rafters crushing the tightly against the purlins. Plasterboard can then be fixed to the battens. Page 5 is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is cut and pushed behind the purlins then taped to the next piece at the opposite side of the purlin. Perpendicular Battens are fixed through the into the rafters. Plasterboard can then be fixed to the battens.

Detailing Vents / light-pipes Flashing Rooflight Collar/Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Rooflight Frame Flashing Tiles/Slate Tile/Slate Batten Breather Membrane Counter Batten Counter Batten Counter Batten Rafter Rafters Rafters Fixing Instructions is fixed above rafters as per fixing details and turned up at the vent/wall/rooflight and sealed with YBS Foil Tape. Battens are placed on the rafters above the. A breather membrane is fixed above the battens and finished by turning up at the vent/wall/rooflight and sealing to the vent/wall/rooflight. Tile battens are fixed in place. The flashing/collar for the vent/wall/rooflight is fitted above the tile battens and then tiles. Eaves Tiles Battens Counter Battens Foil Taped Joints Breather Membrane Rafter Plasterboard Timber Wallplate Over Rafter Fixing Details is stapled to the rafters. At the eaves the is cut and taken down between the rafters to the cavity wall insulation or the wall plate. The needs to be sealed with staples and taped to the rafters and the cavity wall insulation or wall plate to create an airtight envelope. Under Rafter Fixing Details is stapled to the underside of the rafters. At the eaves the is cut and taken down between the joists to the cavity wall insulation or the wall plate. The material needs to be sealed with staples and taped to the joists and the cavity wall insulation or wall plate to create an airtight envelope. Valleys Tiles Tile Battens Felt Membrane Counter Battens Mortar Pointing Downlighters YBS recommend fire hoods are used with all sunken lights. Lead Gutter Rafters Perpendicular Battens Plasterboard Page 6 A circular hole is cut in the to create a minimum 25mm clearance from the downlighter. The cut edge must be completely sealed using YBS Foil Tape.

Product Description 19 Components Thickness Technical Properties 40mm approx. Weight 88 0g/m 2 Mechanical Properties Value Reference Standard Thermal performance 2.71m 2 K/W BS EN 12667 Flammability Class 1 BS 476-1 Class E BS EN 13501-1 Water vapour resistance 1569MNs/g BS EN 12572 Emission coefficients of surfaces 0.05 ASTM C 1371 Tensile strength 142KPA BS EN 1608 Packaging 15m 2 10m 2 Width 1.5m 1.5m Length 10m 6.667m Weight 13.5Kg 9Kg Foil taped joins should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using YBS 75mm Foil Tape. Vapour control layer When all joints are sealed using foil tape also works as a vapour control layer. knife available YBS Foil joining tape available Yorkshire Building Services (WHITWELL) Ltd Crags Industrial Park, Morven Street, Creswell, Derbyshire, S80 4AJ Tel: +44 (0) 844 99 100 44 Fax: +44 (0) 844 99 100 55 E-Mail: sales@ybsinsulation.com Web: www.ybsinsulation.com Yorkshire Building Services (WHITWELL) Ltd. Page 7 YBS 360 V02 10/2011