Arc welding Control for Shaped Metal Deposition Process

Similar documents
University of Catania DIEEI

Development of Orbital TIG Welding Robot System for the Pipe

Chapter 5. Tracking system with MEMS mirror

Increasing arc length Current [A]

New generation of welding and inspection systems

Michael Hummer Fronius International GmbH Froniusplatz Wels NEW DEVELOPMENTS IN ARC TECHNOLOGY

COMPARISON OF TUNING METHODS OF PID CONTROLLER USING VARIOUS TUNING TECHNIQUES WITH GENETIC ALGORITHM

Manufacturing Process - I Dr. D. K. Dwivedi Department of Mechanical and Industrial Engineering Indian Institute of Technology, Roorkee

New Arc-welding Robots

MV SERIES MV6 / MV6L / MV16 ARC WELDING AND HANDLING ROBOTS

IMPLEMENTATION AND DESIGN OF TEMPERATURE CONTROLLER UTILIZING PC BASED DATA ACQUISITION SYSTEM

Rapid and precise control of a micro-manipulation stage combining H with ILC algorithm

Autonomous Stair Climbing Algorithm for a Small Four-Tracked Robot

A Real-Time Regulator, Turbine and Alternator Test Bench for Ensuring Generators Under Test Contribute to Whole System Stability

Improved direct torque control of induction motor with dither injection

Image Processing and Particle Analysis for Road Traffic Detection

S-SPEEDPULSE XT SERIES

SELF-BALANCING MOBILE ROBOT TILTER

Addendum Handout for the ECE3510 Project. The magnetic levitation system that is provided for this lab is a non-linear system.

Digital Control of MS-150 Modular Position Servo System

A Short History of Using Cameras for Weld Monitoring

The PID controller. Summary. Introduction to Control Systems

A CMOS Visual Sensing System for Welding Control and Information Acquirement in SMAW Process

Implementation of decentralized active control of power transformer noise

Disturbance Rejection Using Self-Tuning ARMARKOV Adaptive Control with Simultaneous Identification

Oroville Union High School District Industrial Technology

The Feedback PI controller for Buck-Boost converter combining KY and Buck converter

Near Infrared Face Image Quality Assessment System of Video Sequences

Design of an Intelligent Pressure Control System Based on the Fuzzy Self-tuning PID Controller

More Info at Open Access Database by S. Dutta and T. Schmidt

DEVELOPMENT OF A HUMANOID ROBOT FOR EDUCATION AND OUTREACH. K. Kelly, D. B. MacManus, C. McGinn

Weld gap position detection based on eddy current methods with mismatch compensation

PID-CONTROL FUNCTION AND APPLICATION

ENGG4420 END OF CHAPTER 1 QUESTIONS AND PROBLEMS

Figure 1.1: Quanser Driving Simulator

CHAPTER 5 CONTROL SYSTEM DESIGN FOR UPFC

CHAPTER 6 DEVELOPMENT OF A CONTROL ALGORITHM FOR BUCK AND BOOST DC-DC CONVERTERS USING DSP

Cohen-coon PID Tuning Method; A Better Option to Ziegler Nichols-PID Tuning Method

Process: DC TIG (GTAW) AC TIG (GTAW) Input Power: 230V, 1-Phase Amperage Range: A Rated Output at40 C (104 F): Maintenance and Repair

STC-205Di. Quick. Specs. For TIG, Plasma and Stick Welding A combo machine for arc welding and plasma cutting

MAGNETIC LEVITATION SUSPENSION CONTROL SYSTEM FOR REACTION WHEEL

H. B. Smartt K. L. Kenney C. R. Tolle. 6 th International Conference on Trends in Welding Research

Relay Based Auto Tuner for Calibration of SCR Pump Controller Parameters in Diesel after Treatment Systems

-binary sensors and actuators (such as an on/off controller) are generally more reliable and less expensive

Control of Single Switch Inverters

Finishing first how automated systems improve the productivity and repeatability of wafer lapping and polishing

Swinburne Research Bank

VECTOR CONTROL SCHEME FOR INDUCTION MOTOR WITH DIFFERENT CONTROLLERS FOR NEGLECTING THE END EFFECTS IN HEV APPLICATIONS

Trade of Sheet Metalwork. Module 7: Introduction to CNC Sheet Metal Manufacturing Unit 2: CNC Machines Phase 2

Open Access Design of Diesel Engine Adaptive Active Disturbance Rejection Speed Controller

International Journal of Scientific & Engineering Research, Volume 5, Issue 6, June ISSN

Hardware Implementation of an Explorer Bot Using XBEE & GSM Technology

DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS

16. Sensors 217. eye hand control. br-er16-01e.cdr

Simple Feedback Structure of Active Noise Control in a Duct

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS

AN EXPERIMENTAL INVESTIGATION OF THE PERFORMANCE OF A PID CONTROLLED VOLTAGE STABILIZER

of harmonic cancellation algorithms The internal model principle enable precision motion control Dynamic control

Modeling and Control of Liquid Level Non-linear Interacting and Non-interacting System

DESIGN OF INTELLIGENT PID CONTROLLER BASED ON PARTICLE SWARM OPTIMIZATION IN FPGA

Module 4 Design for Assembly IIT BOMBAY

Lecture 8: More on Operational Amplifiers (Op Amps)

Conductance switching in Ag 2 S devices fabricated by sulphurization

DSP-Based Simple Technique for Synchronization of 3 phase Alternators with Active and Reactive Power Load Sharing

TRIALLIANCE FABRICATING: Mertztown, PA Job #2

IMAGE ANALYSIS BASED CONTROL OF COPPER FLOTATION. Kaartinen Jani*, Hätönen Jari**, Larinkari Martti*, Hyötyniemi Heikki*, Jorma Miettunen***

Robot Autonomous and Autonomy. By Noah Gleason and Eli Barnett

Glossary of terms. Short explanation

Power Mode TM PROCESS PROVIDES STABLE ARC WELDING ON THIN MATERIALS MAKES ALUMINUM WELDING MORE FORGIVING

IMPLEMENTATION OF NEURAL NETWORK IN ENERGY SAVING OF INDUCTION MOTOR DRIVES WITH INDIRECT VECTOR CONTROL

Spacecraft Pitch PID Controller Tunning using Ziegler Nichols Method

ME375 Lab Project. Bradley Boane & Jeremy Bourque April 25, 2018

Control system for reducing weld spatter during the welding process by using high-speed visual sensing

Lecture 18 Stability of Feedback Control Systems

MECHATRONICS IN BIOMEDICAL APPLICATIONS AND BIOMECHATRONICS

ARCMASTER. 401MST Multi-Process Inverter Power Source Part No. W

Multi-Resolution Estimation of Optical Flow on Vehicle Tracking under Unpredictable Environments

Design Applications of Synchronized Controller for Micro Precision Servo Press Machine

Chapter 3 : Closed Loop Current Mode DC\DC Boost Converter

PID Controller Design for Two Tanks Liquid Level Control System using Matlab

Automatic gauge control (AGC)/

Research Article Compact Dual-Band Dipole Antenna with Asymmetric Arms for WLAN Applications

RECENT ADVANCEMENTS IN THE APPLICATION OF EMATS TO NDE

Thermo Scientific icap 7000 Plus Series ICP-OES: Innovative ICP-OES optical design

A SOFTWARE-BASED GAIN SCHEDULING OF PID CONTROLLER

Description of AVC/ seam tracking for TIG welding

DESIGN IMPLEMENTATION AND ANALYSIS OF AUTOMATIC BURR REMOVAL IN A FIXTURE TOOL

Key-Words: - Neural Networks, Cerebellum, Cerebellar Model Articulation Controller (CMAC), Auto-pilot

CHAPTER 6. CALCULATION OF TUNING PARAMETERS FOR VIBRATION CONTROL USING LabVIEW

Behaviour-Based Control. IAR Lecture 5 Barbara Webb

Wheeled Mobile Robot Kuzma I

Converting Motion between Different Types of Humanoid Robots Using Genetic Algorithms

Enabling cutting of Reflective Materials with Back Reflection protection

Analysis and Design of Autonomous Microwave Circuits

Design of PID Control System Assisted using LabVIEW in Biomedical Application

EXPERIMENTAL OBSERVATIONS OF THE LASER KEYHOLE WELDING PROCESS OF AA

Performance Analysis of Conventional Controllers for Automatic Voltage Regulator (AVR)

Stabilize humanoid robot teleoperated by a RGB-D sensor

Effective Formulation of the DTC Strategy for Convergence and Stability Analysis The IPM Motor Drive Case Study

MEM380 Applied Autonomous Robots I Winter Feedback Control USARSim

Transcription:

Arc welding Control for Shaped Metal Deposition Process F. Bonaccorso*, L.Cantelli*, G. Muscato* *DIEEI, University of Catania, Catania, Italy (giovanni.muscato@dieei.unict.it) Abstract: This paper is focused on the study and the control of a deposition process of robotic arc welding. The process consists of a SMD (Shaped Metal Deposition) system, that is a novel rapid prototyping tungsten inert gas (TIG) welding technique leading to near-net-shape, using a layer by layer deposition technique. An experimental setup has been properly implemented in order to study the system and to develop and tune the parameters of an automatic controller. Keywords: Industry Automation, Welding Control, Rapid Manufacturing, Control Applications, Industrial production systems, Industrial robots. 1. INTRODUCTION SMD is an innovative manufacturing process patented by Rolls-Royce; it was developed to produce mechanical parts directly from a CAD model. The work presented has been carried out in the frame of the RAPOLAC European project (www.rapolac.eu) focussed on the SMD process. One of the advantages of the process is the substantial reduction of inventory costs, since the only inventory held is wire. As matter of this, the parts could be built to order. The innovative aspect of the SMD process is a reversed production philosophy. Up to now, the traditional manufacturing methods, such as machining, are based on the material removing from the work piece, in order to obtain a desired final shape. There are several evident drawbacks in this process, like the large waste of material in scraps and the consequent increase of the costs, depending of the material used. The SMD process works by adding progressively the material to the final workpiece up to obtain the desired shaped component. This is achieved by adding the material required layer by layer, as shown in Fig 1. In this way no process scraps are produced minimizing the material used to the strictly amount required by the final work piece shape (Hensinger et al. 2000, Zhang et al. 2003). Another significant advantage is reduction of 60% in the lead-time necessary to produce the parts so that it is ideal for use in prototype production as well as in manufacturing. Finally microstructure analysis of produced parts confirms that there are no disadvantages from the quality point of view (Baufeld et al. 2010). Several works related to arc welding could be found in literature. However no one concern concrete implementations of control strategies on deposition processes. The papers Bonaccorso et al. 2009, Muscato et al. 2008 and the work presented here are the first, as far as we know, dealing with the study and the control strategies for such a process. An actual drawback of the process is the need of an operator constantly monitoring and manually acting on the welding process parameters. As a matter of this, one of the aims of the RAPOLAC project is focused on the study of an automatic control system. In this paper the obtained progress is presented. The paper is organized as follows. Section 2 describes the experimental setup. Section 3 introduces the control law developed while. Section 4 shows the experimental results. Conclusions are reported in section 5. Fig. 1. A schematic representation of the SMD deposition process. 2. THE EXPERIMENTAL SETUP 2.1 The Hardware architecture An experimental system has been properly implemented in order to study the system and to develop and test an automatic controller. Copyright by the International Federation of Automatic Control (IFAC) 11636

The plant has been set up with a six axis industrial welding robot, and a 500A TIG inverter, as is shown in Fig. 2. SMD process prescribes using of a sealed chamber with 99.999% purity argon. However such a chamber has not been used doing this work because of the target, in this case, was the control system, without taking too much attention to the quality of the final pieces. The implemented system uses different kind of sensors and a software interface. In particular the operator can monitor in real time the welding machine status (digital data, error code), the principal welding parameters time series like the actual arc voltage and both the imposed and the actual wire feeder rate, from the welding machine, the various sensors time series and the actual torch position that is given by the robot controller. The interface also permits to change all the main parameters of the welding machine: wire feeder rate, current, etc. and to set the controller parameters. In particular, the SMD plant has been equipped with a pyrometer and a thermo camera, for analysing both the temperature distribution and the heating and cooling rate over the time during the deposition process. The monitoring system also comprises a welding camera, IR sensors and a microphone. Fig. 3. Process architecture block diagram of the arc welding SMD. Fig. 2. The arc welding plant for performing SMD using stainless steel 316. 2.2 The Software architecture The block diagram of the architecture used is shown in Fig. 3. It is mainly based on the NI Labview real time target architecture. The interface developed within the NI Labview is shown in Fig. 4; there are several windows and buttons that allow to examine and to change all the parameters of the process. It should be observed that, even if one of the final aims of the RAPOLAC project is to make the SMD process autonomous, in the developing phases the intervention of the operators is fundamental. As a consequence, it is very important to have an user-friendly interface to the process which allows to monitor all the variables and, if needed, to change in real time the process parameters. Fig. 4. Main interface of the control system for the arc welding SMD. This interface permitted to deeply study many features of the SMD process allowing thus to implement and test the right working parameters of this complex system. 3. THE SMD PROCESS CONTROLLER 3.1 Control strategy summary Several tests have been performed in order to study the behaviour of the process. The working variables needed for the control have been identified in four fundamental key parameters: the heat source provided to the process (arc current: I), the injected material mass rate (indicated by the Wire Feeder Rate: WF), the torch speed (indicated by the 11637

Travel Speed: TS) and the thickness imposed for each layer (indicated by the step height between two subsequent layers: SH), as indicated in Fig. 1. As it is reported in Bonaccorso et al. 2009 and Muscato et al. 2008 the four parameters act on the dimensions, thickness and width, of the final workpiece. The basic idea for setting up an automatic controller is to measure the amount of material deposited on each layer h (see Fig. 1). This amount must be equal to the step height imposed for the process, in order to avoid depositing too much or too few material, causing the system to become unstable. Consequently the height of the material deposited h should converge to the prefixed step height SH. According to these information, the wire feeder rate (WF) must be controlled in order to adapt the incoming material mass for each layer. measured directly, owing to the particular operative conditions. However another aspect of process like the torch height from the bead, gives indirect information about the material deposited. There are even different aspects of the process that can be used to measure the gap which are all directly connected to the arc physics such as the arc emitted light (Moore et al. 2009, Tzyh-Jong et al. 2007, Zhang 2001), the arc emitted sound (Sciaky et al. 1966, Ralchenko et al. 2008, Tham 2005) and the arc voltage as shown in Fig. 5. A good alternative is a vision system (camera, optics, filters): using image processing technique, the arc length estimation can be performed with an optimal level of efficiency (Fig. 6). Fig. 6. Vision system for arc length estimation. Several tests have been performed in order to characterize the vision system and to relate the arc length estimation with the arc voltage measurement. Fig. 5. Arc length measurement. So the layer height is a key-role parameter of the process and, moreover, is key-role parameter for the different control strategies investigated. But this parameter is not simple to be Using the relation in Fig.7 it is possible to directly match the two time series. As showed in Fig. 8, although the both signals must be opportunely filtered, the arc voltage appears more disturbed, especially when the arc is short. 10 9 y = 1.7451*x - 16.908 8 7 Arc Length [mm] 6 5 4 3 2 1 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 Arc Voltage [V] Fig.7 Experimental results: linear relation between arc voltage and arc length estimation. 11638

10 9 8 7 Arc Length [mm] 6 5 4 3 2 Rescaled Arc Voltage Arc Length 1 50 100 150 200 250 300 350 400 450 500 Time [sec] Fig.8 Experimental results: comparison between rescaled arc voltage and arc length estimation time series. The control strategy is then implemented as described by the following equation: WF = f I, WF, V V ) (1) ( ref Fig.9 Image processing to estimate arc length: preliminary results. Fig.9 shows the arc length measurement performed during a cylinder deposition. The oscillation of the measure is due to no use of rotating table that causes the continuous variation of welding pool orientation. The example described shows one of the actual limits of the vision system. Furthermore the environmental condition of the Tig welding process is critical (in term of higher values of temperature and brightness). These particular conditions imply the use of sophisticated systems in terms of both hardware and software. Since the vision algorithm refinement process is still in progress, actually it cannot be successfully used as feedback. Although also the video feedback, the arc emitted light and sound are investigated, the arc voltage is the parameter that permits in the simplest manner to evaluate the gap. The arc voltage is the most used parameter to measure the arc length so that all welding machines usually have an output referred to the arc voltage. 3.2 The Control Law Once defined an arc voltage reference corresponding to a certain gap, an error on the arc voltage value can be interpreted as an erroneous position of the bead below and consequently an erroneous value of wire feeder rate. The wire feed rate WF represents the value corresponding to the stable process working point, in which all the material coming from the wire feeder is deposited in each layer, ensuring the stability of the process. This value is strictly connected to the value of the other parameters: amperage, travel speed and desired step height. I represents the arc current and the V-V ref is the arc voltage error. The function can be a simply linear proportional action, as showed in Fig 7 or more complex solution that permit to take into account the previous layer deposition error. WF WF V-Vref Fig. 7. The linear control strategy characteristic adopted by the controller. 4. EXPERIMENTAL RESULTS The different control solutions have been performed producing from simpler pieces to more complex structures, using a rotating table as support (Fig 8). The several trials performed in order to test the SMD controller have achieved very good performance. The trial reported in this paper regards a fundamental comparison between a deposition performed using the SMD automatic controller and the same one performed manually by an operator. The test consists in a deposition of 40 layers Cylinder Ti-6Al-4V in air. 11639

Fig. 8. Various structures deposited (the last one using a 2 axis rotating table). Fig. 9. Manual: arc voltage and wire feed rate time series. Fig. 10. Control: arc voltage and wire feed rate time series 11640

Fig. 11. Manual vs. Control test In Fig. 9 and 10 the arc voltage and wire feed rate time series are shown. As can be highlighted from Fig. 9, during the manual test the operator has to manually correct the wire feed rate several times. In the other case (Fig. 10), the controller tunes the wire feeder rate automatically reaching a steady state condition so that the process can be leaved unattended. The two structures are shown in Fig 11. 5. CONCLUSIONS The proposed system has been adopted in many different trials to study the process, to get the best working conditions and the tuning parameters for the controller. The interface has been also really useful to monitor the process during the experiments, allowing to check in real time most of the parameters and to monitor the outputs. Different control strategies were investigated. All make use of information coming from different measurements subsystems, in particular using a welding voltage feedback. The developed controller permits to maintain the process stability condition, so that the process results totally automatic. The control strategy that has been presented in this work is also part of a patent deposited. 6. ACKNOWLEDGEMENT The work presented in this paper has been carried out in the frame of the RAPOLAC EC project (www.rapolac.eu AST5-CT-2006-030953), so the ultimate purpose is to develop the control strategy for the TIG arc welding machine. This financial support is gratefully acknowledged. Prototyping Syste. San Francisco, CA: Proceedings of the 2000 IEEE International Conference on Robotics & Automation. Moore D.S., Naidu S. and Ozcelik K.L. (2003) Modeling, Sensing and Control of Gas Metal Arc Welding Elsevier. Muscato G., Spampinato G. and, Cantelli L. (2008) A Closed Loop Welding Controller for a Rapid Manufacturing Process Hamburg: Proceedings of the ETFA 2008, 13th IEEE Conference on Emerging Technologies & Factory Automation. Ralchenko Yu., Kramida A.E., Reader J., and NIST ASD Team (2008). NIST Atomic Spectra Database (version 3.1.5). Online] National Institute of Standarda and Technology. [Cited: 08 06, 2008.] http://physics.nist.gov/asd3. Sciaky C.A. and Johnson A.M. (1966) System For Controlling Length Of Welding 3236997 US. Tzyh-Jong Tarn, Shan-Ben Chen, Changjiu Zhou, (2007) Robotic Welding, Intelligence and Automation : Lecture Notes in Control and Information Sciences, Vol. 362.A Tham J. (2005) Methods of Characterizing Gas-Metal Arc Welding Acoustics for Process Automation University of Waterloo. Zhang P. J. and Li Y. M. (2001) Precision Sensing of Arc Length in GTAW Based on Arc Light Spectrum, Transactions of the ASME, p. Vol. 123. Zhang Y., et al. (2003) Weld deposition based rapid prototyping: a preliminary study, Journal of Materials Processing Technology, Vol.135, pp. 347 357. REFERENCES Baufeld B., Van der Biest O., Gault RS., (2010), "Additive manufacturing of Ti 6Al 4V components by shaped metal deposition: Microstructure and mechanical properties", Journal of Materials and Design, Vol 31, pp 106-111 Bonaccorso F., Bruno C., Cantelli L., Longo D., Muscato G., (2009) A Modular Software Interface for the Control System of an Arc Welding Robot 2nd International Conference on Human System Interaction. Hensinger D. M., Ames A. L. and, Kuhlmann J.L. (2000) Motion Planning for a Direct Metal Deposition Rapid 11641