HC Precast System ( 100 % Malaysia Technology With 6 IPs ) IBS Concept

Similar documents
WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1

HC Precast System ( 100 % Malaysia Technology With 6 IPs )

Double Storey HC Precast System Drawing - 3D

IBS IS A SYSTEM NOT A MACHINE significantly difference from traditional cast in-situ construction which relies heavily on customized site work


NATIONAL INNOVATION AND CREATIVE ECONOMY EXPO 2017 (NICE 17) TECHPITCH - HC PRECAST WALL PANEL - 13 th OCTOBER 2017

IBS SCORING IN MALAYSIA

Presentation at Show Unit : IBS Sequence of Work

SECTION COUNTERTOPS ecox PART 1 GENERAL

Precast Multistorey Highrise Residential & Commercial Buildings. Buildings & Factories IC

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Total Precast Concrete Structures

RAPID CONSTRUCTION-INOVATIVE APPROCH OF PREFABRICATED CONSTRUCTION

SECOND CONSTRUCTION TECHNOLOGY FORUM CONSTRUCTION FOR SUSTAINABILITY

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

TOTAL PRECAST. A sensible way to build

Precast Concrete Industry Extensions for Autodesk Revit Structure 2014

NZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

PRECAST CONCRETE STRUCTURES

PRECAST FLOOR PRODUCTION SEMI - PRO - EDGE

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

Architectural Precast Concrete Presentation May 2009

Abu Dhabi (Head Office) Dubai: Iraq:

CE2045-PREFABRICATED STRUCTURES QUESTION BANK

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRECAST TO LAST. S C Lam, K C Chung and S W Sham Hong Kong Housing Department

Proven precast solutions for every application

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture

3400 Tectura Designs Precast Concrete

SUBSTATION SECURITY WALL INSTALLATION MANUAL

This specification describes the minimum requirements for structural steel drawings.

CASE STUDY: 4,100 PRECAST VILLAS AT AL FALAH. Presented by: MAX E. JORDAN Fluor Mideast Limited Date: 15 MAY 2012

PRECAST WALL PRODUCTION SEMI - PRO - EDGE

Cooke Precast Concrete

Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

Product Guide Specification

Ridgeguard Standard O&M Manual

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

SUSTAINABLE CONSTRUCTION IN HONG KONG DEMONSTRATION PROJECT IN FU TEI

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Hyper ArmourMate. Joint Edge Protection INDUSTRIAL SLAB ON GROUND

Precast Concrete Pavement

Breadth: Change CIP Structural Walls and Beams to Precast

Five Star Panel Installation Instructions

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

WEB-BASED QUALITY CONTROL OF PRECAST CONCRETE

WestEnd25. Final Report. Exterior Façade: Building Façade History:

SECTION BULLET- RESISTANT DOORS

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground

Installation Manual. Last Updated 4 February, Postal PO Box 932 Bayswater VIC

Diamond Dowel. Load Transfer System INDUSTRIAL SLAB ON GROUND

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

Cooke Precast Concrete

MAHALAKSHMI ENGINEERING COLLEGE TIRUCHIRAPPALLI DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK UNIT I - INTRODUCTION

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

1. Architectural precast concrete cladding units.

SECTION PRECAST CONCRETE STRUCTURES

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

Cooke Precast Concrete

INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

Lumicor CSI Specification Guide Open Format Section Solid Polymer Fabrication

General Layout. Eng. Maha Moddather

ARCHITECTURE CADD Course Syllabus

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

COLUMN 11/2013 LINEAR STRUCTURAL ELEMENT

Designing Precast Concrete School Buildings

SECTION WOOD DOORS

GOLDEN RULES FOR EASIFIX INSTALLATION

Presentation on Holistic Approach to Precast Concrete Construction

GETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE. Designer s NOTEBOOK T N U I N

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Technology Symposium Concrete Technology Iran Conmin 2016 in Teheran

Architectural Precasters Design Assist Role

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

Unit 8 Precast Concrete

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA

Benefits and Advantages

PREFOAM - PERMANENT STADIUM SEATING RISER SYSTEM FOR FLOOR MONTED SEATING PART 1 GENERAL DESCRIPTION

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

Solid Surface Countertops

SECTION Display Case Door Series 1301-CM

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz

Challenges for productivity and industrialized Construction Bmst. Ing. Martin Dobler Austria

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Estates Development & Projects

Pipe Product Catalog Table of Contents

JVI Vector Connector

SECTION SWINGING AUTOMATIC ENTRANCES

ARCHITECTURAL DESIGN REVIEW: CHECKLIST FOR ARCHITECTS

Chapter 7 - Porch Framing

SECTION PRE-MANUFACTURED CABINETS

WE USE WISCONSIN SEASONED NATURAL PINE LOGS The Woody is insulated to tame the most ferocious wind and weather

Guide Specification Section Interior Suspended Sliding Glass Doors

Transcription:

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Economical. Eco Friendly. Quality IBS Concept In the construction of a building, there are always 4 types of joint namely L-shape T-shape Cross shape Straight joint Modular shear keys ( wet joint ) No leaking & No crack

IBS CONCEPT 1. Precast elements requirements to complete a building is sequence of work - 5 Steps i ) Step 1 - Drawing conversion : 1.1 ) 2D Architect drawing to 3D IBS system drawing 1.2 ) Original M&E drawing to M&E IBS system shop drawing ii ) Step 2 - Mould fabrication iii ) Step 3 - Production ( advance casting ) iv ) Step 4 - Delivery ( 4 options ) v ) Step 5 - Installation ( numbering ) Decide by client Production speed 2. Precast element comply to the code & building by law - Precast elements must not involve many different manufactured components 3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

i ) Step 1 - Drawing conversion : 1.1 ) 2D Architect drawing to 3D IBS system drawing Original Architect drawing 2D

i ) Step 1 - Drawing conversion : 1.1 ) 2D Architect drawing to 3D IBS system drawing Original Architect drawing 2D

i ) Step 1 - Drawing conversion : 1.1 ) 2D Architect drawing to 3D IBS system drawing IBS system drawing 2D

i ) Step 1 - Drawing conversion : 1.1 ) 2D Architect drawing to 3D IBS system drawing IBS system drawing 2D

i ) Step 1 - Drawing conversion : 1.2 ) Original M&E drawing to M&E IBS system shop drawing Original M&E drawing

i ) Step 1 - Drawing conversion : 1.2 ) Original M&E drawing to M&E IBS system shop drawing Original M&E drawing

i ) Step 1 - Drawing conversion : 1.2 ) Original M&E drawing to M&E IBS system shop drawing Dimension for : 1. Light & Fan point 2. Power point 3. Switch point 4. Tel & MATV point to be fill & confirm by consultant M&E IBS system shop drawing ( Subject to client / consultant confirmation )

i ) Step 1 - Drawing conversion : 1.2 ) Original M&E drawing to M&E IBS system shop drawing Dimension for : 1. Sanitary fitting & plumbing to be fill & confirm by consultant M&E IBS system shop drawing ( Subject to client / consultant confirmation )

ii ) Step 2 - Mould fabrication Received tiling work Designed by you Coping one cast Chequer plate (received tiling) L shape panel Door opening Half slab

iii ) Step 3 to 5 Decide by client - Production speed Step 3 - Production ( advance casting ) - 7 to 9 units single storey per day - Quality control & Assurance Step 4 Step 5 - Delivery - 4 options logistic - Installation - Block by block - One time adjustment - Numbering sequence Decide by client Production speed Capacity : Single storey Double storey ( unit / day ) ( unit / day ) - Bay 1 ( 170m x 4.5m x 2 line ) : 3 1.2 - Bay 2 ( 170m x 4.5m x 2 line ) : 3 1.2 - Bay 3 ( 170m x 4.5m x 2 line ) : 3 1.2 Total : 9 3.6 Single storey Double storey ( year / unit ) ( year / unit ) Existing production 8 acres : 1,800-2,500 800-1,000 Future development 8 acres : 2,500-3,500 1,200-1,400 Total : 4,300-6,000 2,000-2,400

iii ) Step 3 - Production ( advance casting ) - 7 to 9 units single storey per day Future development 13 acres : 2,500 to 3,500 units of single storey ( 1000 ft2 ) per year Existing production 8 acres : 1,800 to 2,500 units of single storey ( 1000 ft2 ) per year

iii ) Step 3 - Production ( advance casting ) - Quality control & Assurance Every Truck Every 20 m3 Casting & Leveling Mould Dismantling Rebound Hammer Test Panel Lifting Vertical Curing 7 days Proper Storage Yards

iv ) Step 4-4 options logistic Logistic option : Decide by client Option 1 - Bay yard ( factory ) to block yard ( project site ) Option 2 ( advance casting ) - Bay yard ( factory ) to site yard ( project site ) Option 3 ( advance casting ) - Storage yard ( factory ) to block yard ( project site ) Option 4 ( advance casting ) - Storage yard ( factory ) to site yard ( project site ) Notes : a) Client / Consultant / Main contractor need to choose which option to be used before production b) Rate for RM 900.00 / m3 includes for option 1 & 3 c) An additional of RM 30.00 / m3 need to be charges for option 2 & 4 d) Crusher run base to be provided at site yard for option 1 to 4

iv ) Step 4-4 options logistic Layout production sequence Block 10 Block 11 Block 2 Show House Block 1 Block 3 Block 9 Block 4 Block 5 Block 8 Block 7 Block 6 Site plan

iv ) Step 4-4 options logistic Proper storage yards G30 design mixed 14 hours hoist Panel 18 hours hoist Bay yard storage 7 days External transport to project Internal transport to block yard

iv ) Step 4-4 options logistic 1. Bay yard to block yard 2. Bay yard to site yard ( project ) 3. Storage yard ( factory ) to block yard 4. Storage yard ( factory ) to site yard ( project )

v ) Step 5 - Installation Layout production sequence Block 10 Block 11 Block 2 Show House Block 1 Block 3 Block 9 Block 4 Block 5 Block 8 Block 7 Block 6 Site plan Block by block

V ) Step 5 - Installation - One time adjustment ( 25mm tolerant )

V ) Step 5 - Installation - Numbering sequence

V ) Step 5 - Installation - Numbering sequence

V ) Step 5 - Installation - Numbering sequence

IBS Superstructure In Malaysia 3 in ( customized & flexibility to suit all Architectural demands ) Straight joint Cross shape T shape L shape Load bearing wall + Modular shear keys ( wet joint ) + Box system ( comply to code & Building By Law )

2. Precast element comply to the code & building by law HC Precast System ( 100 % Malaysia Technology With 6 IPs ) IBS Superstructure In Malaysia 3 in 1 - Load bearing wall - Modular shear keys ( wet joint ) - Box system Customized & Flexibility To Suit All Architectural Demands The system is a proprietary technology that has been established in accordance to British Standards ( BSI ) and is also a patented technology. The main design of the connection system has also been subjected to detail checking by an Independent Checker. Hence, the specifications are not to be altered without proper engineering study to ensure the safety and integrity of the precast system.

2. Precast element comply to the code & building by law Every truck Rebound hammer test Vertical curing 7 days 6.2 Minimum period

2. Precast element comply to the code & Building By Law

3. Open system and proprietary system is a technology 10 days completed with 6 workers superstructure ( frame, wall & RC flat roof ) - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

3. Open system and proprietary system is a technology - Industrialised building system function as a system not a component or machine

THANK YOU