SolarWedge. Installation Manual Date Modified: 9/17/07 WARNING SAFETY. Tool List

Similar documents
UPDATED REV.5 BLACK WIDOW. Detailed installation manual. Patent pending P/N: BW-S, BW-B, BW-F.

PV MOUNTING SYSTEM INSTALLATION MANUAL

BLACK WIDOW COMPOSITE

Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails

Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails

Bumper Sign INSTALLATION INSTRUCTIONS

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Connect Transit Shelter

FLOE quick attach & standard sectional dock and leg kits

Oval Vinyl Gazebo. Assembly Manual

Continuous Handrail Kit Installation Instructions

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

CSS Central Mount System

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

SILVERBACK INSTALLATION MANUAL

The following instructions will guide you through the installation of your new vinyl railing.

Installation Instruction

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

The following instructions will guide you through the installation of your new vinyl railing stair kit.

May 14, Installation Manual

Clearview Railing System Installation Instructions

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

Dura-Lock Roof System

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

Assembly Instructions. Important!

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

Independent Containment System (ICS)

V nyl Gazebo truct c it Assembly Instr ons

Installation Manual Flat Track Series

Bollard CartMagnet Standard Open Unit INSTALLATION INSTRUCTIONS

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

Installation Manual XRL Solar Rail System

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

1. TOOLS + MATERIALS REQUIRED

Face Mount to Through-the-Post Mount

Installation Instructions

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

STRATUS SHELTER. Take bike parking to new heights

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

Install Instructions. NewAge Steel Welded Tall Locker

12, 14 & 16 Wide Enclosure Assembly Guide

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

KOLO SHELTER Installation Instructions Parts List

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

Double Beam Freestanding Pergola Installation Guide

Small Projection port, Small View port Installation procedure

SolarMount (E)volution

Solar Mounting Solutions. Series 100 Residential Roof Mount System Installation Manual. snapnrack.com Listed PV Mounting System

On-Roof Mounting Sets for Flat-Plate Collectors

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

Lange Crank Hoist-a-top Assembly Instructions

THE ROGUE TM GRAND RAPIDS TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

Installation Guidelines

Rayport G Eco Dealer Kit

Assembly Instructions. Important!

Box Track INSTALLATION INSTRUCTIONS

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

RBP-1215B-RX DODGE RAM QUAD CAB RX3

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

10 Octagon Cedar Gazebo Assembly Instructions

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

WireCrafters, LLC. General Information

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

Spring Loaded All Season Roll-Up Doors

MONKEY BARS OVERHEAD RACK INSTALLATION

Pickup Box Utility Rack Package Installation (Instruction ID: )

ADULT ASSEMBLY REQUIRED DUE TO THE PRESENCE OF SMALL PARTS, SHARP POINTS, SHARP EDGES

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

Video Wall Installation Instructions 2W X 3H, 3W X 3H

TREX PERGOLA INSTALLATION INSTRUCTIONS

PV Mounting System 2703 SERIES 100 UL ROOF MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Installation Instructions

Assembly Instructions 10 X 10 Aluminum Frame Building

28" Adjustable Solar Tilt Mount ADJ-28. Owner's Manual. Please read this manual BEFORE installing your solar tilt mount

PREPARATION & TOOL CHECK LIST

MTS-SP100. RENOGY Pole Mount System E Philadelphia St, Ontario, CA Version: 1.2

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

10 x 10 Flat Top Two Tone Pergola

Downtown Rack. Custom logo option available

8 Ft Wide Enclosure Assembly Guide

Transcription:

APPLICATION: The product line provides an easy -to-install and economical solution for a 5, 10 or 15 degree tilted roof mounted system. integrates with Professional Solar s (ProSolar) patented top-down clamps and deep channel support rails. The system dramatically lowers installation and shipping costs while optimizing installed wattage on the roof. WARNING Symbol Legend All ProSolar are engineered and tested to withstand stated specifications (as stated on published specification sheets) when installed properly. Failure to install properly may decrease the performance of the installation. Explanation or Install Tip SAFETY Important Product Performance Information All regional safety requirements should be followed when installing ProSolar Products. All tools and equipment located on the roof should be secured to avoid falling object hazards. All equipment/tools should be properly maintained and inspected prior to use. Any exposed studs should be protectively capped to help avoid injury. This installation manual is intended for use by professional installers with a working knowledge of construction principles. Critical for Safety Tool List Cordless drill with 1/4 diameter, long drill bit Cordless drill with 3/8 carbide (masonry) bit Cordless impact wrench (with appropriate lag bolt socket) 3/4 (18mm) titanium plated self starting #3 Unibit 1/2 self starting #10 Unibit 9/16 open-end wrench Adjustable pliers 9/16 Deep socket Page 1 of 9 1/2 box-end wrench Tape measure String line (chalk line) Lumber crayon Sharpie pen Stiff paint brush FoamJack drill guide Dead-blow hammer (approx. 21 oz) Precision stud sensor (recommended Zircon I520)

Installation steps overview 1) System layout & chalk line marking 2) Locating roof rafters along chalk lines 3) Attaching/sealing 4) Installing XD Splice 5) Fastening rail to attachment 6) Installation of the clamping hardware/modules 7) Clean up/quality Inspection Step 1: System layout & chalk line marking Prior to beginning attachment work, the system roof layout should be defined. Chalk line to reference support rail placement A drawing or sketch, prior to roof work, is recommended. Upon finalizing layout, use chalk lines to mark support rail locations. The chalk lines will be used to align attachment points. Note: The rail distance from the end of the module will vary based on module size. ProSolar does not recommend 72 attachment spacing on residential structures, as residential structures are typically not designed for longer spans. It is highly recommended to obtain proper structural engineering for loading of the structure before specifying a long-span mounting system. Proper module/rail orientation single array sample Clamps must secure the module on the long end of the frame. The span of the two support rails should be 48. EXAMPLE: (Using a 64 long module) 8 48 64 Page 2 of 9 8

Step 2: Locating structural members along chalk lines Finding initial reference support member for a commercial flat roof: 1) Locating commercial roof landmarks is usually sufficient for finding the initial reference support member. Landmarks include skylights, vents and air conditioning units, as these are normally beside known structural members. 2) Upon identifying the general location of the support member, use a precision stud sensor to locate the center of the support member. Depending on the thickness of the roofing material the Zircon stud sensor may accurately indicate the location of the support member which significantly reduces location time. In some structures, such as open warehouses, the landmarks and structural members are visible from below, which helps make locating structural members from the roof easier. Alternate method of finding structural members (STEP 3): Using a dead blow hammer, lightly tap perpendicular to the approximate structural member location until a solid sound is heard. The dead blow hammer impact directly above the structural member will emit a deeper sound. 3) Once the initial reference support member center location is identified, measure the appropriate distance (72 ) to help approximate the next support member/connection location. Page 3 of 9

Step 3: Attaching / Sealing Mark (with lumber crayon) or account for ALL holes, including small nail holes, to ensure roof is properly sealed. Approximate attaching/sealing time: 5 min. per attachment. There are many sealant methods, including, but not limited to, sealing, flashing and foaming. The is compatible with readily available, standard 1 diameter metal flashings (approx. 4-1/2 minimum flashing height). If foaming, post threads should be protected to avoid foam intrusion. UV rated sealant method illustrated in this installation sequence. Step 1 Step 2 Step 3 For 3/8 x 6 lag bolt applications STEP 1a: Using a 3/8 carbide (masonry) bit, break through the cap sheet. STEP 1b: Using the FoamJack drill guide and a 1/4 dia. long drill bit, drill a hole in the center of the joist. STEP 2: Apply a generous amount of roof sealant to the bottom of the seal plate of the creating a circle around the lag bolt hole. STEP 3: Using a cordless impact wrench and a 9/16 deep socket, install the bolt into the base until seated. Allow the sealant to flow outward around the edges of the seal plate. Using a carbide bit to break through the cap sheet will avoid premature dulling of the wood drill bit. Use two drills, one with a 3/8 carbide bit, one with a 1/4 long wood drill bit to save time. Lag bolts are not included with the products due to site (job) specific requirement variation. The installation manual references the use of 3/8 lag bolts. Consult your structural engineer for site (job) specific fastener requirements. Page 4 of 9

STEP 4: Install the post using an adjustable wrench. Turn wrench clockwise until fully secured. Avoid twisting the base while tightening. STEP 5: Seal the top of the seal plate with a layer of UV rated sealant using a stiff paintbrush. Cover the entire base plate with the sealant, at least half the post and about 1-1/2 around the plate. STEP 6: Using Play/Silica sand, cover the sealant. This step prevents debris from sticking to the sealant while drying and gives it a clean, finished appearance. IMPORTANT: Do not install leveling kit hardware until support rail installation. Page 5 of 9

Step 5: Fastening rail to attachment STEP 1: Using a string line from each end of the Use a Unibit 3/4 #3 drill bit module array, level studs to desired position on roof (4 leveling stud must have at least 1 threaded into post). String line for leveling of jam nut/ washer STEP 2: Measure and mark hole placement on support rails by placing support rail upside down over studs use a Sharpie permanent marker to mark where drill holes should be placed. (Refer to RoofTrac installation manual for more details). STEP 3: Using the titanium plated 3/4 #3 selfstarting Unibit (sold separately) drill holes at stud centers along support rail. Use a Unibit 3/4 #3 titanium drill bit for drilling the support rail reduces drill time to a mere 3 seconds. Commercial Splice Kit recommended STEP 4: Install support rail using the components as illustrated below. Page 6 of 9

A Level support rail B Hand-tighten 3/8 Jam Nut/washer C Using a 9/16 wrench, tighten the lower jam nut turning counter-clockwise, (Approx. 10 FT.LB) Repeat for all attachment locations. 1.5 x 2.5 Support Rail Lower Support 9/16 Box-end wrench 3/8 SS Jam Nut Turn Counter- Clockwise Post Page 7 of 9

Step 6: Installation of the clamping hardware/modules There are two sets of clamps; the outside clamps (end clamps) and the inter-module clamps that install between the modules. It is recommended to prethread or start the bolt, lock washer and clamp into the channel nut prior to bringing them to the roof. This will reduce roof work time. Solar Modules Intermodule clamp & Channel Nut End clamp & Channel Nut Insert an end clamp at the end of each row of support rails. Hook the end clamps against the long end of the module and square off to the support rail. Tighten the clamps using a 1/2 box wrench or drive socket. DO NOT OVER-TIGHTEN, we recommend a maximum torque of 12-15 ft. lbs. to prevent damage to the module glass. After the first module is secured, slide two inter-module clamp sets onto the first module. They are designed to remain captive in the channel allowing the installer to slide and align the next module. Repeat this procedure until all modules are installed onto the support rails. Upon installation of the last module, install the mod- Hands-free clamp design allows both hands to be used to position modules while clamps remain captive in the support rail. Step 7: Clean up / Quality Inspection Clean Up: Upon completing the attachment installation, account for all tools and clean area as necessary. Quality Inspection: It is recommended that each contractor perform a final attachment quality inspection prior to installing the RoofTrac mounting system to ensure all attachments are properly fastened. Make sure all installation crew members on the roof are mindful of installed roof attachments to prevent tripping. All installation crew members should utilize proper safety equipment when installing a solar system. (Harnesses, hardhats, gloves, proper no-slip footwear, etc.) Page 8 of 9

post 3/8" x 1-1/2" SS bolt (not included in standard box) 12" min clearance base 4.5 Commercial FastJack E-Series 450 Roof fastener Fire Class Resistance Rating: -Class A for low slope applications when using Type 1 and Type 2, Listed Photovoltaic Modules. Page 9 of 9