SSEMLY INSTRUTIONS The Nantucket Legacy rbor Please read through before starting assembly. IMPORTNT: HEK THE INSIDE OF YOUR POSTS FOR LL MTERILS. heck ox for These ontents In. the Keystone event of missing Top Lid or () defective parts please call our customer service dept. at 800 8 96, ext #0 (Mon. to Fri. 8:00 M to :00 PM EST)... Keystone Top Internal Lid () onnectors ().. rch Keystone Keystones Internal () onnectors ().. Keystone rch Keystones ottom () Plate ().. rches Keystone () ottom Plate () 6.. rches Rafters () (8) / x / x.9" 7. 6. Post rch aps Rafters ()(8) / x / x.9" 8. 7. Side Post aps Panel () Horizontal Rails () / x / x 7.7 9. 8. Posts Side Panel () x x70. Horizontal Rails () / x / x 7.7 0. 9. Side Posts Panel () x x70. Diamond Lattice (). 0. Side #8 x Panel / in. Diamond (.8 cm.) Lattice Stainless () Steel Screws (for Keystone and 6. #8 rch x to / Post in. onnection) (.8 cm.) Stainless () Steel Screws (for Keystone and 6 7 rch to Post onnection) () Tools You Will Need 7 8 Tools Hammer You Will Need Tape Measure 98 Hammer Tape Level Measure 9 Stool Level or Short Ladder 0 Shovel Stool or or Short uger Ladder ordless Shovel or Drill 0 uger ordless Drill General Information General Information Read Instructions through carefully before beginning assembly. When Read Instructions assembling components, through carefully place on before a non-abrasive beginning surface assembly. (i.e. When shipping assembling box) to components, avoid scratching. place on a non-abrasive surface (i.e. We shipping recommend box) an to area avoid approx scratching. 0 x 8 for unobstructed assembling. You We recommend should not need an area to use approx excessive 0 x 8 force unobstructed when assembling assembling. components. You should not need to use excessive force when assembling components. (Not to scale) (Not to scale) Ver /Sept 009 Ver /Sept 009
S T EP ONE ssemble the rch System NOTE: There are locking tabs located at the ends of each rafter. Once inserted and pushed into the routed holes, they will lock into place and cannot be removed. Insert arches into arch keystone ensuring they terminate flush to the internal connector. 6 7 8 Fasten the top of the arches to the keystone insert by installing / in. (.8 cm.) screws into the two flanges on either side of the top of internal connector. Invert the arch system and install two screws / in. (.8 cm.) from the bottom of the keystone into the two flanges on either side of the bottom of the internal connector. This will connect the bottom of the arches to the insert. Seal the bottom hole on keystone by inserting the bottom plate as provided. Install the top cap on the arch keystone. Ensure keystone cap is pushed down firmly so the cap locks into pos Repeat for other arch. Insert arch rafters (8) into the holes on the arches until they bottom out inside the arches. There are locking tabs located at each end of these rafters that once inserted into the holes will lock into place. Fit opposite arch system over rafters. 7 8 The Nantucket Legacy rbor
STEP TWO ssemble the Side Panels Insert the Lattice into the horizontal rails as illustrated. Lay post on flat surface with holes facing up. Insert assembled panel into post. Push until tabs lock into place. Layout opposite post and insert the side panel assembly as shown. Push until locking tabs on rails snap into place. NOTE: if you intend to hand a gate from the arbor, before you install the arch, insert a x wood board approximately ft. (. cm) up the inside of vinyl cavity. ( x wood board purchased separately) top view showing the cavity of the post with a x wood board. Side Panel Horizontal Rail Fasteners Vinyl Post Ground Shown with gate (purchased separately) Gate Hinge x Wood board The Nantucket Legacy rbor
STEP THREE Install the Side Panels You have Three Options to omplete this Step. (ll purchased separately) OPTION ONE - If Your rbor: is going to be installed with fencing or a gate is located in a high wind or hurricane area is located in ground conditions that are not level onsider Using: - x Professional Post Extension Kit (0 in./76. cm. long), (Kit of ) Purchase from New England rbors, Recommended to be installed in concrete footings Follow instructions included with the kit - or - - x x Long Wood Post () Purchase separate from your local lumberyard Recommended to be installed in concrete footing OPTION TWO - If Your rbor: is intended to be used as a stand alone garden accent or pathway is located on level ground onsider Using: x ussie ugers (Kit of ) Purchase from New England rbors, Instructions are included with the kit OPTION THREE - If Your rbor: is going to be installed onto pre-existing concrete or wood surface (Posts have been extended with x Professional Post Extension Kit) 0 in. 9 cm..8 in..6 cm. (Measurements shown are inside to inside of posts) onsider Using: x Surface Mount Kit Purchase from New England rbors, Follow instructions included with the kit Into Earth with oncrete Footing (Option One) (ssuming posts have been extended) rbors must be well secured to prevent tipping over from wind load, etc. in. 8.8 cm. 0 in.. cm. Move the side panels to their final location (you will need a helper). When you have identified the location of each post, as indicated by the measurements on the first page of these instructions, mark the positions of the posts, then move the panels aside. Excavate four holes approx in. (8.8 cm.) deep. The location and excavation of these four holes is the most critical step and should be completed with care. The depth of these holes will allow the post extension (if chosen as option) joint to be hidden in. (7.6 cm.) under the ground. Level arefully move the side panels back into position and level both horizontal and vertically. heck your measurements to confirm posts are placed correctly to receive arch system. THIS IS RITIIL STEP. * Do not backfill the holes with cement at this stage. The Nantucket Legacy rbor
STEP FOUR onnect the rch System to the Side Panels Temporarily position post caps on bottoms of arches. With a helper, insert the bottom of the arches into the posts until the arch rest on the stopper bolts. Slide post caps down into position. Install - / screws into the two pre-drilled holes per posts. STEP FIVE Fill Excavated Holes Ensure that posts and side panels are level. Fill around the posts with wet cement within in. (7.6 cm.) of your natural elevation. omplete a final level check both horizontally and vertically. and backfill the remaining space between concrete and natural elevation with topsoil. Level Level in. 7.6 cm. 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
SSEMLY INSTRUTIONS Please read through before starting assembly. heck ox for These ontents ( ox) In. the Posts event () of missing x / or x defective parts please call our customer service dept. at 800 8 96, ext #0 (Mon. to Fri. 8:00 M to :00 PM EST)... Top Posts Rail ()() x / x x / x 8 /. ottom Rail () / x / x 8 / Picket cap comes. Top Rail () / x / x 8 /. Pickets () 7/8 x x 8 / installed. ottom Rail () / x / x 8 / Picket cap comes Post cap comes. Pickets () 7/8 x x 6 8 / / installed installed Post cap comes Pickets () 7/8 x x 6 / installed Pickets () 7/8 x x /. Pickets Steel Hinge () 7/8 Set x () x / 6.. Steel Latch Hinge Gate Set () Set () 6. Hardware Steel Latch Kit Gate (Includes): Set () 7. Hardware Self-tapping Kit stainless (Includes): Screws (6) /8 7. Self-tapping stainless Screws (6) /8 (*) Gate will fit: Nantucket (*) Gate will Legacy, fit: Nantucket Deluxe, Fairfield Deluxe, Fairfield, Nantucket Westchester, Legacy, Nantucket Newport. Deluxe, Fairfield Deluxe, Fairfield, (*) If gate Westchester, is to be installed Newport. on a Yorkshire arbor, the top and (*) If bottom gate is rails to be will installed need to on be a trimmed Yorkshire by arbor, / the (/ top off each and bottom end) rails will need to be trimmed by / (/ off each end) Tools You Will Need Not to Scale Tools ordless You Drill Will with Need # Phillips bit and /8 drill bit. Not to Scale /8 ordless Socket Drill Wrench with # Phillips bit and /8 drill bit. Phillip /8 Socket Screwdriver Wrench /6 Phillip Screwdriver Or adjustable wrench 6 Tape /6 measure Or adjustable and pencil wrench Not to 6Scale Tape Square measure and pencil Level Not to Scale Square General Level Information General Read Instructions Information through carefully before beginning assembly. When Read Instructions handling components, through carefully place on a before non-abrasive beginning surface assembly. When (I.e. Shipping handling box) components, to avoid scratching. place on a non-abrasive surface 7 We (I.e. recommend Shipping box) an to area avoid approx scratching. x for unobstructed handling. Not to 7Scale Ver /Sep 009 We recommend an area approx x for unobstructed handling. Not to Scale Ver /Sep 009
ottage Picket Gate Installation STEP ONE Top Rail ottom Rail Lay out one of the posts on its side, with holes facing up, and insert the two rails. The bottom rail (holes routed one side only) goes into the hole that is closest to the end of the post. Now insert the top rail into the other hole. Hold the rails into the post and now insert the rails into the other post Lay the assembly down on a flat surface and use a square to check the inside corners. Make sure that each rail is bottomed out inside the posts. Note: If you have purchased the Yorkshire rbor, you will need to trim /" off of the end of each of the rails in order to make the gate smaller to fit the narrower opening. D Install screws into each of the four places where the rail goes into the post. Install screws on diagonal (as shown). Note: Screws are self tapping but if you have any difficulty getting them started, pre-drill a small pilot hole first (no larger then /6") Make sure rails are bottomed out inside the posts. Square D 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
STEP TWO Hinges and Latch Installation Now determine which way your gate is going to open in your arbor. This will help you determine which side of the gate to install the hinge on. fter you have determined which edge of the gate post the hinges are going to be installed on, turn the gate so that the screws you installed in D on the previous page are facing down. This way these screws will not be in the way when putting on the hinge. Separate the hinges (part ) into two halves. Place the half with the eye holes onto the gate post, centering it at the end of the top rail as illustrated. Pre-drill each pilot hole, then attach the hinge with the black screws provided in the hinge kit. s in the previous step, place one half of the hinge onto the gate post. The second hinge should be installed 6 / down from the top hinge (see illustration ). This hinge will be installed above where the bottom rail goes into the gate post. ttach with screws provided in hinge kit. enter the gate latch (part 6) at the end of the top rail opposite where the hinge was attached. Install as close to the outside of the post as possible. Fasten the latch to the post using the screws from the latch kit. Install screws to attach where the rail goes into the post (as in page - D) note: you will not need to install white screw into gate on top rail where the hinge is attached. D 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
ottage Picket Gate Installation STEP THREE Slip each picket (part ) through the top rail and into the bottom rail. Start with the shortest picket(s) in the center, and end with the two longest pickets on each side. Place one of the remaining halves of the hinge against the inside wall of the arbor post just above the base molding. Using the same method in step, attach the hinge to the post. If your arbor does not have base moldings, mount the hinge approximately 8 up from the bottom of the post. Note: We recommend using wood inside the arbor post to create a stronger attachment for the gate. Repeat for the other hinge. Make sure the distance between the two hinges is equal to that in step (6 / ). Lift the completed gate and line up the hinges. arefully guide the long bolts on the gate hinges through the eye holes on the gate hinges. 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
STEP FOUR djusting Gate Insert the bolt sleeve between the eye holes before sliding the long bolts completely through. Thread the / nuts over the end of each bolt and tighten with a wrench. Note: to center your gate in the arbor opening, adjust the hinge nuts as needed. Set a level across the top rail to make sure the gate is hanging level. You may need to adjust the hinge nuts again to achieve this. Once the gate is level, position the latch catch onto the arbor post and mark out the hole locations. Pre-drill the holes (use /8 drill bit - purchased separately) and fasten the latch catch to the arbor post using the black screws provided with the latch kit. D If latch does not catch into the latch catch properly, you can adjust the hinges by loosening the nuts on either side of the hinge bolt. lose the gate so that the latch is in the latch catch then adjust the nuts as necessary to have the gate hang in position properly. If any other adjustments are needed, repeat as necessary. Gate should swing and close into latch smoothly. Level 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
SSEMLY INSTRUTIONS SSEMLY INSTRUTIONS (Pre-ssembled) (Pre-ssembled) Please read through before starting assembly. heck Please read ox through for These before ontents starting assembly. ( ox) heck ox for These ontents ( ox) In the event of missing or defective parts please call our customer service dept. at 800 8 96, ext #0 (Mon. to Fri. 8:00 M to :00 PM EST).. Posts () x x. Top Rails () x. x.. ottom Rails () x. x.. Pickets ().87 x x 9. Pickets ().87 x x 0 Pickets ().87 x x. Pickets ().87 x x.7 Pickets ().87 x x. Pickets ().87 x x 6. Pickets ().87 x x 8. Pickets ().87 x x. External Post aps () x 6. Trim aps () x 7. ase Moldings () x 8. Rail Mount rackets (8) x. Hardware Kit (Includes): 9. Self-tapping stainless Screws ().7 0. Rail end spacers ().. Tube of vinyl cement () 6 Tools You Will Need ordless Drill with # Phillips bit Tape measure Pencil Level Shovel Two bags of pre-mix concrete (optional) General Information Read Instructions through carefully before beginning assembly. When handling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching. We recommend an area approx x for unobstructed handling. 7 8 9 Not to Scale 0 Ver /Oct 009
ottage Picket Wings Installation STEP ONE Lay out one of the posts (part ). Measure 8 from one end of the post and put a mark. enter the rail mount bracket (part 8) on the post, with the open end at the 8 mark. Using two screws, fasten the bracket to the post as illustrated. Repeat this for the second post. Note: ll screws are selftapping and require no pre-drilling. Take one of the posts and measure 9 from the same end of the post as in step. Put a mark on the post at this distance. Slip one of the base moldings (part 7) onto the opposite end of the post as illustrated. Slide it up the post until the top edge of the molding is at the 9 mark. enter another rail mount bracket on the base molding, keeping the open end of it tight against the raised lip of the base molding trim. Fasten the bracket in place using two screws. Repeat steps through for the other post. Note: The distance between the two brackets should measure approximately 8 / when finished. 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
STEP TWO Insert the bottom rail (part ) into the bracket on the base molding. Make sure the holes in the rail are facing towards the second bracket on the post. Using one screw, secure the rail in place through the side wall of the bracket as illustrated. Repeat this for the opposite side wall. Insert the top rail (part ) into the second bracket, making sure the larger sized holes in the rail are facing towards the bottom rail. Secure the rail as described in the previous step. Note: The holes in the rail are approx. /8 larger on one side to allow for proper alignment of the pickets when mounting. Repeat steps and for the remaining post and rails. reak open one bundle of pickets (part ). Start with the picket at the furthest end of the rails, and insert each one in decending order, ending with two 9 / pickets at the post. Make sure the tabs on the end of the pickets snap into the bottom rail. Open the second bundle of pickets and repeat for the opposite wing panel. ottom Rail is only routed on the one side Top rail is routed on both sides: The larger opening faces the bottom rail. 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
STEP THREE Determine which side of your arbor the wings will be attached to. Fasten a rail mount bracket to the outside of the arbor base molding in the same manner as described in step one (c). Note: If your arbor does not have a base mold, install bracket directly on arbor (). You will need to use / filler () as bottom rail is shorter to allow for base mold. Using two screws, fasten a second bracket to the outside of the arbor post as illustrated. The distance between the brackets on the arbor post must equal the distance measured between the brackets on the wing post. Repeat steps and for the arbor side panel. Using the distances shown, mark out each hole location on both sides of the arbor. Dig out two 6 deep holes. / Filler (used when no base trim is present on the arbor post). Ground Level 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986
STEP FOUR Lower the wing post into the hole, while slipping each rail end into the corresponding bracket on the arbor post. check the top rail for level, and adjust the depth of the hole if needed. Secure the rail ends to the brackets as described in step (a), and fill in the hole (for added stability, use pre-mix concrete). Repeat this step for the opposite wing panel. Note: The bottom of the wing post base molding should be at ground level when finished. pply a generous amount of vinyl glue around the post. Note: The vinyl glue should be applied below the top of the picket cap level as shown. Slip one trim cap (part 6) over the end of each post. Slide each cap down until the top edge is level with the top of the first picket. pply a bead of vinyl cement to the underside of each post cap (part ). To ensure proper attachement to the post, apply the cement to all internal contact points of the cap. Place the caps onto the end of each post and push down firmly until the end of the post bottoms out on the inside of the cap. llow a few minutes for the cement to cure. Level Vinyl glue is to be applied below the picket level. 9 Dove St., Port Huron MI US 8060 Toll Free Phone: 800 8 96 Toll Free Fax: 877 6 986