Uranus Exploration Challenges

Similar documents
The JPL A-Team and Mission Formulation Process

Planetary CubeSats, nanosatellites and sub-spacecraft: are we all talking about the same thing?

Technologies for Outer Solar System Exploration

Cyber-Physical Systems

CubeSat Launch and Deployment Accommodations

CubeSat Integration into the Space Situational Awareness Architecture

Science Plenary II: Science Missions Enabled by Nuclear Power and Propulsion. Chair / Organizer: Steven D. Howe Center for Space Nuclear Research

NASA s X2000 Program - an Institutional Approach to Enabling Smaller Spacecraft

Solar Power Satellite, Space Elevator, and Reusable Launch

Deep Space cubesats a nanosats at JPL. Tony Freeman Jet Propulsion Laboratory, California Institute of Technology

Feasibility Analysis for a Manned Mars Free-Return Mission in 2018

VEXAG Report. Planetary Science Subcommittee Meeting June, Ellen Stofan

Proximity Operations Nano-Satellite Flight Demonstration (PONSFD) Overview

ANTENNA ELEMENTS INTEGRATED INTO THE PARACHUTES OF PLANETARY ENTRY PROBES

Asteroid Redirect Mission and Human Exploration. William H. Gerstenmaier NASA Associate Administrator for Human Exploration and Operations

Current and Future Missions to the Moon

PROCEEDINGS OF SPIE. Inter-satellite omnidirectional optical communicator for remote sensing

Understand that technology has different levels of maturity and that lower maturity levels come with higher risks.

NanoSwarm: CubeSats Enabling a Discovery Class Mission Jordi Puig-Suari Tyvak Nano-Satellite Systems

Starshade Technology Development Status

Adap%ve Deployable Entry and Placement Technology (ADEPT):

STK Missile Defense. Introduction: Scenario Storyline:

NASA TA-02 In-space Propulsion Roadmap Priorities

Near Earth Asteroid (NEA) Scout CubeSat Mission

Advances in Planetary Seismology Using Infrasound and Airglow Signatures on Venus

U.S. Space Exploration in the Next 20 NASA Space Sciences Policy

On January 14, 2004, the President announced a new space exploration vision for NASA

LLCD Accomplishments No Issues with Atmospheric Effects like Fading and Turbulence. Transmitting Data at 77 Mbps < 5 above the horizon

SSL Payload Orbital Delivery System (PODS) FedEx to GTO/GEO

CYLICAL VISITS TO MARS VIA ASTRONAUT HOTELS

Introduction to MATE-CON. Presented By Hugh McManus Metis Design 3/27/03

Panel Session IV - Future Space Exploration

SSL Payload Orbital Delivery System (PODS) FedEx to GTO/GEO

Reducing the Challenges Posed by Titan Missions

Voyage to Mars Space Simulation

Launch Service 101: Managing a 101 CubeSat Launch Manifest on PSLV-C37

AstroBus S, the high performance and competitive Small Satellites platform for Earth Observation

Airbus DS ESA Phase-0 L5 Spacecraft/Orbital Concept Overview. Emanuele Monchieri 6 th March 2017

The SunCube FemtoSat Platform: A Pathway to Low-Cost Interplanetary Exploration

The Future for CubeSats Present and Coming Launch Opportunities 18th Annual AIAA / USU Conference on Small Satellites CubeSat Workshop

Overview of Recent Lunar Robotic Science and Exploration Studies at JPL

Jet Propulsion Laboratory, California Institute of Technology

Technology Capabilities and Gaps Roadmap

Nanosat Deorbit and Recovery System to Enable New Missions

A RENEWED SPIRIT OF DISCOVERY

NASA Mars Exploration Program Update to the Planetary Science Subcommittee

Moog CSA Engineering CubeSat Payload Accommodations and Propulsive Adapters. 11 th Annual CubeSat Developer s Workshop 25 April 2014

MAMBO: A Simple Soft-core Processor used in the COPPER Mission. Steve Massey Electrical Engineering 2013 Saint Louis University

HYDROS Development of a CubeSat Water Electrolysis Propulsion System

CubeSat Standard Updates

Team 6: University of Colorado Boulder (USA)

ESA UNCLASSIFIED - Releasable to the Public. ESA Workshop: Research Opportunities on the Deep Space Gateway

HEOMD Update NRC Aeronautics and Space Engineering Board Oct. 16, 2014

Ocean Worlds Robert D. Braun

Future DSN Capabilities

New Methods for Architecture Selection and Conceptual Design:

CubeSat Proximity Operations Demonstration (CPOD) Mission Update Cal Poly CubeSat Workshop San Luis Obispo, CA

The International Lunar Network (ILN) and the US Anchor Nodes mission

FalconSAT-7 Deployable Solar Telescope

Deep Space Communication The further you go, the harder it gets. D. Kanipe, Sept. 2013

Miguel A. Aguirre. Introduction to Space. Systems. Design and Synthesis. ) Springer

Solar Observing Low-frequency Array for Radio Astronomy (SOLARA)

Asteroid Redirect Mission (ARM) Update to the Small Bodies Assessment Group

Chapter 2 Planning Space Campaigns and Missions

Exploration Systems Research & Technology

A RENEWED SPIRIT OF DISCOVERY

Potential Mission Applications for Space Nuclear Systems

Democritos a Europe funded project preparing demonstrators for high power nuclear electric space propulsion

Decadal Survey Process and Mars Program Introduction

In Space Propulsion Overview January Outline. Les Johnson Manager, In Space Propulsion Technology Projects Office

Pterodactyl: Integrated Control Design for Precision Targeting of Deployable Entry Vehicles

RAX: The Radio Aurora explorer

Tropnet: The First Large Small-Satellite Mission

CubeSat Propulsion using Electrospray Thrusters

A Systems Approach to Select a Deployment Scheme to Minimize Re-contact When Deploying Many Satellites During One Launch Mission

2009 ESMD Space Grant Faculty Project

CUBESAT an OVERVIEW AEOLUS AERO TECH, Pvt. Ltd.

NEO Science and Human Space Activity. Mark V. Sykes Director, Planetary Science Institute Chair, NASA Small Bodies Assessment Group

Innovative Uses of the Canisterized Satellite Dispenser (CSD)

The Mars Exploration Program

Incorporating a Test Flight into the Standard Development Cycle

JHU/APL CubeSat Initiatives. Andy Lewin 19 April 2007

A novel spacecraft standard for a modular small satellite bus in an ORS environment

A Scalable Deployable High Gain Reflectarray Antenna - DaHGR

An Explore Mars BE BOLD technical project. Sanford Morton Emily Briere Cassidy Chan

Venus Airglow Measurements and Orbiter for Seismicity (VAMOS): A Mission Concept Study

Mission to Earth Moon Lagrange Point by a 6U CubeSat: EQUULEUS

Improving CubeSat Communications

Flight-dynamics Simulation Tools

Venus Aircraft. design evolution Geoffrey A. Landis. NASA John Glenn Research Center. Geoffrey A. Landis.

Enhancing the Economics of Satellite Constellations via Staged Deployment

Space Technology Mission Directorate. NASA's Role in Small Spacecraft Technologies: Today and in the Future

Characteristics of Apex Anchors

A Technical Comparison of Three Low Earth Orbit Satellite Constellation Systems to Provide Global Broadband

Lecture 27: The Future of Space Exploration

A MULTIMEDIA CONSTELLATION DESIGN METHOD

Remote Sensing: John Wilkin IMCS Building Room 211C ext 251. Active microwave systems (1) Satellite Altimetry

1. INTRODUCTION /06/$ IEEE 2 IEEEAC paper #1148, Version 1, Updated Dec,

Active microwave systems (1) Satellite Altimetry

C. R. Weisbin, R. Easter, G. Rodriguez January 2001

Transcription:

Uranus Exploration Challenges Steve Matousek Workshop on the Study of Icy Giant Planet (2014) July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 1

Outline Uranus System Summary Challenges Overview of Architectures How Architectures Meet Challenges Summary July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 2

A Brief History 1781 1986 2008 Higher Maturity Uranus Studies 2010 2011 2015? 202X? July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 3

Uranus System Summary July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 4

Uranus System Summary (2) July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 5

Challenges Challenge Possible Solution 1) Large distance a) Long flight time Large launch vehicle, Solar Electric Propulsion b) Large solar distance Radioisotope power (not discussed) c) Large Earth distance Ka band and/or Optical comm (not discussed) 2) Measurement time Aerocapture to achieve orbit 3) Uranus system a) Extended atm Orbit farther out b) Rings Close orbit to avoid rings? c) Tilted pole Arrival date, propulsion to change orbit inclination 4) Budget Novel flyby, orbiter, probe, and nanosat architectures July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 6

Notional Net Spacecraft Delivered Mass These are rough estimates used for large trade space exploration Chemical Trajectories (Estimate) Launch Vehicle Flyby Mission Orbiter Mission Atlas V 401 800 400 Atlas V 551 2000 1000 SEP Trajectories (Estimate) Launch Vehicle Flyby Mission Orbiter Mission Atlas V 401 1000 600 Atlas V 551 2500 1500 July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 7

Uranus Trajectory Options Bi-propellant (chemical) trajectories to Uranus are possible Chemical trajectories require Jupiter or Saturn gravity assist in order to deliver useable mass to Uranus Chemical trajectories are typically 13 years flight time or greater Numerous families of Solar Electric Propulsion (SEP) trajectories to Uranus exist SEP provides 10 year flight times, with potential for 8 or 9 year flight times with Jupiter or Saturn gravity assist Aerocapture potentially enables larger mass into orbit Aerocapture requires thermal protection system and deployments July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 8

SEP Example: EEJU Chemical capture in Uranus orbit 1485 kg net mass 504 kg Xe 8.66 km/s V July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 9

SEP Example: Venus-Earth Zero-rev to Venus One-rev to Venus 1549 kg net mass (aero.) 1396 kg net mass (chem.) 505 kg Xe, 9.44 km/s V 1972 kg net mass (aero.) 1209 kg net mass (chem.) 688 kg Xe, 11.47 km/s V July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 10

Easier to Get Into Equatorial Plane ~ 2028 Arrival July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 11

Architecture Concepts Flybys A: Minimum Cost Flyby Flyby w/elements B: Flyby w/3 Probes C: Flyby + Nanosats Orbiter D: Orbiter with instruments E: Probiter Orbiter w/elements F: Fully Instrumented Orbiter w/probe G: Dual Orbiters w/probe H: Fully Instrumented Orbiter w/probe & Nanosats July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 12

Architectures A Bit More Detail Architecture A: Min Cost Flyby B: Flyby w/3 Probes Description Limited # of inst, +/- 6 mon planet obs, +/- 1 mon detailed planet and rings, +/- weeks to days for moons and detailed atm Flyby S/C with limited # of inst deploys 3 probes, then relays back probe data to Earth C: Flyby + Nanosats Flyby S/C deploys many nanosats D: Orbiter with instruments Orbiter with limited instruments. Could also carry nanosats to deploy from orbit. E: Probiter Orbiter with instruments. Then, deorbits and becomes a probe. F: Fully Instrumented Orbiter w/probe G: Dual Orbiters w/probe H: Fully Instrumented Orbiter w/probe & Nanosats Orbit with full set of instruments. Deploy probe before orbit insertion (easier), or after entering orbit (harder) Two orbiters, linked or not, one or both carry probes. Payload optimized for orbits (one polar, one equatorial for example) Large orbiter with probe, much like Decadal Survey probe. Add many nanosats that can go to risky areas and/or give simultaneous measurement by relaying back to orbiter July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 13

Meeting Challenges Summary (Subjective ratings) Architecture/Challenge Ext Atm Rings Tilted Pole Budget A: Min Cost Flyby Likely Unlikely B: Flyby w/3 Probes Possible C: Flyby + Nanosats D: Orbiter with instruments E: Probiter F: Fully Instrumented Orbiter w/probe G: Dual Orbiters w/probe H: Fully Instrumented Orbiter w/probe & Nanosats July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 14

Meeting Challenges Summary (2) Architecture Comments A: Min Cost Flyby Arrival geometry fixed, can target to miss rings B: Flyby w/3 Probes Probe entry constrained due to arrival geometry C: Flyby + Nanosats Nanosats can add simultaneous measurements D: Orbiter with instruments Might be able to avoid rings by going close E: Probiter Hard to avoid the rings on way to atmosphere F: Fully Instrumented Orbiter w/probe Might be able to avoid rings, high $ cost G: Dual Orbiters w/probe Easier to get best geometry, high $ cost H: Fully Instrumented Orbiter w/probe & Nanosats Most flexibility, high $ cost July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 15

Summary Hard to meet all constraints of inclination, avoid rings, probe atmosphere, and flyby large moons Lower cost architectures exist, but they cannot meet all desires Continue to invest in key technologies Solar Electric Propulsion Radioisotope power sources Low power electronics Aerocapture Nanosats Need studies to look at full extent of architectures July 30, 2014 (c) 2014 California Institute of Technology. Government sponsorship acknowledged. JPL URS clearance CL#14-3608 16