OAKRIDGE R SUPER TM Shingles Installation Instructions

Similar documents
ARMORTAB R SUPER TM Shingles Installation Instructions

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

Cambridge English Application Instructions

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

DIRECTIONS FOR APPLICATION

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

DIRECTIONS FOR APPLICATION

A P P L I C A T I O N I N S T R U C T I O N S

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

DIRECTIONS FOR APPLICATION

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

eco-shake INSTALLATION INSTRUCTION

AIA Specification. Section Slate Shingles PART 1 GENERAL

STORMMASTER SHAKE GENERAL INSTRUCTIONS

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

Capstone Application Instructions

BARDOLINE INSTALLATION INSTRUCTIONS

Tuff-Rib Install Guide

B. Related Sections: The following Sections contain requirements that relate to this Section:

Hip & Ridge Shingles Installation Instructions

Timberline and Sovereign Expanded Fastener Placement Area

SECTION WOOD SHINGLES

SECTION ASPHALT SHINGLES

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

PROJECT INSTRUCTIONS Roofing

ROOFING City of Grand Rapids Building Safety Division

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Terrabella Shake & Shingle Znap Ver. 2.0

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

Polytegola N. Bitumen Roof shingles. Application guide

Three -Tab Shingles. CertainTeed Shingle Applicator s Manual

1.04 QUALITY ASSURANCE

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

BARRELL VAULT BATTENLESS

THREE-TAB SHINGLES. YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles.

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Shapes Siding. Perfection Shingles. Chalk Line

Brava Old World Slate Installation Guide

Application instructions

Turada Hardwood Shingles and Shakes Installation instructions

Inspire Aledora Slate Application Guidelines

Product Specifications

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:

Barrel Vault Counter Batten and Batten

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

TECHNICAL BULLETIN NEW ICC ES EVALUATION REPORT

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

REGAL. Installation Manual

Installation Manual. Future Roof Shingle / Slate Products

ES Report GAF-Elk Shingle Roof Covering Systems ESR-1475

4. Metal roof jacks at penetrations and attachments

Application instructions

Tapersawn Shake Installation Instructions

Ekoroof LiteTile Dimensions

installation guide Villa

TruDefinition Duration Shingles Designer Colours Collection

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Roofing Training - Basics. Sandy Wesch

Tuff-Rib. Installation Manual. Nationwide supplier of quality metal roofing. Toll-Free (800) S. Lee Hwy. Cleveland, TN 37311

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

Slate Shingle Specifications

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

Straight Rib Series Metal Roofing Panel Installation Guide

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

Duration & Oakridge Shingles Bold Contrast. Deep Dimension. TruDefinition.

Installation Manual. Future Shingle Products

DaVinci SlateTM INSTALLATION

DECRA Shingle Installation Guidelines

SECTION ASPHALT SHINGLES

SECTION ASPHALT SHINGLES

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Bold Contrast. Deep Dimension. TruDefinition.

Table of Contents Light Gauge Metal Roof & Wall Panels

SmartVent Eave Edge Installation Instructions

RED DIAMOND SHINGLES Roof Installation Introduction:

ROOFING APPLICATION STANDARD (RAS) No. 130

WOODSTART STARTER SHINGLE, STARTER STRIP PLUS, STARTER STRIP SHINGLE, AND TRI BUILT STARTER STRIP

ZIP System Roof Sheathing INSTALLATION MANUAL A REVOLUTION IN ROOFING

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Duration & Oakridge Shingles

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT:

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Transcription:

Shingles Installation Instructions

CAUTION DO NOT REMOVE THE RELEASE TAPE The release tape on the top of the OAKRIDGE SUPER TM is designed to prevent adhesion between the shingles, so please do not remove the release tape for installation. IMPORTANCE OF WIND PERFORMANCE Due to geographic location, roof slope and orientation of the house on the site, it is important to choose the right roofing materials that can help protect your home. When applied in accordance with these instructions, Owens Corning s OAKRIDGE SUPER TM laminated shingles are rated for 180km/h winds performance. Owens Corning (NYSE:OC) is making headlines as a world leader in building materials systems and composite solutions. Owens Corning is a leading global producer of residential and commercial building materials, glass-fiber reinforcements and engineered materials for composite systems. A Fortune 500 Company for 60 consecutive years, Owens Corning is committed to driving sustainability by delivering solutions, transforming markets and enhancing lives. Celebrating its 75th anniversary in 2013, Owens Corning is a market-leading innovator of glass-fiber technology with sales of $5.2 billion and about 15,000 employees in 27 countries on five continents. 1. Owens Corning Roofing Shingles OWENS CORNING's fiberglass reinforced asphalt shingle comes in a variety of colors. Its fiberglass reinforced core mat is coated with premium weathering-grade asphalt on both sides. Color mineral granules are applied to the exposed surface for aesthetic style and fine sand is applied to the bottom to prevent adhesion between the shingles. OWENS CORNING's fiberglass reinforced asphalt shingle is lightweight, durable, mechanically stable, and easy to apply. It is non-polluting during construction and has aesthetic features in a variety of colors. It can be applied to any roof shape including rounded, arched, and inclines of over 20% (2 IN 12 ). This installation guide explains how to install the OWENS CORNING s OAKRIDGE SUPER TM laminated shingle. When applied in accordance with these instructions, these shingles carry the Underwriters Laboratories Class A fire resistance rating, the top rating for residential shingles. They will also meet UL wind resistance Standard 997. OWENS CORNING's OAKRIDGE SUPER TM laminated shingle is designed to be installed on wood decks. When installing on concrete deck, special attention is required. Release Tape (Do Not Remove) Super Sealant Technology Mineral Surface AR Granules Weathering-grade Asphalt Fiberglas R Mat Weathering-grade Asphalt Mineral Surface AR Granules Weathering-grade Asphalt Fiberglas R Mat Weathering-grade Asphalt Before installing this product, check local building code for their roofing requirements. These shingles are designed for new or reroofing work over any properly built and supported roof deck having adequate nail holding capacity and a smooth surface. The manufacturer will not be responsible for problems resulting from any deviation from the recommended application instructions and the following precautions: Roof Top Loading: Lay shingle bundles flat. Do not bend over the ridge. Please store the product in a dry and cool place under 45ºC (113ºF) out of contact with heavy rain and strong sunlight. Color mineral granules applied on the surface of shingle may vary depending on their production lot and manufacturing plant. We recommend using shingles for one project that are produced in the same lot within 60 days of each other. Please do not mix products from different manufacturing plants. FIG 1 SHINGLE COLOR LOT. INFO. LOT # : ASP0812 Brown Wood 001 15 A 21:19 (a) (b) (c) OAKRIDGE SUPER TM Laminated Shingle Product LOT INFO. PRINTED AREA The manufacturing information (LOT Numbers) such as manufacturing plant and date is printed on the side of the package. The lot information number above indicates the production date and time in accordance with the western calendar. The first three digits (a) refer to the production date based on a 365 day calendar. The next two digits (b) refer to the production year, and the following four digits (c) refer to the production time. The shingle bundle above is the color Brown wood, produced on January 1st, 2015 at 9: 19 p.m. 2

FIG 2 2. Accessories & Other Materials Metal Drip Edges Except unique situations, we recommend using appropriate metal flashing on KS D 5201 (copper, copper alloy sheet and strip) for all eaves. FIG 2-1 Owenscorning Underlayment Length 10m Width 1m Coverage 10m²/ Roll UNDERLAYMENT We recommend using OWENS CORNING BM Korea's UnderGUARD PRO SHEET, as an underlayment that is compliant with KS F 4917 (improved asphalt underlayment: standards of the waterproof construction in a variety of structures). FIG 2-2 9mm FIG 2-3 FIG 2-4 8mm 24mm FOR CONCREATE DECK FOR WOOD DECK SHINGLE NAIL Nails that are driven through the asphalt shingle into concrete must be concrete nails specified for fixing shingles that are anti-rust, longer than 24mm (0.94 ) and more than 8mm (0.31 ) in head diameter. Nails that are driven through the asphalt shingle into wood must be stainless steel, galvanized or aluminum that are anti-rust, longer than (0.98 ) and more than 9mm (0.35 ) in head diameter. Nails that are driven through copper flashing into the above materials must be used according to instructions above and used with anti-rust washers that are more than 10mm (0.39 ) in diameter, and around 0.5mm (0.02 ) thick. Nails must be driven deeper than 19mm (0.74 ) below the bottom layer. SHINGLE CEMENT The shingle adhesive must be applied to areas with surface temperatures under 60ºC (140ºF). Damages such as blistering on the shingle surface may be caused if used in extreme temperatures or used excessively. We recommend using shingle adhesives that are compliant with ASTM D4586 Type 2. (Asbestos-Free). ASPHALT PRIMER We recommend asphalt primers that are compliant with KS M 2270 (Standards of moisture-proof and waterproof primers on the surfaces of concrete and stone structures). OTHER ROOFING MATERIALS Ridge Vent Roofing Coil Nailer Coil Nailer Hammer Cutter Ruler 3

3. DECK PREPARATION The roof deck surface must be level to ensure the quality of the entire exterior. For waterproofing and stability, poor quality plastering with divots or cracks need to be smoothed. Plaster and dry surface are required to comply with relevant roof building standards. Protrusions such as roof vents, eaves, and angular parts where the roof and wall intersect must be plastered around precisely and smoothly to facilitate the application of the asphalt shingles and copper flashing. Any construction, including following construction of asphalt shingles, which may contaminate the installed asphalt shingle must be completed first. Wood Deck When laying shingles, while making butt joints with more than 3 sheets of underlayment consecutively, roughly 2-4mm longitudinal expansion joints must be installed for every 2 underlayment to correspond to temperature variations. Ensure that butt areas are firmly fixed without gaps. Concrete Deck A leveling mortar trowelled finish is required for concrete decks. Installation Instuctions Primer Application After cleaning the deck sufficiently, 0.4l(13.5oz) of primer needs to be applied per 1m² (10.7ft²) with a brush or roller over the entire installation surface. After the primer has been applied a curing time is required for volatile liquids such as solvents to evaporate before shingles are installed. Shingles may be damaged if installed within 24 hours of primer application. 4. UNDERLAYMENT APPLICATION To prevent damages caused by heavy rain or condensation, use of an underlayment is essential on low slope areas, eaves, roof valleys, chimneys, dormers, vents, etc. FIG 4-1 Vertical seams at least 1830mm 4-1. Underlayment Application for Standard Slope Decks Apply underlayment on metal drip edges of eaves, use at least 1 fastener per 2m (6.56f) to hold in place. When laying consecutive underlayment sheets, overlap the bottom by 100mm (3.93, baseline). For continuous horizontal application, overlap by roughly 100mm (3.93 ), Apply metal drip edge over underlayment at the rake. Drip edge over felt at rake edge Nails Toplap (100mm) At least 100mm End lap FIG 4-2 Drip edge 500mm 1000mm 500mm 500mm 500mm Drip edge 4-2. Underlayment Application for Low Slope Decks Overlap underlayment sheets by 500mm (19.68 ) of each stage for low slope decks. Apply 500mm (19.68 ) starter strip of underlayment over metal drip edges at eaves. Use at least 1 fastener per 2m (6.56f) to hold in place. Use 1m (3.28ft) strip of underlayment for remaining courses. Overlap each sheet with butts staggered vertical 500mm (19.68 ) for low slope decks. For continuous horizontal application, overlap sheets by 2m (6.56f). Apply metal drip edge over underlayment at the rake. Underlayment At least End lap Wall Line 4

5. METAL DRIP EDGE APPLICATION 5-1. Construction of Finishing Flashing on Eaves and Gable The material and distance of nails to secure flashing must be applied differently by distinguishing between plywood and concrete according to blueprint, as well as between general construction areas and high wind areas. Nails must be used with washers. Washers, around the head nail, copper cut and joint area must be sealed. Ensure that nails are driven about 50mm~75mm (1.96 ~2.95 ) in from the eaves. 5-2. Construction of Finishing Flashing for Protrusions Such As Vent Pipes on the Roof Flashing runs up around protrusions on the roof at least 200mm (7.87 ), and can be adjusted depending on the amount and flow of rain. When protrusions are on concrete or galvanized nails with anti-rust metal washers must be used to hold in place. Washers and around the head nails must be sealed. The edge of flashing must be driven into the V-cut grooves on the wall, and filled with the sealant to fix firmly. When protrusions are on a Sheet Molding Compound (SMC) or Fiberglass Reinforced Plastic (FRP), anti-rust screws must be driven into flashing. The edge of flashing must be sealed with silicone to prevent seepage of water into the building. To prevent seepage of water into the building, install gutters with standing seam flashing at the bottom of shingles. 6. Shingle Application 6-1. FASTENING INSTRUCTION Fasteners (shingle nails) must be placed in the following areas; nail line fastening area where is 160mm above the bottom edge of shingle tab, and both left and right side-end of shingle from apart. shingle side view FIG 6-1 SHINGLE NAIL 4PCS 4pcs Fastening Application Use four fasteners (shingle nails) in normal wind areas. FIG 6-2 (160mm) SHINGLE NAIL 6PCS 6pcs Fastening Application Use six fasteners (shingle nails) for mansard roof construction. FIG 6-3 SHINGLE NAIL 6PCS (160mm) PLASTIC CEMENT 51mm ROOF/SHINGLE CEMENT For slopes exceeding 60 degree or 21 inches per foot, use six fasteners (shingle nails) and four spots of asphalt plastic cement per shingle. Apply immediately; one diameter spot of asphalt plastic cement under each shingle tab. Center asphalt plastic cement 2 up from bottom edge of shingle tab. (where required must meet ASTM D-4586 Type I or II Asbestos Free) 5

6-2. STARTER COURSE When making starter strips using three-tab shingles, trim tabs off (20mm below the factory-applied sealant) so sealant can seal along the eave s edge. Then apply adhesive 3mm (0.11 ) thick at the bottom, around 30mm (1.18 ) away from the eave edge. FIG 6-4 1000mm FIG 6-5 Underlayment 333mm 20mm 1000mm 165mm 190mm 30mm 30mm Starter FIG 6-6 O Good Case Wrong Case X CAUTION When installing three-tab shingle starter strips, please trim tabs off before installation and do not install upside down the starter strips to ensure its wind performance. 20mm 160mm Eave 6-3. FIRST COURSE Lay all first course shingles butted on starter strips. Apply plastic cement to both exposed areas and unexposed butts for shingles used for the first course. For adhesives, follow the same instruction with the starter strips application but add adhesive to the exposed areas. Fasten securely according to nail line instructions. (refer to 6-1 Shingle Fastening) Underlayment FIG 6-7 CAUTION To aid in shingle alignment, it is recommended that chalk lines be snapped on the exposed surface of the underlayment prior to shingle application and must assure the bottom side of end joints are aligned. Please note that vertical length of unexposed butted areas may vary depending on the manufacturing process, but the vertical length of the exposed surface of the shingle must be consistent. 1st Course 337mm A blister may form on the surface if excessive adhesive is applied to areas with surface temperatures over 60ºC (140ºF). Blistering may occur if adhesives are used that are not compliant with specifications. Starter 6-4. Subsequent COURSE When subsequent course is continued from the first course on the upper side, overlap the first Next course by 165mm on the side, and place them so their top edge is butted against the bottom edge of the next course of existing shingles. The start line must be started 15~20mm below the adhesive strip of the previous course to prevent exposure of shingle nails. Nails must be driven according to the same instruction as the first course.driven according to the same instruction as the first course. FIG 6-8 6

FIG 6-9 165mm 2nd COURSE Trim 6.5 (166mm, about 1/6 of the width of the shingle) off the left edge of the shingle. Install the rest of the shingles with the same height of 133mm (5.23 ) as exposed shingles of the first course, and align the butt edge firmly in accordance with the fastening instructions. 2nd COURSE FIG 6-10 3rd COURSE 330mm 3rd COURSE Remove 13 (332mm, about 1/3 of the width of the shingle) from the left end of this shingle and apply the remaining piece over and above the second course shingle flush with edge of the second course with 133mm (5.23 ) exposure. Fasten securely according to fastening instructions. FIG 6-11 4th COURSE 495mm 4th COURSE Remove 19.5 (498mm, about 1/2 of the width of the shingle) from the left end of this shingle and apply the remaining piece over and above the third course shingle and flush with edge of the third course with 133mm (5.23 ) exposure. Fasten securely according to fastening instruction. FIG 6-12 5th COURSE 660mm 5th COURSE Trim 26 (664mm, about 2/3 of the width of the shingle) off the left edge of the shingle, install the rest of the shingles with the same height of 133mm (5.23 ) as exposed shingles on the fourth course, and align the butt edge firmly in accordance with the fastening instructions. FIG 6-13 6th COURSE 8 6th COURSE Trim 32.5 (830mm, about 5/6 of the width of the shingle) off the left edge of the shingle, install the rest of the shingles with the same height of 133mm (5.23 ) as exposed shingles on the fifth course, and align the butt edge firmly in accordance with the fastening instructions. FIG 6-14 7th COURSE Succeeding Course 7th COURSE 6 5 4 3 The 7th course is the final phase of applying shingles. Complete the subsequent installation of shingles by repeating the steps (2nd~7th courses). 2 1 7

7. Recommended Installation Manual 7-1. Hip & Ridge Application 7-2. Valley Construction FIG 7 Installation Instuctions A valley where shingles adjoined is recommended according to the following instruction: 1000mm 337mm FIG 7-3 Center Line Chalk Line 200mm B A A B While applying Hip & Ridge, either use the specified shingle (Hip & Ridge) or make one by cutting a classic shingle into three pieces as above and cutting butts from the back side as shown in the figure above. FIG 7-1 30mm Apply plastic cement 3mm (0.11 ) thick on the bottom, about (11.81 ) away from the edge of exposed part as shown in the Fig 7-1. FIG 7-2 PLASTIC CEMENT EXPOSURE AREA NAILING AREA 158.8mm Wind Direction 50mm Shingles adjoining the valley 'A' must be folded accordingly along the valley centerline. Shingle nails must be applied on the correct position (200mm or 7.87 from the centerline), and additional shingle nails must be applied on the upper edge to reinforce the shingle. Shingles adjoining the valley 'B' must be cut 500mm (19.68 ) from the valley centerline (Refer to Fig5.4 chalk line). Shingle nails must be applied on the correct position. Depending on the building structure and roof shape, plastic cement or finishing flashing may be installed. CAUTION Roof surface may be slippery, especially when wet or icy. Use a fall protection system when installing. Wear rubber-soled shoes. Walk with care. Falling Hazard : Secure area below work and materials on roof. Unsecured materials may slide on roof. Place on level plane or secure to prevent sliding. Wear a hard hat. When applying ridge, ensure that they overlap so that the outer edge is exposed as 133mm (5.23 ) with the consideration of wind direction. Position nails 160mm (6.29 ) away from the edge of exposed parts and (0.98 ) away from the end of both the left and the right. (Refer to Fig 7-2) THE PINK PANTHER & 1964-2015 Metro-Goldwyn-Mayer Studios Inc. All Rights Reserved. The color PINK is a registered trademark of Owens Corning. 2015 Owens Corning. Pub. No. 65721511. Printed in Seoul, Korea. AUGUST 2015. 8