STACKING MULTI-SLIDE DOOR SYSTEM

Similar documents
POCKETING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Tools required by installer: Materials required by installer:

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

VISTALUXE CASEMENT, AWNING, & PICTURE WINDOW

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

STERLING DOUBLE HUNG & STUDIO WINDOWS

Installation Recommendations for Finless Frame Doors

Sliding Glass Door Assembly and Installation Guide

Pocket Door Installation Instructions

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Installation of Fiberglass Windows

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

Curtain Wall Installation Guide

InstallatIon InstructIons for 2-lIte PatIo Door unassembled

I n s t a l l a t i o n I n s t r u c t i o n s

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Vinyl Windows Manufactured by VPI Quality Windows

InSTallaTIon InSTruCTIonS For 4-lITe PaTIo Door unassembled

HERITAGE CASEMENT BOW & BAY WINDOW

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Series 7650 Installation Instructions Sliding Glass Door

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INOVO 2-LITE SLIDING PATIO DOOR

4-lite Patio Door. Installation Instructions

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Vinyl Sliding Glass Door Assembly Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions

ASSEMBLY AND INSTALLATION INSTRUCTIONS for Premium Aluminum and Premium Atlantic Aluminum Sliding Patio Doors (JII020)

Integrity Polygon and Round Top Installation and Finishing Instructions

How To Install Windows: Nail-Fin Application

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Flashing Materials. Rough Opening Preparation

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

Vinyl Windows and Doors

Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

SLIDING GLASS DOOR ASSEMBLY INSTRUCTION Series 680/780

Eagle clad double-hung window installation instructions

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

window installation Guide wood FRaMinG New Construction

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Panel Assembly and Installation

All Window Installation Instruction

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Before installation, check your local and state requirements for this type of install.

Vinyl Windows and Doors

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

Keltic Series QUANTITY. 4 Each. 8 Each. 60 Each. Door Latch Keeper. Sill Bumper (Intermediate) Collector for Track 2. Stainless Steel Track

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Contemporary 3 Panel Classic 5 Panel French Panel

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

Chapter 9. Windows and Exterior Doors

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Window Frame Installation Instructions For Nail-on and Block Frames

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

INTERIOR. Checkrail. Flashing tape

Window with Nail fin (New construction)

Transcription:

SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal of windows & doors may cause this paint to be disturbed. In order to minimize exposure to lead-based paint dust, please consult www.epa.gov/lead for more information. Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. Wausau, Wisconsin 54401 www.kolbe-kolbe.com 5154210

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS SMSD 1 NOTICE Failure to install and maintain our product according to these instructions will void any warranty, written or implied. The installer is responsible for consulting the contractor, structural engineer, architect, or consumer, for proper installation according to local codes and/or ordinances.! WARNING Proper Eye and Hearing Protection must always be worn when installing, removing or performing adjustments to Kolbe window and door products.! CAUTION Some codes require the use of pressure treated lumber to line rough openings. Corrosion resistant materials, such as stainless steel or hot-dip galvanized steel, must be used for fasteners and anchors having direct contact with pressure treated lumber. NOTICE Before applying sealant or adhesive pads, make sure the area to be sealed is clean, dry, and frost-free. Use color-matching or transparent sealant. Photos show contrasting sealant for clarity and demonstration only. Use a dab of sealant behind any exterior-facing screws or nails. NOTICE It is highly recommended that Multi-Slide systems are installed in areas with sufficient overhangs as required to prevent water or air infiltration. The suggested overhang of the structure should match the height of the unit being installed. Failure to do so may result in structural damage to the surrounding area, finishes and/or systems. ITEMS REQUIRED BY INSTALLER Hearing protection device Safety glasses/goggles (clear or color matching) Caulk gun Level Square Hammer Shims Phillips head screwdriver/bit Tape measure Flat head screwdriver Flashing tape Fiberglass insulation Putty knife Power drill with 7/64" (3mm) and 3/16" (5mm) bits Sill Pan Closed cell foam backer rod in 1/2" (13mm) and 1" (25mm) diameter ITEMS PROVIDED BY KOLBE Unit Rough Opening & Elevation Drawings Frame - Head, Side Jambs and sill (to be assembled in field) Stationary Panel(s) (quantity will depend on unit configuration ordered) Active Panels (quantity will depend on unit configuration ordered) Frame Assembly screw package Sill Install screw package for wood sub-floor application (If masonry application, Tapcon screws supplied by other) Head Jamb Install screw package Astragal screw package Handle Stop package (handle stops & screws) Head Track Caps (quantity will depend on unit configuration ordered) Side Jamb Track Caps (quantity will depend on unit configuration ordered) Sill Track Caps (quantity will depend on unit configuration ordered) Nailing Fin (4 pcs - 1 for each side of frame) Foam corner seals for nail fin (one for each corner at the top of the unit) Frame Nosing corner seals (one for each frame nosing corner at the head of the unit) Handle set Strike - shipped loose or temporarily attached w/ slotted holes only (final screws drilled & installed after installation & wheel adjustment) Panel adjustment caps (quantity depends on # of panels) (used on holes for roller adjustments and hole for securing stationary panel to frame) Foam Head Blocks (quantity depends on number of panels) Reticulated Foam for Weeps (quantity depends on length of sill) Astragal (Bi-parting units or 90 units only) 90 corner unit instruction sheet (supplemental sheet if needed) UNIT PREPARATION Before installing your Kolbe Multi-sliding Door System, unpack all components; check each against the packing slip and place back into packaging near the appropriate opening until ready to install. If there is any damage or missing parts, please let your distributor know immediately.

SMSD 2 Often shop drawings are revised so system dimensions may change during the order and design phase. Before you begin make sure you have the final approved shop drawings verified to be correct before the installer arrives. Construct opening per drawings. OPENING INSPECTION Inspect the rough opening prior to installation for proper size requirements and ensure that it is plumb, square and level. Typically, the rough opening should be 1 (26mm) wider and 1/2 (13mm) higher than the outside measurement of the door frame. Masonry openings should be 1 (26mm) wider and 1/2 (13mm) higher than the nosing/exterior casing. Verify Header Support Confirm that the roof over the system is stacked and take into consideration the amount of weight of any materials at this location that may cause deflection of the header. No more than 1/8 deflection is allowable for proper system operation. The material/lumber quality and the fasteners must be structurally adequate for design load requirements. (Fig. 1) Verify that the concrete or sub-floor of the rough opening is level. The frame system may be shimmed to compensate for an uneven floor, but this may adjust the relationship of the system sill to the finished floor and may increase the overall height of the system in the opening. Any serious deflection in the concrete or sub-floor where the system is to be installed must be corrected prior to installation. (Fig. 2)! WARNING Sill sagging and/or humping will affect unit operation. Assure that all opening measurements match those noted on the drawings that are provided with the system. (Fig. 3) Fig. 1 Fig. 2 Fig. 3 OPENING PREPARATION Make sure the opening is clean and free of debris and/or installation materials. It is critical the sill is level for proper system operation. No crowns or valleys on the sub fl oor. FLASHING REQUIREMENTS Kolbe recommends following ASTM E 2112 guidelines for sealing and flashing exterior doors. Maintain a gap of at least 1/2" (6mm) between the door frame and the rough opening structure. Create a proper seal between the door and the building exterior. For more details, see our pamphlets Information and Flashing Information. These publications are available from your Kolbe window & door supplier or visit www.kolbe-kolbe.com to download a copy. SILL PAN FLASHING A sill pan is REQUIRED for installation of a Multi-slide door system. Follow ASTM E 2112 standards when making and installing the sill pan. Min. 3/4 rear leg height Make sill pan to rough opening dimensions and dry fit it in the opening. The rear leg is required to be a minimum of 3/4 high. (Fig. 4) Install and attach sill pan to rough opening per ASTM E 2112 standards, making sure that the sill pan is level once installed. Fig. 4 Sill Pan

SMSD 3 FRAME ASSEMBLY NOTE: For 90 Corner Units, the head and sill frame corners at the 90 intersection will be attahced upon installation into the opening. Make sure you have a clean flat surface to help protect the frame when assembling. Lay frame head, sill, and side jamb(s) on the clean flat surface with the exterior side up. Slide nailing fin into each jamb nosing where needed (Fig. 6). Apply the frame nosing corner seals to the top corner (45 angle) each side jamb. (Fig. 5) Attach the side jamb(s) to the head using the screws supplied in the Frame Assembly screw package. Make sure the screws pass through the side jambs and into the screw bosses in the head. (Fig. 6) Attach the side jamb(s) to the sill using the screws supplied in the Frame Assembly screw package. Make sure the screws pass through the side jambs and into the screw bosses in the sill nosing. (Fig. 6) Attach the side jamb frame nosing to the head jamb frame nosing using the screws provided in the Frame Assembly screw package. Fig. 6 Slide nail fi n into jamb Frame Nosing Corner Seal HEAD BASE FRAME (EXPLODED VIEW - SHOWN WITHOUT FRAME NOSING ATTACHED) SIDE JAMB SIDE JAMB Frame Nosing SILL Fig. 5 Fig. 6 EXTERIOR FRAME PREPARATION Seal the end of the open cavities at the head and sill of the side jambs with sealant. (Fig. 7) On each end of the sill, fill the small gap between the sill nosing and the interior wood trim on the interior of the side jamb with sealant. (Fig. 8) Head of Unit Screws securing side jamb to head jamb Side Jamb Seal w/ sealant Fill w/ sealant Fig. 7 Fig. 8

SMSD 4 Place a piece of reticulated foam into each weep slot on the sill nosing at the exterior. (Fig. 9) Apply the foam corner seal to the nailing fin on each corner at the head of the unit. (Fig.10) Run two 3/16 beads of sealant on the backside of the nail fin on the head and sides as shown in Fig. 10. 3/16 BEADS OF SEALANT Reticulated foam pad Bottom of Sill NAIL FIN of sill nosing SEAL AROUND EDGES OF ADHESIVE CORNER SEAL Fig. 9 On the bottom (underside) of the sill, apply a dab of sealant on each pre-drilled hole. (Fig. 11) Apply a 3/16 bead of sealant on the rear upturned leg of the sill pan where the back of the sill will contact the sill pan. (Fig. 12) Each circle on the sill represents a pre-drilled hole w/ applied to it Fig. 10 FOAM CORNER SEAL Weep Slots (Do not place sealant next to or in weep slots) 3/16 bead of sealant on interior leg of sill pan Fig. 11 Bottom View of Sill FRAME INSTALLATION Place assembled frame in rough opening. If it is a 90 unit the corner keys will need to be inserted into the head nosing and head track(s) at this time. See supplemental instruction for 90 corner units. Drill wood sub-floor through the factory pre-drilled holes located in the sill. Using a straight edge or level, verify that the sill is level and flat. Use shims as needed to flatten the sill. Apply sealant in each pre-drilled hole in the sill. Attach using fasteners located in the Sill Install screw package. For 90 units make sure the sill pieces are properly aligned prior to fastening the sill to the sub-floor. There are no corner keys for the sill tracks. (For masonry application, Tapcon screws are required and are supplied by others.) Fig. 12 Prior to attaching the head, square the frame to within the allowable tolerances. Using a straight edge and/or level, verify that the top track/head is level and flat. Use shims as needed to level and flatten the head. Attach the head through the pre-drilled holes using the screws located in the Head Jamb Install screw package. Using a straight edge and/or level, verify that the side jambs are level and flat. Use shims as needed to level and flatted the jambs. Attach the side jambs through the factory pre-drilled holes using the screws located in the Head Jamb install screw package. There will be 2 screws with rubber bumpers applied in the accessory kit per jamb cavity that accepts a door in the open position. These screws need to be applied to the top and bottom holes of each cavity. 3mm 1/8 3mm 1/8 Max Fig.13 +- 3mm 1/8

SMSD 5 Cross measure the frame to confirm there is no variance larger than 1/8 per measurement and that the frame is square to within 1/8 horizontally and vertically. (Fig. 13) Make sure sill weep slots are not blocked or clogged. PANEL INSTALLATION (Panels are installed from the exterior of the unit) Beginning with panel marked #1, holding the panel at an angle toward the head track, insert the top of the panel into the inner most head track and swing the bottom of the panel inward until it is parallel with the top and sits with the wheels on the corresponding sill track. (Fig. 14) Repeat steps for all remaining panels in sequential order. (Fig. 14) Lock the stationary panel in place by inserting a larger flat head screwdriver into the hole on the interior of the panel and turning it to the locked position. Once the hardware is locked into the side jamb, plug the hole with the provided panel adjustment cap. (Fig. 15) HEAD Insert larger flat head screwdriver and turn to lock hardware into frame Plug hole with panel adjustment cap Fig. 14 SILL Fig. 15 ASTRAGAL INSTALLATION For Bi-parting doors - Trim the interior astragal cover to fit over the sill nosing extentions. The amoung that needs to be trimmed is determined by the number of sill nosing extensions x 1/2 (see inset of Fig. 16). Attach the astragal to the meeting panel without locking hardware on it. Line up the pre-drilled holes on the panel and astragal and secure the astragal in place using the supplied screws from the Astragal screw package. (Fig. 16) For 90 units - See supplemental instruction for 90 corner units. Interior Interior Astragal Cover Panel without locking hardware installed Astragal Fig. 16 Amount trimmed = # of sill nosing extensions x 1/2 PANEL ADJUSTMENT The panel rollers may need to be adjusted for the unit to function properly. Slide the active panel open slightly, just enough to see the weatherstrip and side stop. Check for a consistent margin. To adjust the margin, remove the panel adjustment caps on the bottom panel rail. Insert a flat head screwdriver into the hole and turn. This will raise or lower one corner of the panel. When done with adjustments, plug the holes in the active panel with the panel adjustment caps. (Fig. 17) Do not use a power driver! Fig. 17

SMSD 6 INTERIOR SILL NOSING EXTENSION APPLICATION If required, add the correct amount of interior sill nosing extensions to the interior of the unit so your unit will meet the required performance standard. Run sealant on the interior sill nosing and sill nosing extensions as shown in Fig. 18. Also, make sure to completely seal the ends of the sill nosing extensions. (Fig. 19 shows the sill nosing extensions and track cap filler correctly installed on the sill nosing.) Track Cap Filler Sill Nosing Extension Fig. 18 Sill Nosing Fig. 19 FOAM BLOCK AIR BARRIER INSTALLATION The foam head block is shown in white for demonstrative purposes. The foam head blocks being installed on your unit will be black. Each foam head block needs to be placed in each track where the head track cap ends. Temporarily locate the head track cap in the head track to determine placement of foam head block. (Fig. 20 & 21). The foam head block needs to stick out 1/16 to 1/8 past the end of the head track cap (Fig. 21). Once you have correctly placed the foam head block, run sealant on the back side of the foam block, up each side and along the top as shown in Fig. 22. Foam Head Block (needs to stick out 1/16-1/8 past Head track cover) Foam head block Fig. 20 Fig. 21 Head track cover (installed later, shown for demonstrative purposes only) Head Track Cap Fig. 22 Fig. 23

SMSD 7 TRACK CAP INSTALLATION Install the head track caps on the exterior facing tracks. Determine what track each cap goes into based on its overall length before installing. Make sure the track cap is tight against the side jamb and gently insert it in place. (Fig. 23, previous page) Install the side jamb track caps on the exterior of the locking side jamb by fitting it to the head jamb and gently insert it in place. (Fig. 24) Sill Track Cap Side Jamb Track Cap Fig. 24 SILL TRACK CAP INSTALLATION Install the sill track caps on the exterior sill tracks. Determine what track each cap goes into based on its overall length. Make sure the track cap is tight against the side jamb and gently insert it in place. (Fig. 25) HARDWARE Install the supplied handle set(s) according to the supplied manufacturers instructions. HANDLE STOP ATTACHMENT (Lever handles and panels w/ Astragals only) Any units with a lever handle or astragal will need to have a handle stop applied to the top and bottom on the exterior face of the panel at the pre-drilled hole locations. The handle stops and appropriate screws are located in the Handle Stop package. See figs 26 & 27. (On units with 3 top rails, the top handle stop will be applied horizonatally.) Fig. 25 Handle Stop location on units with Astragal and without lever handle Handle Stop location for units with a lever handle Fig. 26 Fig. 27 RECYCLING Care must be taken to properly recycle or dispose of old materials. Any recyclable materials should be separated from nonrecyclable or hazardous materials. Please consult with local or state authorities regarding proper disposal of non-recyclable or hazardous materials. Contact your Kolbe window and door supplier or visit us at www.kolbe-kolbe.com for further information. THANK YOU FOR PURCHASING KOLBE PRODUCTS. Kolbe & Kolbe Millwork Co., Inc. reserves the right to change specifications without notice. 2015 Kolbe & Kolbe Millwork Co., Inc. 5154210 04/15