INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

Similar documents
INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

SERIES 900 TERRACE DOOR WITH TRANSOM AND SIDELITES

INSTALLATION INSTRUCTIONS SERIES 3600 SUNSHADE SYSTEM

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

ELEPHANT DOOR SYSTEMS SERIES E1200

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

4500 Series. Fabrication and Installation Instructions

14000 Series. Fabrication and Installation Instructions

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Series Sloped glazed Curtain wall. Installation Instructions

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

14000 Series. Fabrication and Installation Instructions

Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

Sun Control-Solar Eclipse-Solar Shelf

Storefront Installation Guide

e-lite fabrication/assembly and Installation instructions

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

INSTALLATION INSTRUCTIONS SERIES 8000 SINGLE HUNG WINDOW BLOCK OR FIN FRAME

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

SERIES 8100 FIXED WINDOW BLOCK OR FIN FRAME

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

Storefront Installation Guide INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL STOREFRONT DOORS

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

Installation Instructions

Series Advanced and alternate. Installation Instructions

Installation Instructions

YSD 400 Sliding Door System Installation Manual

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS

SECTION C1 INSTALLATION INSTRUCTIONS

YOW 225 TU Window System

SERIES 2100/2200 CURTAIN WALL

TCR 250 THERMAL COMPOSITE RIBBON WINDOW

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

YES 40 FS/FI Storefront System Installation Manual

YCW 752 Outside Glazed Curtain Wall System Installation Manual

Series Exterior glazed curtain wall. Installation Instructions

INOVO 2-LITE SLIDING PATIO DOOR

SERIES CF450 INSTALLATION INSTRUCTIONS. SERIES CF450 1¾ x 4½ - B1. Fabrication for Panel Assembly. High Performance Non-Thermal Storefront System

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

INSTALLATION INSTRUCTIONS 2 1/2 x 7 for 1 Glass

Installation Recommendations for Finless Frame Doors

INSTALLATION INSTRUCTIONS

SERIES 2100/2200 CURTAIN WALL

YES 600 Thermal Clip Storefront System Installation Manual

SERIES CF451T INSTALLATION INSTRUCTIONS. SERIES CF451T 2 x 4½ - B2. Fabrication for Panel Assembly. High Performance Thermal Storefront System

YES 45 TU Thermal Storefront System Installation Manual

Sun Windows General Information New Construction Hinged Door Installation Instructions

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Pocket Door Installation Instructions

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

INSTALLATION INSTRUCTIONS

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! OCTOBER Phone: OLDCASTLE ( ) Web Address:

SECTION HOLLOW METAL DOORS AND FRAMES

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

Versatrac R-System Stock Extrusions, Clips and Accessories

CLASSIC GLASS BOTTOM ROLLING SYSTEM INSTALLATION

SECTION B INDEX STOREFRONT FRAMING SYSTEMS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Frames and Entrance Doors

YSG 40/50/50T Window Wall System Installation Manual

YWE 40 T Window Wall System Installation Manual

Heavy Wall Applied Stop Tube Frame and Door Installation

Revision Date: April 01, Paramount Enclosure

CRL JACKSON 900 SERIES

SECTION BULLET- RESISTANT DOORS

Window Frame Installation Instructions For Nail-on and Block Frames

Series 7650 Installation Instructions Sliding Glass Door

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

YES 45 FS/FI Storefront System Installation Manual

400 SERIES VERTICAL INSTALLATION

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

YES 45 XT High Performance Thermal Storefront System

Versatrac R-System Stock Extrusions, Clips and Accessories

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

SERIES 406X. Installation Instructions. Place photography here. Don t go over grey area. (size w x h )

Integrity Polygon and Round Top Installation and Finishing Instructions

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

Transcription:

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com 11M0292

HANDLING, STORAGE, AND PROTECTION OF The following precautions are recommended to protect the material against damage. Following these precautions will help ensure early acceptance of your products and workmanship. A. HANDLE CAREFULLY. All aluminum materials at job site must be stored in a safe place, well removed from possible damage by other trades. Cardboard wrapped or paper interleaved materials must be kept dry. B. CHECK ARRIVING MATERIALS. Check for quantity counts and keep records of where various materials are stored. C. KEEP MATERIALS AWAY FROM WATER, MUD, AND SPRAY. Prevent cement plaster or other materials from damaging the finish. D. PROTECT THE MATERIALS AFTER ERECTION. Protect erected frame with polyethylene or canvas splatter screen. Cement, plaster, terrazzo, other alkaline solutions, and acid based materials used to clean masonry are harmful to the finish. If any of these materials come in contact with the aluminum, immediately remove with water and mild soap. ORDER OF ASSEMBLY AND INSTALLATION Handling, Storage, and Protection of Aluminum... 02 General Installation Notes.... 03 Sidelite Fabrication.... 04-05 Sidelite Assembly... 06 Sidelite Attachment to Door... 07 Sidelite Attachment to Door with Transom.... 08 Sidelite Glazing... 09 The rapidly changing technology within the architectural aluminum products industry demands that C.R. Laurence/U.S. Aluminum reserve the right to revise, discontinue, or change any product line, specification, or electronic media without prior written notice. NOTE: Dimensions in parentheses ( ) are millimeters unless otherwise noted. 02

GENERAL INSTALLATION NOTES RECOMMENDED GUIDELINES FOR ALL INSTALLATIONS: 1. REVIEW CONTRACT DOCUMENTS. Check shop drawings, installation instructions, architectural drawings, and shipping lists to become thoroughly familiar with the project. The shop drawings take precedence and include specific details for the project. Note any field verified notes on the shop drawings prior to installing. The installation instructions are of a general nature and cover most conditions. 2. INSTALLATION. All materials are to be installed plumb, level, and true. Install operable windows pre-glazed only. 3. BENCH MARKS. All work should start from bench marks and/or column lines as established by the architectural drawings and the general contractor with guaranteed accuracy. Working from these datum points and lines determine: a) The plane of the wall in reference to offset lines provided on each floor. b) The finish floor lines in reference to bench marks on the outer building columns. c) Mullion spacing from both ends of masonry opening to prevent dimensional build-up of daylight opening. 4. FIELD WELDING. All field welding must be adequately shielded to avoid any splatter on glass or aluminum. Results will be unsightly and/or structurally unsound. Advise general contractor and other trades accordingly. AII field welds of steel anchors must receive touch-up paint (zinc chromate) to avoid rust. 5. SURROUNDING CONDITIONS. Make certain that construction which will receive your materials is in accordance with the contract documents. If not, notify the general contractor in writing and resolve differences before proceeding with work. 6. ISOLATION OF. Aluminum to be placed in direct contact with uncured masonry or incompatible materials should be isolated with a heavy coat of zinc chromate or bituminous paint. 7. SEALANTS. Sealants must be compatible with all materials with which they have contact, including other sealant surfaces. Consult with sealant manufacturer for recommendations relative to joint size, shelf life, compatibility, cleaning/priming, tooling, adhesion, etc. It is the responsibility of the Glazing Contractor to submit a statement from the sealant manufacturer indicating that glass and glazing materials have been tested for compatibility and adhesion with glazing sealants, and interpreting test results relative to material performance, including recommendations for primers and substrate preparation required to obtain adhesion. The chemical compatibility of all glazing materials and framing sealants with each other and with like materials used in glass fabrication must be established. This is required on every project. 8. FA S T E N I N G. Within the body of these instructions "fastening" means any method of securing one part to another or to adjacent materials. Only those fasteners used within the system are specified in these instructions. Due to the varying perimeter conditions and performance requirements, perimeter and anchor fasteners are not specified in these instructions. For perimeter and anchor fasteners refer to the shop drawings or consult the fastener supplier. 9. BUILDING CODES. Due to the diversity in state/provincial local, and federal laws and codes that govern the design and application of architectural products, it is the responsibility of the individual architect, owner, and installer to assure that products selected for use on projects comply with all the applicable building codes and laws. U.S. Aluminum exercises no control over the use or application of its products, glazing materials, and operating hardware and assumes no responsibility thereof. 10. EXPANSION JOINTS. Expansion joints and perimeter seals shown in these instructions and in the shop drawings are shown at normal size. Actual dimensions may vary due to perimeter conditions and/or difference in metal temperature between the time of fabrication and the time of installation. Gaps between expansion members should be based on temperature at time of installation. 11. WATER HOSE TEST. As soon as a representative amount of the wall has been glazed (500 square feet or 46.5 m 2 ) a water hose test should be conducted in accordance with AAMA 501.2 specifications to check the installation. On all jobs the hose test should be repeated every 500 square feet (46.5 m 2 ) during the glazing operation. 12. COORDINATION WITH OTHER TRADES. Coordinate with the general contractor any sequence of the installation that involves other trades in the project (i.e. framing, fire proofing, back-up walls, partitions, ceilings, mechanical ducts, converters, etc.). 13. CARE AND MAINTENANCE. Final cleaning of exposed aluminum surfaces should be done in accordance with AAMA 609.1 for anodized aluminum and 610.1 for painted aluminum. 03

SIDELITE FABRICATION 1. Identify the components of the Terrace Door/Patio Door Sidelite. See DETAIL A Thermally Isolated Main Body 9/16 Drill Jamb 7/32 Drill NP257 Bulb Gasket Glass Stop Mounting Strip Cat. No. 8X12FHPSMS, #8 x 1/2" Flat Head Phillips Screw Glass Stop with Gasket included DETAIL A JAMB 13/16 (20.6) 3 (76.2) Vertical extrusion 3/4 (19.1) 2. Drill 9/16" access holes and 7/32" screw holes on each end of all vertical members. See DETAIL B. 3. Notch each end of the vertical members as shown in Detail C. DETAIL B 1-13/16 (46) Jamb 1-13/16 (46) Vertical extrusion DETAIL C 04

SIDELITE FABRICATION (CONTINUED) 4. Notch the tabs on each end of all Glass Stops and Mounting Strips at sills, forming a weep hole when assembled. 4" (102 ) 3/4" (19.1 ) JAMB SILL Notching forms Weep Holes 5. Notch each end of the horizontal members as shown in DETAIL D. JAMB 4-1/4" (108) 1/2" (12.7) HORIZONTAL EXTRUSION 1/4" (6.3) 1/2" (12.7) 1/2" (12.7) WEEP HOLE SILL DETAIL D 05

SIDELITE ASSEMBLY 1. Assemble the vertical and horizontal members using Cat. No. 10X1HWSMS, #10 x 1" Hex Washer Head Screws. Apply CRL RTV408 Sealant to all ends of the horizontals before assembly. See DETAIL E. Apply CRL RTV408 Sealant at all four corners of horizontals. DETAIL E 2. Install Corner Caps. Apply CRL RTV408 Sealant to top and bottom of jambs and EC96499 End Dams as shown in DETAIL F. Secure with Cat. No. 8X1FHPSMS Flat Head Phillips Screw. Seal over screw head. Cat. No. 8X1FHPSMS, #8 x 1 Flat Head Phillips Screw Apply CRL RTV408 Sealant to exposed end of vertical jambs at head and sill. Apply 1/4 bead of CRL RTV408 Sealant full perimeter of End Dam angle. Part# EC96499 End Dam DETAIL F 06

SIDELITE ATTACHMENT TO DOOR 1. Run a perimeter bead on the adjacent door jamb with CRL RTV408 Sealant. DETAIL G 2. Align and clamp the sidelite mullion to the door strike jamb in place. 3. Going through the door frame, attach the sidelite with #10 x 1-1/2" Flat Head Phillips Screws, 12" O.C. See DETAIL G. NOTE: The screw heads should be countersunk and flush with the glazing channel. See DETAIL H. CRL RTV408 Sealant HELPFUL HINT: Compress *NP257 gasket while installing fasteners to prevent damage to the gasket. Use caution not to mar the door stop fin or the frame members. Door Sidelite DETAIL G #10 x 1-1/2" Flat Head Phillips Screw A continuous bead of CRL RTV408 Sealant around the full perimeter MULLION STRIKE JAMB TOP VIEW *NP257 Gasket *NP257 Gasket DOOR * In the event a replacement gasket is required, the full door perimeter seal should be replaced. *WH358 Gasket DETAIL H WH34400300 Wedge Gasket 07

SIDELITE ATTACHMENT TO DOOR WITH TRANSOM 4. Apply CRL RTV408 Sealant to all mating surfaces. See DETAIL I. 5. Align and clamp the Sidelite in place. 6. Attach all components with #10 x 1-1/2" Flat Head Phillips Screws. Seal over all screw heads. NOTE: The screw heads should be countersunk and flush with the glazing channel. See DETAIL J. NOTE: Some conditions may require sill pan flashing within door and sidelite opening. Consult approved shop drawings for any flashing installation requirements. Door with Transom is assembled at the Factory and shipped ready to glaze. HELPFUL HINT: Compress NP257 door gasket while installing fasteners to prevent damage to the gasket. Use caution not to mar the door stop fin or the frame members. NP257 Gasket Continuous bead of sealant TRANSOM DOOR HEAD #10 x 1-1/2" Flat Head Phillips Screw Apply CRL RTV408 Sealant to both surfaces before mating! DETAIL I Drill and countersink installation holes #10 x 1-1/2" Flat Head Phillips Screw *NP257 Gasket * When replacing the NP257 door gasket replace the entire perimeter. WH34400300 Wedge Gasket DETAIL J 08

SIDELITE GLAZING 1. DETAIL K illustrates the horizontal members of a sidelite frame before glazing. 2. The illustration in DETAIL L shows the same sidelite now completely glazed. SIDE VIEWS SIDELITE HEAD Align Glass Stop Mounting Track with edge of frame Seal over screw heads Weep Holes through Mounting Track *NP257 gasket DETAIL K SIDELITE SILL SIDELITE HEAD Snap-In Glass Stop WH34400300 Wedge Gasket Cap bead of CRL RTV408 Sealant Seal over screw heads Setting Block SIDELITE SILL * When replacing the NP257 door gasket replace the entire perimeter DETAIL L 09