RITE-HITE RAINGUARD TM

Similar documents
RITE-HITE TPC. FOAM DOCK SEAL WITH HEAD CURTAIN Installation Instructions & Owner s Manual. Date of Installation:

RITE-HITE ECLIPSE Model 620G Dock Shelter Installation Instructions & Owner s Manual

RITE-HITE. ELIMINATOR TM II and COMBOSHELTER TM II. 610 Series Dock Shelters Installation Instructions & Owner s Manual. Date of Installation:

IMPACT DOOR 3000 SERIES. This Manual Covers All Doors Shipped To Date, Except For Revised Jamb Guards.

Installation Instructions Factory Style Bow Kit

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

340 & 350 SERIES BATH ENCLOSURES

HD installation guide

installation guide

LC200DS1 Double Stud Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

340 & 350 SERIES DELUXE FRAMELESS BYPASS

1-CYLINDER TORNADO LIFT INSTALLATION MANUAL

Loading Dock Safety Gate

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

6-CYLINDER TORNADO LIFT INSTALLATION MANUAL

Installation Instructions Lower Cargo Rack Bracket

Tilting Flat Panel Wall Mount Installation Guide

Owner s Manual AE PLUG AERATOR MANUFACTURING QUALITY LAWN CARE EQUIPMENT SINCE Made In CHINA REV

Rolling Curtain door Manual

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

ClearSpan End Frame Kit 26' Wide x 12' High

INSTALLATION INSTRUCTIONS

Dublin Stalls Installation Instructions

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

TABLE OF CONTENTS DESCRIPTION. Safety Instructions Assembly Operation... 7

By SP Partners, LLC. INSTALLATION GUIDE. ProTech-12

TABLE OF CONTENTS DESCRIPTION. Safety Instructions Assembly Operation... 7

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Manual Carton Closing Staplers

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Ventilation System. Installation Manual. Hog Slat Inc. Newton Grove, NC USA March

Install Instructions. NewAge Steel Welded Tall Locker

SERIES M MIXER MASTS

Transcend Overbed Table - Assembly, Maintenance and Parts Manual

BASE & WALL CABINET SETUP GUIDE BY SUNSTONE

LC200WT Security Wall Mount with Tilt for up to 32" Flat Screens

Installation Instructions HOSS Hardtop Organized Storage System

Instruction Sheet D-CPU. Secure CPU Holder

890 SERIES PIVOT STEAM DOOR

ClearSpan End Frame Kit 30' Wide x 11' High

LC6X4WTM Security Wall Mount with Tilt for up to 60" Flat Screens with VESA 600mm x 400mm or less

Models 2230 and 2240

By SP Partners, LLC. INSTALLATION GUIDE. ProTech

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

OWNER S MANUAL STORAGE SHED MODELS: STOR-96-G-W-1RH & STOR-912-G-W-1RH

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

LC200DS2 Double Stud Dual Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

Sunset Swings By Health in Motion, LLC

English FULL MOTION FLAT PANEL TV MOUNT. User Manual L102 TV Mount. 56 lb (25 kg) VESA. Supporting your digital lifestyle (

DOCK WEDGE - STANDARD

ALL SEASON PATIO COVER

STRINGING MACHINE OWNER'S MANUAL. Copyright 1998 GAMMA Sports - All Rights Reserved

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

Models 2030 and 2040

738 SERIES PIVOT SHOWER DOOR

Models 2130 and 2140

INSTALLATION INSTRUCTIONS

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

INSTALLATION INSTRUCTIONS Scout II - Fast Trac PART #

Sliding Door Kit

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

Installation Instructions Supertop with Tinted Windows

( ) CanPRO. Recommended Handle Turns: Can Size Diameter Handle Turns #2 3" 3 Revolutions #5 5" 5 Revolutions #10 6" 6 Revolutions.

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Full Height Ladder Safety Gate

Series 1600 WeatherGuard Dock Enclosure

INSTALLATION INSTRUCTIONS

Installation Instructions Tailgate Rack Bracket

LOADING DOCK SAFETY GATE

Installation Procedures For Corvette Basic/C-6 SNS 28

Security Products & Services...That Never Sleep. Sur-Lock. I/O 2000L Family of Exit Control Alarm Locks. Installation Instructions

Installation Procedures Dodge Charger R/T Scat Pak, SRT/Hellcat. SNS 66a

TITAN2-EDGE Public Access Computer Station Dual Track

Planishing hammer stand For use with SKU Planishing hammer

Models 2130 and 2140

Assembly Instructions for Model: VMPL3

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

394 SERIES STIKSTALL TM SHOWER ENCLOSURE

OWNER'S MANUAL TIE ROD, WALL & FLOOR MOUNTED JIBS. Model JIB-HC, JIB-LC, JIB-FM

INSTALLATION INSTRUCTIONS

By SP Partners, LLC. INSTALLATION GUIDE. Star

MODEL 83 Pail Handler

Owner s Manual LSP38 38 Lawn Sweeper

Oxford Stalls Installation Instructions

Spa & Hot Tub Necessities. Cover Removal System Installation & Use Manual

Installation Procedures Maserati Gran Turismo Sport SNS 85

00108/00110 INSTRUCTION MANUAL

Hip Roof Canopy Instructions

RESIDENTIAL MOTORIZED STORAGE UNIT

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

Owner s Manual CD-42 CULTIVATING DISC MANUFACTURING QUALITY LAWN CARE EQUIPMENT SINCE Made In CHINA REV

Sliding Door Kit

Installation Instruction

391 SERIES STIKSTALL TM SHOWER ENCLOSURE

Gared Pro-S Portable Backstop

Installation Instructions Hinged Roof Rack

Transcription:

RITE-HITE RAINGUARD TM RG-3000 Trailer Top Seal Installation Instructions & Owner s Manual Date of Installation: This Manual Covers All Units Shipped 8/04 to Date PRINTED IN U.S.A. PUBLICATION NO. RG30-0010 REV. E 39500013 MAY 2014

NOTES 2 Pub. No. RG30-0010 Rev. E - MAY 2014

Table of Contents General Precautions.........................3 Introduction................................3 Preparation................................3 Care & Maintenance.........................3 Installation Instructions.......................3 Standard Installation Procedure.........4 Optional Installation Procedure..........8 Fastening Methods...................8 Exploded View.............................9 Warranty.................................12 File Information Document Name: RG30-0010 Date Last Revised: 5/28/2014 Revision Letter: E General Precautions!! WARNING Post safety warning and barricade work area, at dock level and ground level to prevent unauthorized use of the dock position while service work is being performed. Introduction Thank you for purchasing a Rite-Hite RainGuard. For other applications, please contact your local Rite-Hite Sales Representative. The following installation instructions are complete for all applications of the RG-3000 Trailer Top Seal that are normally available. These instructions assume that the installer is outside the building facing the loading dock position. Preparation Remove all of the contents from the containers and check for damage. If any of the contents show signs of damage, contact Rite-Hite or your local sales representative. Illustrations Illustrations for this document are contained on drawing #RG30-0003 Care & Maintenance No regular maintenance is required to keep the RainGuard operating efficiently. At times, it may be necessary to remove excess snow buildup from on top of the header. It is also required that the dock approach be clear of snow, wheel chocks, and any other debris that may effectively raise the trailer height. Installation Instructions RG-3000 Trailer Top Seal!! WARNING Post safety warning and barricade work area, at dock level and ground level to prevent unauthorized use of the dock position while service work is being performed. If a forklift or other lifting device will be used during the installation of this unit, it may be easier to do some of the assembly on the ground and then lift the complete assembly into place. If this type of installation procedure will be used, follow the instructions under the "Optional Installation Procedure" section. If a forklift or other lifting device will not be used, follow the instructions under the "Standard Installation Procedure" section. Any application of the RG-3000 that is outside of the normal application guidelines should be referred to Order Engineering for installation instructions. Pub. No. RG30-0010 Rev. E - MAY 2014 3

STANDARD INSTALLATION INSTRUCTIONS 1. Install Channel Brackets UNIT WIDTH FASTEN BRACKETS TO WALL THROUGH BOTTOM HOLE wall simultaneously. See Fastening Methods section. At this time, drill the holes in the wall corresponding to the 5 holes across the back of the wall trim. Do not put fasteners in these holes at this time. Caulk along the top edge of the trim angle between the angle and the wall. BRACKET HEIGHT OFF GRADE (SEE STICKER) STEP 1 Measure and mark the building wall for the width of the RainGuard unit. It should be centered over the existing unit, new equipment unit, or door opening on stand alone units. The width can be determined by measuring the top bar or the front bar. The location of the holes in the mounting brackets is 3/4" in from the outside edges of the frame width. Measure and mark the building wall for the vertical height of the brackets. Refer to sticker on channel brackets for proper mounting height. (Typically, the bottom edge of the brackets should be mounted at 13'-6" off grade.) Fasten bottom of brackets to wall through existing hole in bottom of bracket. See fastening Methods section. 2. Attach wall trim to brackets 3. Attach canopy cover to top bar WRAP CANOPY COVER AROUND TOP BAR TOP BAR IS MADE FROM 1 1 2" SQUARE TUBING SLIDE EDGE WITH PLASTIC STRIP INTO THE SLOT BETWEEN THE ANGLE AND THE SQUARE TUBING STEP 3 Drape the back edge of the canopy cover over the top face of the top bar. The back edge can be determined by looking at either of the endcaps. The back edge of the endcap does not have a pocket in it. The flap with the plastic strip in it should be wrapped around the back and bottom sides of the top bar. The edge with the plastic strip should then be inserted into the slot along the bottom edge of the bar. The opening to this slot should face away from the building wall. CAULK ALONG TOP EDGE 4. Pin top bar in place ALIGN HOLES IN DRIP EDGE LEG WITH TOP HOLE OF BRACKET AND ANCHOR OR THROUGH BOLT TO WALL STEP 2 Position the wall trim on top of the channel brackets such that the holes in the legs on the trim align with the top mounting holes of the channel brackets. Fasten the trim and the top of the brackets to the PIN THE TOP BAR TO THE TOP OF THE BRACKETS WITH THE 2 1 4" CLEVIS PINS. BE SURE TO PLACE THE BRIDGEPIN IN THE END OF THE CLEVIS PIN. STEP 4 4 Pub. No. RG30-0010 Rev. E - MAY 2014

Position top bar (with cover attached) on top of the channel brackets and under the wall trim angle. The legs at each end of the top bar should face down and fit between the legs of the channel brackets. Pin the top bar to the channel brackets using the 2 1/4" clevis pins provided. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from sliding out. RAINGUARD TM RG-3000 INSTALLATION INSTRUCTIONS 6. Attach front bar Slide the legs on each end of the front bar into the corresponding end of the pivot arms. The opening to the slot along the length of the back side of the front bar should be facing up. Pin the front bar in place with the 1 3/4" clevis pins. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from pulling out. 5. Attach Pivot Arms STEP 7 STEP 5 Attach one pivot arm to the bottom of each channel bracket. Use the 2 1/4" clevis pin to hold the pivot arm in place. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from sliding out. Once each pivot arm is pinned in place, pivot the end away from the wall upwards. Hook the chain onto the D-ring located on top of the pivot arm. The other end of the chain should be attached to one of the middle holes on the channel brackets. 7. Position canopy cover around front bar Pull the front edge of the canopy cover over top and around the front bar. Slide the edge with the plastic strip into the slot on the back side of the front bar. Make sure it is seated in the slot along the entire length of the front bar. 8. Fasten top bar to building wall Using the holes that were drilled in the wall along the top, fasten the top bar and the wall trim to the wall. Use all 5 holes. See Fastening Methods section for more information. 2" SQUARE TUBING STEP 8 PIN FRONT BAR TO PIVOT ARMS USING 1 3 4" CLEVIS PINS. BE SURE TO PLACE THE BRIDGEPIN IN THE HOLE IN THE CLEVIS PIN. STEP 6 Pub. No. RG30-0010 Rev. E - MAY 2014 5

INSTALLATION INSTRUCTIONS 9. Attach seal assembly to front bar 11. Fasten seal member and canopy cover to front bar STEP 9 Slide the edge with the plastic strip in it into the slot on the back side of the front bar. This strip should be positioned in front of the strip for the canopy cover. Make sure both the strip from the canopy cover and the strip at the top of the seal assembly are seated in the channel. 10. Unhook chains from the pivot arms STEP 11 Using the tek screws and 4 brackets provided, fasten the seal member and the canopy cover to the front bar. This is done by running the tek screws through the brackets, covers, angle on the back of the front bar, and into the plastic strips that are sitting in the slot. This should be done in 4 places spaced evenly along the width of the unit. 12. Adjust front bar height if necessary STEP 10 Pivot the front bar up to release the tension on the chains that are attached to the pivot arms. Unhook the chains from the D-rings on the pivot arms and lower the front bar back down to put the tension on the canopy cover. STEP 12 Measure to see if the top of the front bar is at the appropriate height off grade (14-7 ¾.) The pivot arm extension will ship already pinned in the first hole at standard mounting height. If the bar height off grade is not correct, adjust the pivot arm extension by removing the clevis pin and sliding the arm up to the appropriate hole. Each hole raises the front bar height approximately 2 ¼. 6 Pub. No. RG30-0010 Rev. E - MAY 2014

13. Fasten endcaps to framing 14. If applicable, install center strut. RAINGUARD TM RG-3000 INSTALLATION INSTRUCTIONS FASTEN BRACKET TO BACK OF FRONT BAR WITH TEK SCREWS. BRACKET SHOULD BE CENTERED ON UNIT WIDTH. STEP 13 Put the stiffeners in the pockets on the front of the endcaps with the hole to the top. Using the tek screws and washers provided, fasten these stiffeners to the framing. Also, using the tek screws provided, fasten the back edge of each endcap to the channel bracket in 2 places. Fasten bottom edge of endcap to base unit backer or clip brackets. FASTEN C-BRACKET TO WALL, CENTERED ALONG UNIT WIDTH. MOUNT AS LOW AS POSSIBLE, MAKING SURE STRUT ASSEMBLY DOES NOT INTERFERE WITH BASE UNIT WHEN PINNED IN PLACE. TIGHTEN SET SCREWS ON BOTH COLLARS. THE COLLARS SHOULD BE ROTATED SUCH THAT THE SET SCREWS ARE ON OPPOSITE SIDES OF THE BAR. SLIDE COLLARS TIGHT AGAINST SQUARE TUBING STEP 14 The installation of the center strut consists of 4 steps. 1. Fasten C-bracket to the back of the front bar with two tek screws, making sure it is centered along the width of the unit, and also making sure that it is plumb. 2. Pin the strut assembly (including wall bracket) to the front bracket. Extend the other end of the strut to the wall to mark the location for the other bracket. This bracket should be mounted as low on the wall as possible without interfering with the base unit. 3. Once the wall bracket is in place, pin the strut in place with the 2 1/4" clevis pins provided. Make sure it is pinned to both brackets. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from pulling out. 4. Slide the slip collars tight against the square tubing and tighten the set screws in each slip collar. Pub. No. RG30-0010 Rev. E - MAY 2014 7

OPTIONAL INSTALLATION INSTRUCTIONS If a forklift or other lifting device will be used during the installation of this unit, it may be easier to do some of the assembly on the ground and then lift the complete assembly into place. If this type of installation procedure will be used, follow the instructions in this section, otherwise, follow the standard installation procedure. Install channel brackets and wall trim on the wall as described in steps 1 and 2 in the "Standard Installation Procedure" section on the previous pages. Attach cover to front bar and back bar by wrapping the cover over the top and around each bar and then sliding the plastic strips into the slots provided. See steps 3 and 7 in the "Standard Installation Procedure" section on the previous pages. The slot on the top bar should face away from the wall. The slot on the front bar should face up. Pin the front bar and pivot arms together using the 1 3/4" clevis pins. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from pulling out. Refer to exploded diagram or step 6 in the "Standard Installation Procedure" section for the orientation of pivot arms in relation to the front bar. Fastening Methods Concrete Block or Brick Wall 1. Through bolt fastening is required. Bore a hole through the building wall. Use a 3/8" diameter threaded rod with a washer, nut, and jam nut on each end - it will be necessary to install a back-upplate inside the building wall when the wall will not support the bolt. 2. Use a minimum of (2) fasteners in each channel bracket and a minimum of (5) fasteners across the width of the top bar. Concrete Tilt-Up Walls (Precast) 1. Use 3/8" lag bolts with expansion shields, 3/8" one piece anchor bolts with expansion collar, or equivalent fastener. If building wall is too thin to effectively hold the lag bolt or anchor bolt, the through bolt method of attachment is required. *See anchor manufacturer's recommendation for minimum anchor embedment to determine appropriate anchor length. Pin the top bar onto the studs located on top of the pivot arms. This can be done by sliding the legs of the top bar over the studs. Lift the assembly into place with the lift. Pin the ends of the pivot arms to the bottom of the channel brackets using the 2 1/4" clevis pins. Be sure to place the bridge pin through the hole in the end of the clevis pin to prevent the clevis pin from pulling out. Hook the chains onto the D-rings on the pivot arms to temporarily hold the framing in place. Metal Side Building 1. Through bolt method of attachment is required for this building style. It will be necessary to install a back-up plate that is fastened directly to structural members when it is not possible to fasten directly to structural building members. Use a 3/8 diameter bolt with a washer and lock nut to fasten the unit to the structural members of the building or to the back-up plates. If necessary, use a 3/8 diameter threaded rod with a washer and lock nut on each end. Move the top bar from the studs on the pivot arms into it's location on top of the channel brackets and pin in place. Make sure cover is properly wrapped around the top bar. Continue with step 8 in the "Standard Installation Procedure" section. 8 Pub. No. RG30-0010 Rev. E - MAY 2014

EXPLODED VIEW 1. Wall Trim 2. Canopy Cover 3. Installation Chain 4. Bridge pin, 3/8-7/16 x 0.0915W 5. Center Support (optional) 6. Clevis Pin, 1/2" x 2 1/4" 7. Pivot Arm 8. Clevis Pin, 1/2" x 1 3/4" 9. Front Bar 10. Seal Assembly 11. Foam Cylinder w/ Weight Pipe 12. Fiberglass Stiffener 13. Mounting Bracket 14. Screw, HWH, Drill/Tap, 1/4" - 14 x 1 1/4" 15. Top Bar 16. Pivot Arm Extension 17. Front Bar Bracket Pub. No. RG30-0010 Rev. E - MAY 2014 9

NOTES 10 Pub. No. RG30-0010 Rev. E - MAY 2014

NOTES Pub. No. RG30-0010 Rev. E - MAY 2014 11

WARRANTY STATEMENT Rite-Hite warrants that a RainGuard TM RG-3000 Trailer Top Seal(s) will be free of defects in design, materials, and and workmanship for a period of 365 days from the date of shipment. All claims for breach of this warranty must be made within 30 days after the defect is or can, with reasonable care, be detected and in no event more than 395 days after shipment. In order to be entitled to the benefits of this warranty, the products must have been properly installed, maintained, operated within their rated capacities, and not otherwise abused. Rite-Hite expressly disclaims all implied warranties including the implied warranties of merchantabililty and fitness. In the event of any defects covered by this warranty, Rite-Hite will remedy such defects by repairing or replacing any defective parts, bearing only the cost of the parts and transportation of those parts. This shall be the exclusive remedy for all claims whether based on contracts, negligence, or strict liability. Rite-Hite shall not in any event be liable for any loss of use of any equipment or incidental or consequential damages of any kind. Our mission is to improve industrial safety, security and productivity worldwide through quality and innovation. Rite-Hite Environmental Enclosures Corporation 8900 North Arbon Drive 12 Pub. No. RG30-0010 Rev. E - MAY 2014