RISK ASSESSMENT FOR SUBSEA GAS PIPELINE TO MITIGATE THE POTENTIAL HAZARDS DUE TO THE IMPACT OF THE SINKING VESSELS USING DNV RP F107 STANDARD

Similar documents
RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI.

ASSESSING THE EFFECTS OF DROPPED OBJECTS ON SUBSEA PIPELINES AND STRUCTURES

SUBSEA DROPPED OBJECTS. New GoM requirements for 2016 and their wider implicationsengineering Services Feb 2017

Study on Subsea Petroleum Pipeline Design in Deepwater

SiRCoS Submarine pipeline repair system. Carlo Maria Spinelli - Bratislava, September 2008

THE INFLUENCE OF GOUGE DEFECTS ON FAILURE PRESSURE OF STEEL PIPES

The Essentials of Pipeline Integrity Management

Design check of an S-Lay offshore pipeline launching using numerical methods

The influence of gouge defects on failure pressure of steel pipes

TECHNOLOGY QUALIFICATION MANAGEMENT

Closing the Collaboration Gap

Oil&Gas Subsea Production

Criteria of Accidental Damage by Ships Anchors of Subsea Gas Pipeline in the Gdańsk Bay Area

WHITEPAPER < RISK BASED INSPECTION METHODOLOGY FOR ATMOSPHERIC STORAGE TANKS. Author: Panos Topalis, DNV GL - Software SAFER, SMARTER, GREENER

Integrity Management of Offshore Assets

Performance-Based Safety Regulation

SUBSEA TREES INSTALATION IN DRAGON FIELD MARISCAL SUCRE PROJECT, PHASE I

Finite element analysis of circular cross sections subjected to combined loading

Offshore Pipelines. Capability & Experience

Unlocking potential with Kongsberg Digital Production Performance solutions. Mike Branchflower, Global Sales Manager Flow Assurance Kongsberg Digital

TOP OF THE LINE CORROSION COMPARISON OF MODEL PREDICTIONS WITH FIELD DATA

Technical Note: Analysis of Offshore Pipeline Allowable Free Span Length. Introduction

Offshore Wind Risks - Issues and Mitigations

Summary of Changes and Current Document Status

Thermodynamic Modelling of Subsea Heat Exchangers

By: Derek Watson and Lee Robins, Tracerco, UK

Arctic and Cold Climate. Capability & Experience

Jørn Scharling Holm DONG Energy

The Decision Aid Leak Notification System for Pigging False Alarm

2009 S. Kenny, Ph.D., P.Eng. Lecture Goals. Historical Overview. Students will be able to: Lecture 18 Pipeline Installation

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Introductory remarks

PREDICTION OF INTERACTIONS BETWEEN FPSO AND SUBSEA CATHODIC PROTECTION SYSTEMS

Int. J. of Marine Engineering Innovation and Research, Vol. 1(1), Dec (ISSN: ) 1. Dwi Priyanta 1, Anang Abdullah 2

Emerging Subsea Networks

International Journal of Marine Engineering Innovation and Research, Vol. 2(2), Mar (pissn: , eissn:

DNV GL s 16 th Technology Week

intelligent subsea control

ITF Subsea Processing Initiative. Ian McCabe - Technology Project Team Leader

Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

The potential for windpower in the Baltic Sea

DENT AND GOUGE DEFECTS ASSESSMENT: A CASE STUDY OF GAS PIPELINE

ELECTROMAGNETIC FIELD APPLICATION TO UNDERGROUND POWER CABLE DETECTION

ASME V&V Authors: Marcus Gamino Samuel Abankwa Ricardo Silva Leonardo Chica Paul Yambao

CAN JACKETS AND TRIPODS COMPETE WITH MONOPILES?

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Emergency Pipeline Repair Solutions and Future Contingency Planning

AC Voltage- Pipeline Safety and Corrosion MEA 2015

ENVIRONMENTAL ASSESSMENT (EA) PROCESS

3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing

Free-Spanning Pipelines in the Digital Age Nicholas Nielsen & Olivier Royet

INNOVATIVE SOLUTIONS APPLIED TO CONSTRUCTION OF THE BLUE STREAM GAS PIPELINE

Research Activities Plan. Appendix K Magnetic Fields from Submarine Cables

Appendix A Pipe Data and Fitting Dimensions 157. Post Course Test 173

OBSERVATORY SERVICING AND MAINTENANCE

Indian Journal of Engineering An International Journal ISSN EISSN Discovery Publication. All Rights Reserved

HSE and Quality. Sisimiut, 10th December FING: Arctic Region Oil & Gas Seminar in Training and Education

International Journal of Advanced Engineering and Management Research Vol. 2 Issue 2, 2017

Advancing Global Deepwater Capabilities

The use of Mechanical Connectors throughout Life of Field

REDUCING DEEPWATER PIPELINE INSPECTION COSTS

DS-CD-01 Rev 3

Sakhalin II Project On-site Inspection Report August 2006 by Hokkaido Raptor Research

Abstract. 1. Introduction

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

RISK MANAGEMENT IN THE OPERATIONS OF A SUBSEA PIPELINE

Rapid Deployment System. subsea pipelines

Subsea Asset Integrity. Matthew Kennedy

SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

Arctic resource recovery tests materials technology

Commercial Human Spaceflight: Self-regulation is the Future

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

BSOL: Key Standards for the Oil & Gas Industry. bsigroup.com/bsol

Project information. SINTEF Nord. Universtitetet i Tromsø. Troms Offshore. Opelion AS. Flagship Arctic Ocean Funding Source

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

Application of FRP Pipes & Other Composites in Oil & Gas Sector: Opportunities and Challenges

MU064: Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plant

Technology keynote. A connected future? Arnstein Eknes, Segment dir. Offshore Service Vessels, DNV GL 27 June 2018 DNV GL

Ultra Deep Water Subsea Pipeline Design and Assessment

Route Planning & Cable Route Surveys

IWCF Well Control Level 5. Celle Drilling Conference 2017

Self-Introduction and PhD Plan

Experimental investigation of crack in aluminum cantilever beam using vibration monitoring technique

Business Case: Oil and Gas Developments in Environmentally Sensitive Areas

Analyzing Thermal Insulation for Effective Hydrate Prevention in Conceptual Subsea Pipeline Design

OG21 TTA4: Barents Sea Gas Condensate Field Development business case. Espen Hauge

Influence of abrasive material on abrasive waterjet cutting process

Are we nearly there yet? Finding a sweet spot for seabed mining consents in New Zealand

Arctic Experiences and Challenges. PTIL seminar 25. mars 2014 Lars Myklebost Business Manager WGK Norge

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Slug Flow Loadings on Offshore Pipelines Integrity

Subsea Boosting. November 2015 John Friedemann

Articulated Concrete Block Mattresses ACBM

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

UNDERSEA INFORMATION PIPELINE SOLUTIONS FOR OFFSHORE OIL & GAS FIELDS

Survey and Geosciences. Capability & Experience

ICCP Retrofit Challenges for an Offshore Jacket Complex

Transcription:

RISK ASSESSMENT FOR SUBSEA GAS PIPELINE TO MITIGATE THE POTENTIAL HAZARDS DUE TO THE IMPACT OF THE SINKING VESSELS USING DNV RP F07 STANDARD Name: Lepi Yamba NRP: 5050079 Email: lepiyamba@yahoo.com or lepiyamba@ie.its.ac.id Department: Industrial Engineering Supervisor : Arief Rahman, ST., M.Sc Supervisor : Ratna Sari Dewi.ST., MT ABSTRACT Risk Assessment is a systematic approach in assessing hazards which provides an objective to measure the hazard and allows hazards to be prioritized and compared. Risk assessment is undertaken to determine the likelihood of injury or damage to be caused by the hazard. Physical unwanted hazards that cost millions of money and lives are likely to occur in any assets if the level of risk is not analyzed and assessed. Before safety can be implemented, the level of risk involved must be determined. This final project has been carried out on the untrenched subsea gas pipeline owned by Amerada Hess Export Limited (Indonesia -Pangkah) at zone III. The risk assessment was carried out for the impact of the sinking vessel on the pipeline under loose control conditions using DNV RP F 07. Event Tree Analysis (ETA) and DNV RP F07 were used as tools to determine the risk level. After the risk level has been known, three technical mitigation methods were designed and their material and installation costs were analyzed. The three technical methods include Submat Flexiform Concrete Mattress, U Type Pre-Cast and Massive Mess Pre-Cast Methods and U Type Pre-Cast Method was preferred best alternative forgone and applicable. Keywords: Risk Assessment, DNV RP F07, Mitigation.. Background Amerada Hess is one of the companies that specializes in the extraction and processing of oil and gas for domestic and export purposes. The company owns a gas pipeline that is laid untrenched between the main island of Java and Madura Island. The subsea pipeline owned by Amerada Hess Limited lies in between the Wellhead Platform in Block Pangkah, about -5 kilometers from the Java Sea and about 5 km West of Surabaya City. The installation of the pipe consisted of three areas where 756 meters onshore, 500 meters on coastal area and an approximation of 4900 meters in the Java Sea as shown in figure. The subsea pipeline has a length of 956 meters is divided into 5 zones of kilo post (KP) as follows. Zone I. The gas pipeline is laid 0-.5 km long, and the depth of the water is 0-.5 meter. The pipe is trenched under the sea bed. Figure. Map of the gas pipeline Zone II. The gas pipeline is laid.5-6.7 km long and.5-4 meters into the seabed. The pipeline is trenched under the sea bed. Zone III. The gas pipeline is laid 6.7-9. km long where the seabed is full of reefs and the depth of the water is 7- m. Trenching is not possible on this zone as the sea bed is rocky. Zone IV. The pipeline is 9.-7.6 km long, where the depth of the pipeline is

about 5-6 m. The pipe is trenched under the sea bed. Zone V. The pipeline is 7.6-8.4km and is located in the deep sea. The pipe is trenched under the sea bed. According to the Indonesian Regulatory Laws (Nomor 00.K/8/M.pe/997) regarding the Oil and Gas Pipeline Safety Regulation states that all subsea pipelines installed has to meet the following regulatory criteria in accordance with section and section 5 of the pipeline regulations in Indonesia. Section a. States that every subsea pipeline has to be laid meters into the seabed in areas where the depth of the sea is less than meters. b. In conditions where the seabed is more than meters deep, the pipeline has to be stabilized so that it does not move from side to side. Section 5 In situations where the section of the constitutions is not fulfilled, then risk assessment has to be carried out over the subsea pipeline so that safety precautions can be implemented. Based on the Indonesian Regulatory Laws (Nomor 00.K/8/M.pe/997) regarding the Oil and Gas Pipeline Safety Regulation, this research is carried out to fulfill section and section 5 of this constitution.. Problem Formulation Sinking vessels can be hazardous over zone III of the subsea pipeline. The problem now is: a. How to estimate the incidental probability of the sinking vessel on the pipeline due to the impact of sinking vessels under loose control conditions. b. How to estimate the consequences of sinking vessels impact energy on the subsea pipeline. c. Whether the risk level of the sinking vessel over the subsea pipeline is acceptable or not.. The Objectives In order to fulfill the existing Indonesian national laws concerning subsea gas and oil pipeline based on 00.K /8/M.pe/997 to: a) Assess the risk level on the gas-pipeline at zone III due to the impact of vessels sinking. b) Implement a mitigate safety precaution measure over the untrenched subsea gas pipeline depending on the risk level to be identified. c) Evaluate material and the installation costs involved in implementing safety mitigating precaution measures over the sub gas pipeline at zone III.. Literature Review Risk assessment is a broad term that encompasses a variety of analytic techniques that are used in different situations, depending upon the nature of the hazard, the available data, and needs of decision makers (Ian Hawkins, 998 and Frederick J, Barnard, 005). The systematic application of management policies, procedures and practices to the task of communicating through establishing the context by identifying, analyzing, evaluating, treating, monitoring and reviewing as risk management process is all concerned about (AS/NZS 460:004). The AS/NZS standard clarifies what risk assessment is all about in its risk management process. The quoted figure. is an illustration of the risk management process used by the Australia and New Zealand standards. According to David L.G (005), OSD Energy Services (004), S.F. (Steve) Biagiotti, and S.F. (Stephen) Gosse (000), defined risk assessment as the process of quantifying or measuring the level of risk associated with the operation of an asset. Risk Assessment can be done through both the quantitative and qualitative approaches based on experimental data and expert judgments. The process of risk evaluation is to make decisions, based on the outcomes of risk analysis about which risks need treatment and treatment priorities. Risk evaluation involves comparing the level of risk found during the analysis process with the risk criteria when the context was established. According to Fuller and Vassie, (004), risk estimation is the identification of the outcomes of an event and an estimation of the magnitude and probability of these outcomes. Most risk experts connote that risk estimations based on qualitative based on experts judgments and opinions and quantitative predictions through numerical evaluations (American Society of Mechanical Engineers

(AMSE), American Petroleum Institute, and (API)). Again, Fuller and Vassie, (004) stated that risk estimation is the identification of the outcomes of an event and an estimation of the magnitude and probability of these outcomes. To control the risk level requires a mitigation process by implementing a safety precaution technical measure to reduce or control the level of risk. Before mitigating risk, the need to evaluate the risk and the possible effects on the surrounding environment must be considered. If the level of risk is too high, any industries need to insure its properties that are vulnerable to the risky hazards to insurance companies apply or by applying a risk control mitigation process. DNV RP F07 standard is a risk-based approach for assessing pipeline protection against accidental external loads. Recommendations are given for the damage capacity of pipelines and alternative protection measures and for assessment of damage frequency and consequence impacts. To measure the risk level, the need to determine the frequency and the energy impact on the pipeline using the DNV RP F07 Standard is required. Figure.Risk management process. Risk Assessment Techniques and Tools The tools used in this risk assessment include the following... Event Tree Analysis (ETA) for Frequency Estimations One of the widely used methods in risk assessment technique, used to evaluate the frequency of an event through event tree analysis, coded with codes that try to define the level of risk. ETA is a tool used to find the probability of risk posed by any hazard as shown in figure... Det Norske Veritas (DNV) RP F07 Standard Figure. Even-tree analysis (ETA) used to calculate the probability In assessing the risk level for any pipeline, the acceptance of the risk criteria will follow the methodologies outline in the DNV RP 07 as an international recognized standard. To evaluate the consequence of an event, the impact energy on the subsea pipeline is evaluated using DNV RP F07 Standard. 4. DATA COLLECTION AND ANALYSIS 4. Vessel Data The vessel data shown in table 4. below, includes the types of vessels and their descriptions, the routes taken, total weight of the vessel which includes the dead weight ton (DWT) and the light weight tone (LWT) of the vessel that will impact the pipeline upon sinking. To estimate the incidental probability that will impact the pipeline, Even Tree Analysis (ETA) is used. ETA is used as a tool to estimate the incidental probability by combining the probability of three incidental conditions.

a. The probability of the vessel arriving at the untrenched Critical Accidental Damage Zone (CADZ) zone III, at loose control conditions. b. The likeliness probability of the vessel sinking at the untrenched zone III, (CADZ zone) at loose control conditions. c. The probability of each individual group vessels and sub group vessels will have on the pipeline during loose control conditions. Table 4. Vessel Data 4. Pipe Specification Data The pipe specification data shown in table 4. includes the kilo post (KP), which is the distance of each segmented zone I-Vb of the subsea. The pipe s cross-sectional diameter, its thickness and the coating thickness of the pipe as shown in table 4. are all given in millimeters. The coating density is given in kilogram per m. The type of pipe used is in accordance with the American Petroleum Institute (API) 5L X65 Standard. This standard is specifically used for pipelines to be used under the subsea pipeline. Table 4. Pipe Specification Data 4. Vessel Dimensions The type of vessels given in table 4. has the following dimensions in as shown in table 4. 4.4 Segmentation of Zone III Zone III with a kilo post (KP) of 9.- 6.7 kilometer, about 600 meters in length has been segmented into segments as shown in table 4.4 below. The KP given in kilometers has been segmented into a distance of 00 meters. Each segment is 00 meters is classified as the Critical Accidental Zone (CADZ). Table 4.4 Segmentation of zone III Table 4. Vessel Dimensions 4.5 CADZ Zone The CADZ zone shown in figure 4., is the portion of the of the 600 meter length 4

of zone III. The segmentation of CADZ zone is based on the average dimension of the vessel length. The CADZ area (00m pipeline x (x the average length of the vessels +0.0m concrete thickness +0.457m diameter of pipe) is shown in figure 4.. Table 4.6 Probability of sub vessel group and the vessel group Figure 4. CADZ zone 4.6 Grouping the Vessel Based on Weights Range To calculate the probability of individual vessel arriving at CADZ zone, the 8 vessels given in table 4. have been grouped based on the similarities of weight range as shown in table 4.5. Table 4.5 Probability of each vessel 4.7 Probability of the vessel groups and the sub vessel groups To estimate the probability of the vessel groups that will arrive at untrenched pipeline at zone III can be evaluated as shown in table 4.6. From table 4.6, the sub vessel group with the highest weight for each group has been selected. These sub vessel groups include A8, B, C, D, E, F and G. The sub vessel group A8, B, C, D, E, F and G, has the highest weight. 4.8 Probability of Vessel Arriving in Critical Accidental Damage Zone (CADZ) To calculate the probability of vessel arriving at CADZ, three scenarios have been taken into consideration. The first scenario is the consideration of the velocity in which the vessels is travelling equivalent to 5 knots, 7.5 knots and 0 knots. The second scenario to be considered is the loose control condition and the vessel arriving at the CADZ in loose control conditions as assumed to be.5%, 5% and 7.5%. And the third scenario is the probability of the vessel sinking considered to be.5%, 5% and 7.5%. This is in accordance with the Lloyd s Register for ship dimensions 4.9 Incidental Probability The probability that the vessel will arrive at the CADZ zone III can be calculated as shown in table 4.7. The scene in this scenario is that the vessel is travelling at a velocity of 5 knots, the vessel will arrive at CADZ zone is.5% and the likeliness of the vessel sinking is assumed to be.5% as well. From the probability of vessel arriving at CADZ zone, the incidental probability can be calculated as shown in figure 4.(a) and figure 4.(b) using Even Tree Analysis (ETA). Figure 4. (a) shows the incidental probability sub group vessels and the figure 4. (b) shows the probability for group vessels. 5

Table 4.7 Probability of vessels arriving at CADZ zone Figure 4. (b) ETA for st scenario of group vessels. The incidental probability of figure 4. (a) and figure 4. (b) is ranked as shown in table 4.8 as follows for both sub vessel group and group vessel. Table 4.8 Incidental Ranking probability The incidental probability of the sub vessel group and the group vessel can be represented on Even Tree Analysis (ETA) as shown in figure 4. (a). Figure 4. (a) ETA for st group vessels. scenario of sub 4.0 Consequency Estimation To estimate the impact energy of the sinking vessel that will rupture the pipe due to its sinking impact requires the calculation of the kinetic energy. Most impacts are expected to result in a relatively smooth dent shape. The dent-absorbed energy relationship for steel pipelines can be calculated using equation stated in the DNV RP F07 standard. The dent percentages are stated in the DNV RP F07 standard for both coating and non-coating as follows. 4. Non Coating Resistive Energy of the Pipe The normal energy of the pipe without coating that can resist the impact of sinking vessels can be calculated as using equation as follows. E / / / D 6.. m.. D. () P 9 T D Where: 6 E Impact energy on the pipeline in joules (J)

m P Plastic moment capacity of the wall (=.. r ) 4 y Pipe deformation, dent depth t Wall thickness (normal) Yield strength y D Steel outer diameter At the dent percentage of 5%, the impact energy of the pipe can be calculated using equation as follows. The Impact energy of the denting percentage of % to % can be calculated in the same way as shown in table 4.9 below. m p. y. r 4 6 448 x0 x(6.8 x0 ) 6.088 E 6. 9 570.4 kj / D. mp. T / /. D. D / x.4 0.457 6x x6.088 x 9 6.8 x0 57040.7 joules / 0.05 x0.457 x 0.457 / Continuation of table 4.9 DENT (%) E(Joule) E(kJ) 9 8000.48 800. 0 4665.6 46.7 44504078.67 44504.08 4770489.9 4770.49 4. Coating Energy of the Pipe As illustrated in figure 4., the impacting crushing energy of the pipe coating can be calculated using equation () as follows. Table 4.9 Impact energy at various denting percentages DENT (%) E(Joule) E(kJ) 46456.48 46.46 0804.46 08.0 40994.8 40.99 4 69965.87 699.65 5 57040.67 570.4 6 6796694.48 6796.69 7 85648.9 8564.8 8 046495.70 0464.0 9 4865.06 486. 0 46458.07 464.6 68774.0 687.74 9955.0 9.96 6767. 676.4 4 4495.05 44.95 5 68669.89 6866.9 6 95974.95 9597. 7 44867.79 44.87 8 56660.48 56.66 Figure 4. Impact on the concrete coating E k y. b. h. X () Where: E k 05 6 E x5mpa 05x0 N / m k Kinetic energy 6 y x5 Mpa 05 x0 N / m (Pressure of the pipe in N/m ). b 4.48 m (With of the average breath vessel that fractures the pipe) h. m (Length of the vessel) X 0 0.0m is the coating thickness of the pipe y. b. h. X x0 6 9495 0 x 4. 8 x joules 949. kj The Impact energy of both coating and noncoating at denting percentage of 5%, 0%, 5% and 0% can be calculated in the same way as shown in table 4.0 below.. 0 x 0. 0 7

Table 4.0 Non coating and coating energy of the pipe Dent (%) E(kJ) Non- Coating (kj) Energy Total (kj) 949. 46.46 94655.78 949. 08.0 94450.5 949. 40.99 945596. 4 949. 699.65 94689.98 5 949. 570.4 9486.75 6 949. 6796.69 949990.0 7 949. 8564.8 94758.4 8 949. 0464.0 94657.5 9 949. 486. 945679.65 0 949. 464.6 94787.48 949. 687.74 9440065.07 949. 9.96 94447.8 4 949. 44.95 944748.8 5 949. 6866.9 9450059.6 6 949. 9597. 945790.54 7 949. 44.87 9455608.9 8 949. 56.66 9458509.99 9 949. 800. 94649.55 0 949. 46.7 9464556.69 949. 44504.08 9467697.40 949. 4770.49 94709.8 From table 4.0, the non coating and coating energy ranged on the denting percentage between 0%-5%, 5-0%, 0-5%, 5-0% and the dent percentage greater than 0%. Table 4. shows the ranking of the categorical energy based on the impact energy category. equation and 4 respectively. The sinking velocity of the sinking vessel is calculated using equation.. water water D t () m V. g. C. A. V m Mass of the sinking vessel (kg) g Gravitational acceleration, (9, 8 m/s ) V Volume of the vessel (m ), where the density of steel is 7850 kg/m / by the mass of vessel water Density of sea water (i.e. 05 kg/m ) C D.5 Drag coefficient of the object A Projected area of the object in the flow direction (m ) L x B of the vessel V t Terminal velocity through the water (m/s) For Example for the vessel type PFS = 500000 kg/7850 kg/m = 8.47m, (see table 4.). m V. water. g water. C D. A. Vt ((500000 8.47 m ) x05 kg / m ) x9.8m / s x05 kg / m x.x 088.96 m xv V 98.8 m / s t The sinking velocity for the vessel type PFS can be calculated using this formular as shown above. Likewise, the sinking velocity for other vessels can also be calculates in the same way and the results are shown in table 4. below. t Table 4. Consequency Ranking 4. Impact Energy of the Sinking Vessel on the Pipe After the ranging the non-coating and coating energy of the pipe, the kinetic energy of the sinking vessel is calculated using 8

Table 4. Sinking velocity of each vessel Table 4. Hydrodynamic mass of the sinking vessel in water No P water Ca V m a 05 8.47 64. 05 955.4 97999.6 05 88.54 44848.4 4 05 59.4 66.56 5 05 88.54 44848.4 6 05 557.5 57579.6 7 05 59.6 665.6 8 05 4777.07 4896496.8 9 05 557.5 57579.6 0 05 46.5 4559 05 84.7 64. 05 4777.07 4896496.8 05 0.0 8.6 4 05 5.9 6.66 5 05.85 64. The kinetic E E energy of the sinking vessel can be calculated using the formular 4 as follows. For the vessel type PFS can be calculated as follows. E E. (4) E T E A m m. V a t 6 05 5.9 6.66 7 05 4. 4689490 8 05 59.4 66.56 The kinetic energy of the sinking vessel can then be ranked accordingly in accordance with the denting percentage ranking of DNV RP F07 as shown in table 4.4 below Where: m a by: Is the added mass (kg) found Table 4.4 Kinetic energy of the vessel and their ranking m a water 05 kg / m C 644. kg (See table 4.) a V x x 8.47 m m Total weight of ship g Gravitational force (9.8m/s ) v Volume of ship (m ) water = density of the sea water, 05 kg/m C a = coefficient of the area (m ) A = projection of the area, m V t = velocity of the vessel sinking, m/s 9

Based on the calculation of summarized incidental probability rank values of table 4.4 of the sub group vessels and the vessel groups rank values are plotted for both coating and non-coating given as shown in table 4.4. After the plotting, the risk level can be seen table 4.5(a) for sub group vessel and table 4.5(b) under non costing conditions of the pipeline for group vessels respectively. Table 4.5(a) Risk matrix plot for the sub group vessel at non coating conditions Risk Matrix Plotting for Sub Group Vessels Frequency Degree 4 5 st Scenario Consequency Degree 4 5 A8,B, C, E,D,F,G Table 4.5 (b) Risk matrix plot for the group vessel at non coating conditions Vessel group Risk Matrix Plotting for Group Vessels Frequency Degree 4 5 st Scenario Consequency Degree 4 5 A,B,C,D,E,F, G And the risk level at the condition where the pipe is coated is show at table 4.6(a) for sub group vessels and 4.6(b) for group vessels. Table 4.6(a) Risk matrix plot for the sub group vessel at coating conditions Risk Matrix Plotting for Sub Group Vessels Frequency Degree 4 5 st Scenario Consequency Degree 4 5 A8,B, C, E,D,F,G 0 Table 4.6(b) Risk matrix plot for the group vessel at coating conditions Vessel group Risk Matrix Plotting for Group Vessels Frequency Degree 4 5 st Scenario Consequency Degree 4 5 A,B,C,D,E,F, G 4.4 Risk Matrix Analysis From the risk matrix plot in table 4.5 (a), under non coating condition of the pipe, the sub group vessels A8, B, D, F,G and C falls in the medium risk level From the risk matrix plot in table 4.5(b), under non coating condition of the pipe, the group vessel A, B, C, D, E, F and G falls in the medium risk level For the coating condition of the pipe, the sub group vessels have the same risk level as the group vessels. From the risk matrix plot in table 4.6 (a), where the condition of the pipeline is coated, the sub group vessels A8, B, D, E,F and G falls in the medium risk level. From the risk matrix plot in table 4.6 (b) and where the condition of the pipeline is coated, the group vessels A, B, C, D, E, F and G medium risk level. 5 Risk Mitigation Process After the risk level being identified, mitigating such medium risk level is significantly important. The only way of reducing the risk level is through: Reducing the incidental probability by reducing the annual frequency of the number of vessels crossing over the subsea gas pipeline at zone III. Reducing consequence impact on the subsea pipeline. This can be done through the application of protective pipeline covers that shields the untrenched pipeline from the impact of the sinking vessels as well as dropped objects over zone III of the untrenched subsea gas pipeline at zone III.

Risk retention to third parties such as insurance companies. However, this cannot reduce the risk level being identified. Risk retention is to compensate for the damages that will occur if such accidents occur. Figure 5. for U Type Pre-Cast Method 5. Technical Mitigation Process To mitigate the medium risk level of the sinking vessels impact on the subsea pipeline, three technical mitigation pipe shield protective covering methods were taken into consideration to mitigate medium risk level. The pipe shield protective cover includes the Submat Flexiform Concrete Method, U Type Pre-Cast Method and Massive Mess Pre-Cast Method as shown figures 5. for Submat Flexiform Concrete Method, figure 5. for U Type Pre-Cast Method and figure 5. for Massive Mess Pre-Cast Method. Figure 5. for Massive Mess Pre-Cast Method The total material and the installation cost can be calculated as shown in table 5.. Table 5. shows the estimated material and installation costs for the three types of mitigation process methods analyzed in this final project as follows. Table 5. Overall materials and installation cost Figures 5. for Submat Flexiform Concrete Method CONCLUSION AND SUGGESTIONS 6. Conclusion a. The potential risk to be caused by sinking vessels on the subsea pipeline for Amerada Hess at zone III is a medium risk level. The risk level is categorized as medium risk level due to the potential impact of the sinking vessels can be a major treat in rupturing the subsea pipeline and can only be accepted with a technical mitigation process applied. As such, to protect the pipeline from the medium risk level, Amerada Hess is required to shield the untrenched pipeline using the U-Type Pre-Cast method or any other pipe protective precautions that can resist the weight of the sinking vessels impact from hitting the pipeline. b. From the frequency estimations, the results of the incidental probability from the combination of the three factors where: - The velocity of the vessel at 5 knots, 7.5 knots and 0 knots - The percentages used for the vessel loose control conditions and

arriving at the CADZ are at.5%, 5% and 7.5% in accordance with Lloyds registry number - The percentage probability of the vessel sinking to be.5%, 5% and 7.5% in accordance with Lloyds registry number. c. For the Consequency Estimation, the ranking consequency of the vessels all falls at ranking of 5. Acceptation for vessels with small weights. As the weight of the vessel increases the impact energy of such vessels sinking hitting the subsea pipeline is very high and at a point of rupturing the pipeline. As such, the outcome of the vessel sinking and hitting the pipeline can result in leakages and the complete rupture of the pipeline at zone III. d. The estimated material and installation cost for the Submat Flexiform Concrete Mattress Method is $,7,69.4 (Rp,76,9,4.), U Type Pre-Cast Method at $,497,.4 (Rp 4,97,,9.48) and Massive Mess Pre-Cast Method at $4,478,97.67 (Rp44, 789,76,79.54). e. Comparing the three types of methods the most preferred type is the U Type Pre-Cast Method. 6. Suggestions Several Suggestions that can be taken into account from this final project are as follows: a. There is a need to calculate the incidental probability of individual of the different types of vessels crossing over the subsea pipeline at zone III due to the changes in the annual frequency of the vessels crossing over the pipeline in the future. b. Re-evaluate the consequency again as there might be vessels with greater weights passing through apart from the types of vessels stated in this final project. c. The re-design of a better technical mitigation process that is more reliable and cost effective if the Submat Flexiform Concrete Mattress, U Type Pre-Cast and the Massive Mess Pre- Cast Methods are considered expensive based on material and cost analysis and reliability performance of the design. d. The need to estimate the reliability and maintenance cost of the U Type Pre- Cast method on timely basis to maintain the safety of the pipeline during the long run of the supply of the gas. REFERENCES Books. David L. Goetsch (005). Occupational Health and Safety for Technologists, Engineers and Managers, Prentice Hall, 5 th Edition.. Collin W. Fuller and Luise H. Vassie (004), HEALTH AND SAFETY MANAGEMENT ; Principles and Best Practice, Prentice Hall,. Hiromitsu Kumamoto & Ernest J.Henley, Probabilistic Risk Assessment and Management for Engineers and Scientists, nd Edition, IEEE Press. Journals. C. Clausand, Pipeline Integrity Management Strategy for Aging Off Shore Pipelines, MACAW Engineering Limited, Wallsend, UK.. OSD Energy Services (004), Preliminary Risk Assessment in Accordance with AS 885 for the Trans Territory Pipeline, Level 9, Toowong Tower QLD, 4066.. Nord Stream Espoo Report (009), Nord Stream Environemntal Impact Assessment Documentation for Consulatation under the Espoo Convention, Maritime Safety. 4. S.F Biagiotti and S.F Gosse, Formalizing Pipeline Integrity with Risk Assessment Methods and Tools, International Pipeline Conference, Vol, ASME 000.

5. Frederick J, Barnard (005), An Integrated Health, Safety and Environmental Risk Assessment Model for the South African Global System Mobile Telecommunications (GSM), University of South Africa. 6. Hawkins (998): Risk Analysis Techniques, A rent Quant Research Paper