INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin

Similar documents
Installation of Fiberglass Windows

Tools required by installer: Materials required by installer:

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

All Window Installation Instruction

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

window installation Guide wood FRaMinG New Construction

Sun Windows General Information New Construction Hinged Door Installation Instructions

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

Eagle clad double-hung window installation instructions

Window with Nail fin (New construction)

Installation Recommendations for Finless Frame Doors

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Vinyl Windows and Doors Manufactured by Pella Corporation

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Flashing Materials. Rough Opening Preparation

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

WindowSeal. Installation Instructions. Prep & General Conditions

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

How To Install Windows: Nail-Fin Application

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

Integrity Polygon and Round Top Installation and Finishing Instructions

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Window Frame Installation Instructions For Nail-on and Block Frames

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

Butyl Flash. Installation Instructions. Prep & General Conditions

Curtain Wall Installation Guide

Providing 3 Layers of Protection

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

In the 30-plus years that I ve been a remodeling contractor, I ve

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)

Chapter 9. Windows and Exterior Doors

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Vinyl Windows and Doors

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

Pocket Door Installation Instructions

Picture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer) Fig.

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Chapter 9. Windows and Exterior Doors

Before installation, check your local and state requirements for this type of install.

Wood Hinged Patio Door Installation Instructions

Installation Guide for Andersen Architectural Clad Awning Windows

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

I n s t a l l a t i o n I n s t r u c t i o n s

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

INTERIOR. Checkrail. Flashing tape

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

French. Doors. Installing. In California, contractors have been

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001)

Kinro Metal, Vinyl, Flush mounted and Recessed Fin Windows (HUD) OEM INSTALLATION MANUAL

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

Installation Instructions

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For:

STACKING MULTI-SLIDE DOOR SYSTEM

Installation Instructions For Vinyl Sliding Patio Door & French Sliding Patio Door 1-Wide, 2-Wide and 4-Wide

IMPORTANT: Please read completely before you begin.

TARGA 7100 SINGLE HUNG INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

Transcription:

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin Wall systems designed to manage water or that have been upgraded to manage water are important for a trouble free installation. Site conditions, building designs, building materials and construction methods vary from project to project. Determining the proper installation is the responsibility of you, your architect or construction professional. Installation will require a minimum of two (2) or more people depending on the size/weight of the windows, size of the project and schedule. 1. INSPECTION: Customer should conduct a thorough inspection of the window products after receiving them. Windows should be inspected for proper type, operability, shipping damage, and size. All damages or freight claims must be submitted in writing within 5 business days of receipt to; service fiberglass@alpenhpp.com. Follow these steps when inspecting new window products: - Thoroughly inspect the windows, note that some products contain items that are not to be removed until after the windows are installed properly. - Lock all sashes opened during inspection prior to installation. - Check for proper size and location prior to the start of installation. 2. STORAGE AND HANDLING: Windows should be properly stored when installation will not take place immediately. The following recommendations will help you store and protect the products until installation can begin: - Windows shall be transported in an upright position with all manufacturers packaging in place. - Installers should wear clean gloves when handling new products. - Do not rack, twist, drag or pull window frames. - All windows shall be stored in the upright position as close to 90 degrees as possible and placed on their sills. - If packaging is removed, store with non-abrasive separators between frames. - Handle units with glass cups as much as possible. Use appropriate manpower when lifting large units. - Windows shall be stored out of the weather in a clean, dry, low traffic area, away from direct sun light, extreme temperatures and extreme temperature changes. Do not leave wrapped windows exposed to sunlight or heat. 3. EQUALIZATION PROCESS AND RESERVOIR REMOVAL INSTRUCTIONS: a. Once the units have arrived at the jobsite, allow them to acclimate to local conditions for a minimum of 24 hours. Larger units may take up to 72 hours. b. Once acclimated, the capillary tube requires crimping and the reservoir removed. This should be completed within 5 days of receiving the windows on the jobsite. Crimping should be performed between 12 and 3 PM or the warmest part of the day. c. Crimp (hard enough to collapse or flatten the tube) the capillary tube 1 from the edge of glass/glazing bead, again at 1/2, and again at another 1/2 flat jaws of a pair of side cutting pliers as show in the image. Alpen High Performance Products 6268 Monarch Park Place, Longmont, CO 80503 303.834.3600/800.882.4466 Fax: 303.834.3541 www.thinkalpen.com 9/2013 1 P a g e

4. d. Cut the tube 1 from the end to remove the reservoir and then dip the cut end in Glazing Sealant that adheres to steel. e. Tuck the capillary tube under the glazing bead using a putty knife and flat blade screw driver or tape to the edge of the IGU for glass only products. AAMA INSTALLATION METHOD SELECTOR A A1 B B1 Weather Barrier Applied (First) Prior to Window Sill Flashing Applied Prior to Window Installation Jamb Flashing Applied to Opening (Before) Window Window Set In Place (With Sealant on Back of Flange) Jamb Flashing Applied w/ Sealant (After) Window Head Flashing Applied After Window Installation Weather Barrier Applied (After) Window A = Flashing applied after the window B = Flashing applied before the window 1= WRB applied before window Each project is different. The most frequently used method on new construction, with weather resistant barrier and fin is the AAMA A1 Method. Other Methods are mentioned in the text that follows, but the primary description in this document is the A1 Method. 5. PREPARE WINDOW OPENING: a. Verify the rough opening is level and square. Verify the window will fit the opening. Allow ¼ (+/- 6mm) space between window frame and rough opening at the jambs for shimming and adjustment (1/2 overall in width). Be sure to consider perimeter accessories in this equation to determine window frame size. Allow for shim space at the bottom of the window (use enough shims to fully support the window and insure sill remains straight) and the remaining space at the top of the window to allow for movement of the header above the window. Shim space may be larger depending on project-specific installation requirements. Measure width and height at several points along span to ensure dimensions are uniform and no bowing or warping exists. (Shim window at the sill and jambs, not at the head.) Alpen High Performance Products 6268 Monarch Park Place, Longmont, CO 80503 303.834.3600/800.882.4466 Fax: 303.834.3541 www.alpenhpp.com 9/2013 2 P a g e

b. When the weather resistant barrier is in place: (See drawings below) 1) Score with modified I pattern or upside-down Y. 2) Then fold the WRB to the interior and tape 3) Cut building wrap at the head outside to corner of the opening in a 45 degree cut on both sides of the opening. Length of cut is about 12-3/4 diagonal measurement. Straight dimensions from the head and jambs should be 9. 4) Fold up WRB flap at head and temporarily fold and tape flap as shown. 1) 2) 3) 4) 6. SILL FLASHING & DRAINAGE: a. Cut sill flashing apron for the front of the opening using 9 selfadhering flashing. (Size = R.O. + 18.) Place a bead of sealant at the exterior front corners of the sill where building wrap and apron flashing meet. Long arrows in drawing right show location - Tool sealant before installing sill flashing or pan flashing. (If this is an A or B method without the building wrap in place, attach the top of the apron flashing, but leave the lower portion of the flashing loose so the building wrap or paper can be slid under the flexible flashing. Then both can be securely attached, but in weather board fashion.) b. Flexible Flashing with membrane - placed and cut as sill pan. Make sure to allow for back dam and create positive drain to the exterior. 6 side legs are recommended. (Metal pans can be used, but conduct cold to the interior of the building unless you insulate at the back dam.) (Refer to Installation Masters Training Manual Addendum dated August 2007 for back dam height based Alpen High Performance Products 6268 Monarch Park Place, Longmont, CO 80503 303.834.3600/800.882.4466 Fax: 303.834.3541 www.alpenhpp.com 9/2013 3 P a g e APRON

project performance requirements. The Building Science Corporation has suggestions for creating positive drain and back dams.) c. Cut and place small pieces of flexible flashing in the corners for a redundant corner seal. Be sure to make it as smooth as possible and avoid any wrinkles. 7. SHIMS: Use 1/8 thick minimum non-compressible, impervious shims. Thicker shims may be required depending on window rough opening but should not exceed 1/4. Shims should be at least 1-1/2 wide and long enough to fully support the window frame. Place shims every 6-8 along window sill and within 1 from corners. Shims can be set in sealant to hold them in place. Ensure adequate and level support of window frame is achieved. Apply a continuous bead of sealant on the edge of the opening at the jambs and the head. A discontinuous bead of sealant can be applied on the face of sill. (Sealant on the opening instead of the back of the fin keeps your hands clean.) Before skin appears on sealant, using glass cups to lift the window, center window and set window in the opening - sill first. Push the window into the sealant from the bottom to the top. a. Check window for plumb, level and square. Shim at the jambs. Fasten the perimeter with coated or stainless steel screws 6-8 o.c.. Place clear silicone on the frame corners and seal corner miters of the installation fin. Tool sealant and any squeeze-out on the fin once the window is fastened in place. Seal and tool heads of all fasteners. **Please refer to Installation Masters guidelines for additional information regarding back dam heights, side jamb heights for flashing, redundant lines of sealant, and flashing in weatherboard fashion. 8. JAMB AND HEAD FLASHING: a. Apply Jamb Flashing. (Size is R.O. height + 17 - Allowance 1/2 less than 9 at the top and bottom.) Alpen High Performance Products 6268 Monarch Park Place, Longmont, CO 80503 303.834.3600/800.882.4466 Fax: 303.834.3541 www.alpenhpp.com 9/2013 4 P a g e

b. DRIP CAP: Head drip cap flashing can be installed at this time. Separate from window assembly for redundant water protection. (Drip cap is not an option from Alpen windows. It would be provided by others.) Integrate window with existing drainage plane at head and jambs. Ensure drip cap at window head is in place and effectively sheds water beyond window frame. Water should not be drained down exterior surface of window frame or glass. Failure to provide adequate head flashing/drip cap may void warranty. c. Apply Head Flashing over fin and drip cap flashing. (Size is R.O. Width + 20, 1 wider on each side.) 9. Release tape from WRB above window. Allow it to drop over head flashing. Apply weather resistant barrier tape to hold the flap down. 10. ALTERATIONS Windows should never be load bearing after installation. Window should not be modified to accommodate air conditioners, exhaust fans, etc. END OF SECTION Recommended resource for effective water management building details per climate type: Builder s Guide Series by The Building Science Corporation (Building Science Press, 2006 & 2009) and AAMA Installation Masters Training Manual for additional detail. Alpen High Performance Products 6268 Monarch Park Place, Longmont, CO 80503 303.834.3600/800.882.4466 Fax: 303.834.3541 www.thinkalpen.com 9/2013 5 P a g e