Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A

Similar documents
Study the Compact Photon Source Radiation Using FLUKA

TABLE OF CONTENTS. References

Status of the PRad Experiment (E )

APPENDIX K UNF RADIATION GENERATING DEVICE SAFETY PROCEDURES

(a) This subchapter applies to installations using analytical x-ray equipment and establishes requirements for their use.

12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A

By: Georgia Institute of Technology

RADIATION SAFETY REQUIREMENTS FOR ANALYTICAL X-RAY EQUIPMENT

Application Note. ipix A Gamma imager to support various applications. Introduction. An easy to carry and deploy instrument

Monte Carlo Simulation of the PRad Experiment at JLab 1

Status of the PRad Experiment (E )

SPECIFICATION. Kilovoltage X-ray calibration system for protection and diagnostic level dosimetry. Prepared by

Minnesota Rules, Chapter 4732 X-ray Revision

Calculation of Remanent Dose Rate Maps in the LHC Beam Dump Caverns

Detector Checkout and Optics Commissioning

PART H RADIATION SAFETY REQUIREMENTS FOR NON-HEALING ARTS RADIATION GENERATING DEVICES (RGD)

Preliminary Plan for a Hadron Production Facility at the SLAC A-Line and End Station A

X-RAYS - NO UNAUTHORISED ENTRY

Minnesota Rules, Chapter 4732 X-ray Revision PROPOSED NON-MEDICAL ANALYTICAL X-RAY SYSTEMS, 1.0

Minnesota Rules, Chapter 4732 X-ray Revision PROPOSED NON-MEDICAL CABINET X-RAY SYSTEMS, 1.0

Hall D Report. E.Chudakov 1. PAC43, July Hall D Group Leader. E.Chudakov PAC43, July 2015 Hall D Report 1

1-1. GENERAL 1-2. DISCOVERY OF X-RAYS

CLAS12 First Experiment Workshop Report

HPS Upgrade Proposal

Physics Laboratory Scattering of Photons from Electrons: Compton Scattering

Keene State College Center for Environmental BioGeoChemistry Radiation Protection Program Revised January

MuCool Test Area Experimental Program Summary

CEBAF Overview June 4, 2010

Minnesota Rules, Chapter 4732 X-ray Revision

Minnesota Rules, Chapter 4732 X-ray Revision

VACUUM INTERRUPTER APPLICATION NOTES Filename: VIAN X-Rays and Vacuum Interrupters Revision: 0 PAGE 1

Minnesota Rules, Chapter 4732 X-ray Revision

Minnesota Rules, Chapter 4732 X-ray Revision

PREX- 2 Issues. April 11, Kent Paschke

X-Ray Transport, Diagnostic, & Commissioning Plans. LCLS Diagnostics and Commissioning Workshop

Cartogam Real-Time Portable Gamma-Ray Imaging System

The FERMI Elettra: radiation protection and safety issues

CMS Beam Condition Monitoring Wim de Boer, Hannes Bol, Alexander Furgeri, Steffen Muller

X-rays. X-rays are produced when electrons are accelerated and collide with a target. X-rays are sometimes characterized by the generating voltage

The SIRAD irradiation facility at the INFN - Legnaro National Laboratory

A Facility for Accelerator Physics and Test Beam Experiments

Advanced Laser Personnel Safety System at Jefferson Lab

ELECTRONIC CONTROL CONCEPTS 160 Partition Street Saugerties, NY or local phone

X-band Magnetron. Cooling (note 5) Water Output coupling (note 6) UG51/U Magnet (note 7) Integral, Permanent

MOLLER/PREX Detector Development

CyberKnife Iris Beam QA using Fluence Divergence

RANDY W. ALKIRE, GEROLD ROSENBAUM AND GWYNDAF EVANS

Product Range Electronic Units

Hall C Polarimetry at 12 GeV Dave Gaskell Hall C Users Meeting January 14, 2012

Physics Requirements for the CXI 0.1 micron Sample Chamber

Nuclear Associates

X-ray Transport Optics and Diagnostics Commissioning Report

X band Magnetron. Water: Anode cavity Forced-air: Input ceramics and terminals Output coupling (note 6) UG51/U Magnet (note 7) Integral, Permanent

MG7095 Tunable S-Band Magnetron

GEM Detector Assembly, Implementation, Data Analysis

MERcury Intense Target (MERIT) Experiment or ntof-11

SUBCHAPTER 14. THERAPEUTIC INSTALLATIONS

MC SIMULATION OF SCATTER INTENSITIES IN A CONE-BEAM CT SYSTEM EMPLOYING A 450 kv X-RAY TUBE

Series 48 Water Cooled Laser & UC-2000 Quick Start Guide

Check the LCLS Project website to verify 2 of 7 that this is the correct version prior to use.

Technical Specifications SECTION C

Standard Practice for Qualification of Radioscopic Systems 1

Upgrade of the ultra-small-angle scattering (USAXS) beamline BW4

Ch. 223 VETERINARY MEDICINE CHAPTER 223. VETERINARY MEDICINE GENERAL PROVISIONS X-RAYS RADIOACTIVE MATERIAL. Authority

REQUIREMENTS FOR USE OF NONMEDICAL X;RAY GENERATORS AT SLAC*

Status of the LHCb Experiment

Electronic Readout System for Belle II Imaging Time of Propagation Detector

Unpolarized Cluster, Jet and Pellet Targets

MG6090 Tunable S-Band Magnetron

Test results on 60 MeV proton beam at CYCLONE - UCL Performed on CAEN HV prototype module A June 2001 Introduction

arxiv: v1 [physics.ins-det] 18 Apr 2013

F- 9 72) PROTECTION IN THE ~ L TEST AT SLAC

Science Teacher Workshop Meter Exercises. Hands on demonstration with Geiger Counters and experiments for the classroom.

Alignment of the 12 GeV CEBAF Accelerator

Beam Loss Monitoring (BLM) System for ESS

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem

Engineering technology

VISUAL INSPECTION OF A COPPER COLLIMATOR IRRADIATED BY 590 MeV PROTONS AT PSI

STUDIO TO TRANSMITTER LINKING SYSTEM

Packaging of Cryogenic Components

ISO INTERNATIONAL STANDARD. Remote-handling devices for radioactive materials Part 2: Mechanical master-slave manipulators

LUSI Pulse Picker System

14 Radiological Considerations

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

Improvement in High-Frequency Properties of Beam Halo Monitor using Diamond Detectors for SPring-8 XFEL

The Muon Detector Update

1.1 The Muon Veto Detector (MUV)

Alternating-Current High-Voltage Power Vacuum Interrupters Safety Requirements for X-Radiation Limits

Trigger Rate Dependence and Gas Mixture of MRPC for the LEPS2 Experiment at SPring-8

Abridged Data. General Data. MG7095 Tunable S-Band Magnetron for Switched Energy Applications. Cooling. Electrical. Accessories.

3 General layout of the XFEL Facility

Strategy for the engineering integration of the ESS accelerator

Overview over CERN SPS test beams

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

LASER RADIATION REQUIREMENTS

MG5193 Tunable S-Band Magnetron

Radiation Monitoring with CVD Diamonds and PIN Diodes at BaBar

Spectrometer cavern background

Transcription:

Radiological Safety Analysis Document for the CLAS12 Engineering and the first physics run of Run Group A This Radiological Safety Analysis Document (RSAD) will identify the general conditions associated with the engineering run of the CLAS12 detector and the first physics run of Run Group A (RG-A) in Hall B, and the controls associated with regard to production, movement, or import of radioactive materials. 1 1 Description The engineering run of the CLAS12 detector and the first experimental run of RG-A will take place in 2018 in experimental Hall B. The CLAS12 is amultipurposedetectorsystembasedonatoroidal(forwarddetector)and asolenoid(centraldetector)superconductingmagnets. Thedetectorsystem includes Cherenkov Counters, Drift Chambers, Scintillator Counters, Siliconstrip detectors, Micro-mega gas detectors, and Calorimeters. The engineering run will start in December and will continue till end of January. The first RG-A run will follow the engineering run. The run conditions and targets are the same for these run segmens. In this run period beams of various energies, up to 11 GeV (1 to 5 pass), and beam currents up to 200 na will be used. As a target CLAS12 cryotarget located inside the central detector in the center of the 5 T solenoid magnet will be used with and without LH 2 in it. The target cell is a 20 mm diameter, 5 cm long Kapton tube installed inside the beam vacuum, in a foam scattering chamber. The vacuum will be disconnected between the upstream 1 Contact person: Stepan Stepanyan 1

and downstream beamlines with 40 cm of air between the exit window of the target scattering chamber and the entrance window of the downstream beamline. Both windows are 50 µm thick aluminum. The luminosity during the run will be 10 35 cm 2 s 1, the nominal design luminosity for CLAS12 2. During running with beam currents above 15 na at 11 GeV ( 160 W), the Hall B beam stopper (a 30 cm long, water cooled-copper absorber) will be positioned before the Faraday Cup to prevent overheating. For the beam tune and Möller runs, the beam will be directed into a newly constructed beam dump in the Hall B Tagger dipole yoke. On top of the Tagger yoke, additional lead shielding will be added to limit radiation leaking through to the CLAS12 detectors and electronics. The additional shielding and the nickel collimator have been thoroughly simulated using a FLUKA model of the beamline and the Tagger dipole magnet. Downstream of the collimator box, additional shielding is installed from borated polyethylene blocks to minimize neutron background. 2 Summary and Conclusions The experiment is not expected to produce significant levels of radiation at the site boundary. However, it will be monitored by the Radiation Control Department to ensure that the site boundary goal is not exceeded. The main consideration is the manipulation and/or handling of target(s) or beamline hardware. As specified in Sections 4 (4.2) and 7, the manipulation and/or handling of target(s) or beamline hardware (potential radioactive material), the transfer of radioactive material, or modifications to the beamline after the target assembly must be reviewed and approved by the Radiation Control Department. Adherence to this RSAD is vital. 3 Calculations of Radiation Deposited in the Experimental Hall (the Experiment Operations Envelope) The radiation budget for a given experiment is the amount of radiation that is expected at the site boundary as a result of a given set of experiments. 2 Short tests with up 2 10 35 cm 2 s 1 is expected during the engineering run. 2

This budget may be specified in terms of mrem at the site boundary or as a percentage of the Je erson Lab design goal for dose to the public, which is 10 mrem per year. The Je erson Lab design goal is 10% of the DOE annual dose limit to the public, and cannot be exceeded without prior written consent from the Radiation Control Department Head, the Director of Je erson Lab, and the Department of Energy. Calculations of the contribution to Je erson Lab s annual radiation budget that would result from running under a broad variety of conditions typical of Hall B operations indicate that the contribution from this experiment will be negligible. With this expectation, we have not carried out calculations for the specific running conditions of this experimental group. This expectation will be verified during the experiment by using the active monitors at the Je erson Lab site boundary to keep up with the dose for the individual setups from Hall B and the other Halls. If it appears that the radiation budget will be exceeded, the Radiation Control Department will require a meeting with the experimenters and the Head of the Physics Division to determine if the experimental conditions are accurate, and to assess what actions may reduce the dose rates at the site boundary. If the site boundary dose approaches or exceeds 10 mrem during any calendar year, the experimental program will stop until a resolution can be reached. 4 Radiation Hazards The following controls shall be used to prevent the unnecessary exposure of personnel and to comply with federal, state, and local regulations, as well as with Je erson Lab and the experimenter s home institution policies. 4.1 From Beam in the Hall When the Hall status is Beam Permit, there are potentially lethal conditions present. Therefore, prior to going to Beam Permit, several actions will occur. Announcements will be made over the intercom system notifying personnel of a change in status from Restricted Access (free access to the Hall is allowed, with appropriate dosimetry and training) to Sweep Mode. All magnetic locks on exit doors will be activated. Persons trained to sweep the area will enter by keyed access (Controlled Access) and search in all areas of the Hall to check for personnel. 3

After the sweep, another announcement will be made, indicating a change to Power Permit, followed by Beam Permit. The lights will dim and Run-Safe boxes will indicate OPERATIONAL and UNSAFE. IF YOU ARE IN THE HALL AT ANY TIME THAT THE RUN-SAFE BOXES INDICATE UNSAFE, IMMEDIATELY HIT THE BUTTON ON THE BOX. Controlled Area Radiation Monitors (CARMs) are located in strategic areas around the Hall and the Counting House to ensure that unsafe conditions do not occur in occupiable areas. 4.2 From Activation of Target and Beamline Components All radioactive materials brought to Je erson Lab shall be identified to the Radiation Control Department. These materials include, but are not limited to, radioactive check sources (of any activity, exempt or non-exempt), previously used targets or radioactive beamline components, or previously used shielding or collimators. The Radiation Control Department inventories and tracks all radioactive materials onsite. The Radiation Control Department will survey all experimental setups before experiments begin as a baseline for future measurements. The Radiation Control Department will coordinate all movement of used targets, collimators, and shields. The Radiation Control Department will assess the radiation exposure conditions and will implement controls as necessary based on the radiological hazards. There shall be no local movement of activated target configurations without direct supervision by the Radiation Control Department. Remote movement of target configurations shall be permitted, providing the method of movement has been reviewed and approved by the Radiation Control Department. No work is to be performed on beamline components, which could result in dispersal of radioactive material (e.g., drilling, cutting, welding, etc.). Such activities must be conducted only with specific permission and control of the Radiation Control Department. 4

5 Incremental Shielding or Other Measures to be Taken to Reduce Radiation Hazards None. 6 Operations Procedures All experimenters must comply with experiment-specific administrative controls. These controls begin with the measures outlined in the experiment s Conduct of Operations Document, and also include, but are not limited to, Radiation Work Permits, Temporary Operational Safety Procedures, and Operational Safety Procedures, or any verbal instructions from the Radiation Control Department. A general access RWP is in place that governs access to Hall B and the accelerator enclosure, which may be found in the Machine Control Center (MCC); it must be read and signed by all participants in the experiment. Any individual with a need to handle radioactive material at Je erson Lab shall first complete Radiation Worker (RW I) training. There shall be adequate communication between the experimenter(s) and the Accelerator Crew Chief and/or Program Deputy to ensure that all power restrictions on the target are well known. Exceeding these power restrictions may lead to excessive and unnecessary contamination, activation, and personnel exposure. No scattering chamber or downstream component may be altered outside the scope of this RSAD without formal Radiation Control Department review. Alteration of these components (including the exit beamline itself) may result in increased radiation production from the Hall and a resultant increase in the site boundary dose. 7 Decommissioning and Decontamination of Radioactive Components Experimenters shall retain all targets and experimental equipment brought to Je erson Lab for temporary use during the experiment. After su cient decay of the radioactive target configurations, they shall be delivered to the experimenter s home institution for final disposition. All transportation shall be 5

Appendix A Radiation Damage The experiment is not expected to produce significant levels of radiation damage to the Hall B electronics located on the Forward Carriage or on the Space Frame. The beam energies and the integrated luminosity of the experiment are in the same range as for the CLAS nuclear target experiments. Furthermore, all sensitive electrons that are mounted close to the beamline are upstream of the target where not much radiation is expected. Most of produced electromagnetic radiation (Möller electrons) will be guided by 5Tsolenoidfieldintotungstenshieldpipe. Partofthatradiationwill be absorbed by shield, part will be guided to the beam dump. Some of electronics modules mounted on Forward Tagger will be beyond the tungsten shield and will not see much radiation. 7