Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

Similar documents
The Hamlin Assembly Instruction By Laser Dollhouse Designs

The Lansdowne One Car Garage Assembly Instruction by Laser Dollhouse Designs

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs

Little Briana Cottage Dollhouse assembly instructions

Kristiana Tudor Assembly Instructions By Laser Dollhouse Designs

Hegeler Carus Mansion Assembly Instructions By Laser Dollhouse Designs

Wayside Cottage Assembly Instructions By Laser Dollhouse Designs

Seascape Bungalow Assembly instructions. Laser Dollhouse Designs

The Rowen Victorian Assembly Instructions By Laser Dollhouse Designs

The Castle House Assembly Instructions By Laser Dollhouse Designs

Corona Concepts presents The Laurel All Wood Dollhouse. Instructions and Assembly Guides

Corona Concepts presents The Lily All Wood Dollhouse. Instructions and Assembly Guide

Assembly Instructions for Summit Motel Kits # SMFS and SMBD


(56501) Corona Concepts presents The Willow All Wood Dollhouse. Instructions and Assembly Guide RTD AA

-1- Coach Instructions.

DARC MANSION ASSEMBLY INSTRUCTIONS page 1.

Chapter 17 - Porch Trim

CVS Pharmacy kit in HO scale

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Hotel Belvedere Instructions for Assembly of the HO scale kit. v1.1

Corona Concepts presents The Buttercup All Wood Dollhouse. Instructions and Assembly Guides

Instructions and Assembly Guide

Stair Parts Installation. Tricks

Hardee s Restaurant kit in HO scale

Nanton Grain Mill Assembly

Ben Franklin 5&10 Store

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont

Newport. the. Instructions for Real Good Toys

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Assembly Instructions

How to assemble the Reims Gueux Pit Centre Module #005

The Park Hotel Instructions for Assembly of N Scale Kit

The Rubley Building Instructions for Assembly of the N scale kit. v1.1

Gambrel Barn with Overhang Manual

10 Octagon Cedar Gazebo Assembly Instructions

Donaldson s Department Store

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

DAVENPORT DEPARTMENT STORE PF5214

Taco Bell Restaurant kit in HO scale

Instructions for Real Good Toys 32 Miniatures Showcase. Kit #MS /10

Newport. the. Instructions for Real Good Toys

The Park Hotel Instructions for Assembly

Gambrel Barn Construction Manual 8x8 through 16x24 Units

CORNER PORCH HOUSE PF5196

HR175 Sash Replacement Kit Installation Instructions

Eagle clad double-hung window installation instructions

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

BUILDING A STORM DOOR

TOYOTA MOTOR EUROPE CA Products Division Tel : Fax :

The Fyfe Building Instructions for Assembly of the N scale kit.

129 KITCHEN BASE CABINET 480

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

How to assemble the Reims Gueux Pit End Modules #005

Tools and Tips: ( 1 )

A Day House. A View of One Way to Finish the Exterior of The Day House. Read these instructions all the way through before beginning this project.

San Felipe: Step by Step Pack 3

Tools and Tips: ( 1 )

Octagon Vinyl Gazebo Assembly Instructions

Fidelity & Guaranty Building

SE5a Wing Panels rev 1.0

Best Barns USA Assembly Book

CABINETRY Assembly Instructions

the East Side Townhouse in 1 / 2 Scale

LASER-ART. The DuBois House. LASER-ARTSTRUCTURES by BRANCHLINE TRAINS BRANCHLINE TRAINS STRUCTURES

SAN FELIPE: Step by Step Pack 2

PROJECT PLANS WOODEN GIFT BOX

Best Barns USA Assembly Book

Sliding Glass Door Assembly and Installation Guide

Grand Garden Chalet 6X3 Assembly Manual

San Felipe: Step by Step Pack 6

Bates 1/8 scale B-26. Parts List. Instructions

Best Barns USA Assembly Book

Best Barns USA Assembly Book

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

Rural Shamrock Gas Station & Store kit in HO scale

Best Barns USA Assembly Book

The Bleak Estate Assembly Instructions - Page 1.

T he Double-Hung Replacement System replaces the sash and balance system of an older double-hung window. The

Assembly Instructions

#P571 - Victorian Queen Fretwork Clock inspired by 18th century Victorian elegance. 17 H x 21 W. Requires a 3 1/2 clock insert.

Chapter 12 - Windows and Doors

The Hearse Carriage Assembly Instructions Page 1.

Best Barns USA Assembly Book

FLOW HIVE ASSEMBLY GUIDE. If we look after the bees they will look after us, and the honey really is an amazing bonus. Flow Hive Hybrid 3 Frame

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Best Barns USA Assembly Book

Best Barns USA Assembly Book

Lowe's backdrop building kit in HO scale

#P570 - Leavenworth Requires a pendulum movement kit (#A309 - #A312) 24 H x 14 W

Glue the ends onto the rafters following the instructions on the container of glue supplied with the kit.

Tools and Tips: ( 1 )

Engineering Directive

Best Barns USA Assembly Book

Special Edition Vermont Farmhouse, Jr.

Build the Spitfire: Step-By-step. Pack 3 Stages 21-30

Drawings of all parts have been included for ease of part identification.

Grand Garden Chalet 6X3 Assembly Manual

Best Barns USA Assembly Book

N Scale Concrete Coal Dock Instruction Manual

Transcription:

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also gives you a chance to visualize how you want to approach the build. Also read each step and adhere to items that should not be glued till a later time.. Materials for build; 1. Wood glue, you may use Titebond, Elmers, tacky or any good wood glue. Tacky wood glue dries clear and is preferred. Super Glue for small items. 2. Masking tape to hold house in place during assembly and gluing. 3. Utility knife if needed for trimming. 4. 220 grit sandpaper. 5. Wood Filler 6. Size 1/2x19 pin nails (optional) if nailing house together with glue. 7. Needle nose and hammer ( again optional) if nailing house. Preferred that the house is nailed for strength. 8. 3/8 corner molding (not included in kit) optional.

House Assembly Step 1. Locate base marked S1 thru S8, figure 1. Next locate the rails for the sub-frame marked S1 thru S8, figure 2. Step 2. Install the sub-frame rail onto main base panel as seen in figure 3. Next install first floor base as seen in figure 4. Figure 1 Figure 2 Figure 3 Figure 4

House Assembly Step 3. Locate the two porch step risers, and two treads, figure 5. Install the two risers onto the porch as seen in figure 6. Now install the two treads as seen in figure 7. Step 4. Locate interior walls 1D and 1E in figure 8 and the 2 nd floor seen in figure 9. Figure 5 Figure 6 Figure 7 Figure 8 Figure 9

House Assembly Step 5. Install the walls by sliding onto the 2 nd floor, figure 10. Next install wall and floor assembly onto main floor as seen in figure 11. Step 6. Next install side main outer walls 1B and 1C, make sure all walls are flush and aligned, figure 12. Next install front main exterior wall 1A as seen in figure 13. Inspect all corners, top, and bottom and verify that the walls align and are flush to each other. If needed tap and align with small hammer. Figure 10 Figure 11 Figure 12 Figure 13

House Assembly Step 7. Take a window and the glass (figure 14) and insert into the opening to verify it fits as you may have painted the interior. If not fitted flush then sand the sides with the protective cover on till it fits. Next remove the plastic cover from the glass. (make sure your hands are clean). Apply a very thin coat of glue to inside edge of pane, now install glass into the pane and gently press into place, take care not to press to hard and break the pane. Check that window opens over upper frame, if so let dry, fig. 15. Install windows into house, figure 16. Locate the interior frame, figure 17. Install interior frame into the interior of house onto window back match sill to slots on back of window. Figure 14 Figure 15 Figure 16 Figure 17

House Assembly Step 8. Install interior doors and interior frames, figure 18. Step 9. Locate main entry door and remove foot rail, remove doors, remove panel that holds glass, and paint all parts, figure 19. Next remove protective cover on glass and install into door, install frame, and assemble door. Place door into house opening as seen in figure 20. Figure 18 Figure 19 Figure 20

House Assembly Step 10. Install porch roof panel base, figure 21. Next install the three roof panel supports, figure 22. Install roof panel onto supports, figure 23. Step 11. Install the 4 columns onto porch, figure 24. Figure 21 Figure 22 Figure 23 Figure 24

Staircase right hand rail Assembly Step 1. Using the top large tread place on the left side opposite of where you will install the handrail, fig 1. Hold flush to the edge of staircase and glue each tread to the right side of the staircase, figure 2, complete this for all 12 treads, figure 3. Figure 1 Figure 2 Figure 3

Step 2. Install top tread making sure it is aligned to the rear of staircase, see figure 4. Step 3. Install the 13 balusters into the hole of each tread and install one newel post to top landing tread, figure 5. Step 4. Install handrail onto the balusters and align even to front of newel post, figure 6. Figure 4 Figure 5 Figure 6

Step 5. Press into the handrail each top of baluster to secure, start at the top and work your way down, figure 7. Next install bottom newel post, figure 8. staircase is completed. Figure 7 Figure 8

House Assembly Step 12. Install staircase into first floor, figure 25. Step 13. Install 3 rd floor, figure 26. Next install dental trim around the lower part of roof flush to house wall, figure 27. Complete this on the sides as well, figure 28. Figure 25 Figure 26 Figure 27 Figure 28

House Assembly Step 14. Slide staircase thru opening in 3 rd floor and install, figure 29. Step 15. Install two center wall on the 3 rd floor, figure 30. Next install exterior roof panels as seen in figure 31. Install top roof panel, figure 32. Figure 29 Figure 30 Figure 31 Figure 32

House Assembly Step 16. Assemble two L shaped landing rails. One should go left and other to the right, figure 33. Step 17. Install the landing rails into house, figure 34. Next install 3/8 corner molding. (optional) not included in kit, figure 35. Figure 33 Figure 34 Figure 35

Shingles Step 18. Start shingles by doing the porch roof first, do not throw away strips which are cut off as we will use these later. Apply first row even to the lower panel edge upside down as seen in figure 36. Next cut excess of using a utility knife, should have first row as seen in figure 37. Step 19. Install next row using the applied upside down row as your line to follow, install row above even to the bottom of the separated shingle lines, figure 38. Figure 36 Figure 37 Figure 38

Shingles Step 20. Apply next row centering the square-butt to the shingle divider below it, figure 39. Continue the process until the porch roof is covered, figure 40. Step 21. Using the cutoff pieces from the roof, turn trim edges and turn upside down and complete the starter row for the main front roof panel, figure 41. Figure 39 Figure 40 Figure 41

Shingles Step 22. Take a full strip and complete the first 2 rows as done on the roof in alignment, figure 42. Complete the main roof panel as seen in figure 43. Step 23. Complete the right and left side panels making sure that you follow the same line as completed in the front. You should have a level shingle line that runs from on side to the other. Also start the first 8 rows using full strips and then utilize the cutoffs from the front panel to complete sides, figure 44. Figure 42 Figure 43 Figure 44

Shingles Step 24. With the left over shingle strips take a ruler or straight board and cut the shingle butts off from the connector strip, figure 45. With one of the cutoff shingle butts, place onto upper strip and cut more the same size, figure 46. Step 25. Fold the shingle butts in half long side, figure 47. Apply starting from the bottom each one maintaining the shingle line as seen in figure 48. House roof and assembly complete, figure 49. Figure 45 Figure 46 Figure 47 Figure 48 Figure 49

Laser Dollhouse Designs www.laserdollhouses.com Email: laserdollhouses@aol.com