RUN-IN SHED INSTRUCTIONS

Similar documents
Premium Single Dutch Doors Assembly & Installation Instructions

ASSEMBLY INSTRUCTIONS 10 X14 HIGGINS HARDTOP GAZEBO ITEM# L-GZ212PST-4

Grand Garden Chalet 6X3 Assembly Manual - Costco

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

**MOUNTING YOUR MONITOR

Modular Shelter Breezeway Assembly Instructions

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

OUTDOOR GAZEBO ITM./ART MODEL#L-GZ682PCO-I ASSEMBLY INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

Sonoma Hardtop Gazebo 10 X 12. Owner s Manual

x16 GAZEBO ASSEMBLY INSTRUCTIONS

Dura-Lock Roof System

S H E D A S S E M B L Y I N S T R U C T I O N S

S H E D A S S E M B L Y I N S T R U C T I O N S

x12 GAZEBO ASSEMBLY INSTRUCTIONS

Horizontal Cable Systems

Leveling Foot RB210. Leg Extender RLT66

FLAT PANEL CART WITH OR WITHOUT A PULL OUT SHELF

x16 GAZEBO ASSEMBLY INSTRUCTIONS

Bulkhead Model Number and

x12 GAZEBO ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

Gardman Lean-to Greenhouse Assembly Instructions

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Continuous Handrail Kit Installation Instructions

DASHLEY COLLECTION GAZEBO

Shop Style Miter Saw Stand Kit

Parts Included: Tools Required: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions

Assembly Instructions

Greenhouse Assembly Instructions

Essex Gazebo. Assembly Instructions. Model No

English/French 06/04

10x10 Trellis Pergola

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

Folding Wood Adirondack Chair. Assembly Instructions. Item# S-DN096-C1

10 x 10 Flat Top Two Tone Pergola

Installation Instructions

Calf-Tel Pen System Assembly Instructions

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

PakYak Plans. Plywood Cuts. Aluminum Cuts. Version 4.0. Back to Main Page

MITCHELL WREATH RINGS NO-HAMMER ASSEMBLY INSTRUCTIONS

Model No. EP84-A, EP84AR-A, P84L

ATLANTIS RAIL Contact Information

USE AND CARE GUIDE BRAMFORD GAZEBO

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

PORCH-LOC INSTALLATION INSTRUCTIONS

For additional assistance call

Sentinel Electronic Safe Installation Guide

10x10 Trellis Pergola

Bullet Proof Anti-Stab Instructions

X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

Assembly Instructions. Item# L-GZ704PST

CountryAccents Pergola Assembly Instructions

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

Melamine Plastic Laminate. Toilet Partition Installation Manual

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Locker Pedestal Installation Instructions

Franklin Mills Stackable Movable Lateral Instructions

CTTR Tire Rack Required tools

Absco Premier Garden Shed Assembly Instructions Model: J30302G

Assembly Instructions GARDENA GAZEBO

ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

INSTALLATION INSTRUCTIONS

Assembly Instructions BBQ400

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

Absco Premier Garden Shed Assembly Instructions Model: J30302G

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

RBP-1215B-RX DODGE RAM QUAD CAB RX3

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Grand Garden Chalet 6X3 Assembly Manual

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

MAKO TM CASH DISPENSER

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

SwingSafe Swing-Away Mailbox Support Diagram

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Medium HoneyBadger Chase Rack Installation Instructions

The Queen Quilter Professional Quilters Kit Frame

EMB Manufacturing Inc Boomer Line St. Clements, On N0B 2M0 Canada Ph: (519) Fax: (519) P200

Installation Instructions

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Shed Assembly Instructions

Rear Mount Installation Instructions

12 X 15 SOLARIUM ASSEMBLY INSTRUCTIONS

Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36

Model 5400H / 7000H Illustrated Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

May 14, Installation Manual

Installation Instructions

PRODUCT: TJ Corner Guards READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

MONOPRICE. Above Fireplace Pull-Down Full-Motion TV Wall Mount. User's Manual P/N 27773

Oceanside Outdoor Vinyl Shower Kit (3 x 3 Enclosure)

Assembly Instructions. Important!

Assembly Instructions

Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions

Assembly Instructions. Item#: L-GZ472PST-C-A

Transcription:

RUN-IN SHED INSTRUCTIONS 14321 5th Line Nassagaweya, Rockwood, ON, N0B 2K0 Phone 519-856-9959 ~ Fax 519-856-4141 Toll Free 1-800-461-3362 ~ Email sales@systemhorse.com Website www.systemfence.com

RUN-IN SHED INSTRUCTIONS General Notes; -Read the entire instructions before you begin. -Wear appropriate safety gear when using saws, and drills. This may include, but is not limited to, safety glasses, hearing protection and work gloves. ** Roofing Steel and Channels have sharp edges and can cut your skin** -Where ever possible mount the bolts from the outside, with the nuts toward the inside of the building, as it allows for easier capping of the Trim and exterior Roofing Steel. - Get help moving parts and building the shed, as some pieces are heavy and awkward to handle. - Face the opening of the Building to the South-West if possible. Always install earth anchors never leave shed without earth anchors. WHEN MOVING SHED ALWAYS PULL FROM THE ENDS YOU SHOULD BRACE THE INSIDE CORNERS SO THAT SHED PULLS STRAIGHT System Fencing Limited 1 of 29 Run-In Shed Instructions

What You Need Tools - Circular Saw - Blade for above to cut 2 x 6 lumber - Blade for above to cut Roofing Steel - Electric Hand Drill - ½ Drill bit for above - 5/16 Hex Screw Driver Bit for above - ¼ Hex Screw Driver Bit for above - Philips Screw Driver Bit for above - 9/16 wrench - 9/16 socket w/ 3/8 drive ratchet Wood - 36x 2 x 6 x 10 What you need to Make System Fencing Limited 2 of 29 Run-In Shed Instructions

Wooden Shim Blocks System Fencing Limited 3 of 29 Run-In Shed Instructions

Fastener List (Included in Kit) Fasteners will be called out by a 2-Letter code on the bag and in the instructions. See below. Use a 3/8 nut, and lock-washer and 2 flat washers in each instance a bolt is called out (AA, BB, CC, & DD). Item EE is used to mount channels to posts and will generally be hidden when the building is complete. Item FF is used to mount hardware to the wooden boards. Items GG and HH are both used for fastening the external roofing steel, the difference being that GG is used where the screw attaches to the boards and HH is used where the screw attaches to steel posts or channels. System Fencing Limited 4 of 29 Run-In Shed Instructions

STEP 1 Locate and connect 1x RS-W-160-A (Female Base Runner) to 1x RS-W-165-A (Male Base Runner) by sliding the smaller pipe section of RS-W-165-A into the larger pipe section of RS-W-160-A until the bolts holes line up. **Note; In some kits these may arrive joined as one piece. Locate 2x RS-W-110-A (Front Outer Posts) and 1x RS- W-120-A (Front Center Post), and place as shown. Join with CC in 6 places as shown. This is the Front Assembly. STEP 2 System Fencing Limited 5 of 29 Run-In Shed Instructions

Locate and connect the remaining RS-W-160-A (Female Base Runner) to the remaining RS-W-165-A (Male Base Runner) as explained previously in Step 1 by sliding the smaller pipe section of RS-W-165-A into the larger pipe section of RS-W-160-A until the bolts holes line up. **Note; In some kits these may arrive joined as one piece. Locate 2x RS-W-130-A (Back Outer Posts) and 1x RS-W-140-A (Back Center Post), and place as shown. Join with CC in 6 places as shown. This is the Back Assembly. STEP 3 System Fencing Limited 6 of 29 Run-In Shed Instructions

Locate 2x RS-W-159-A (Lower Connector Beam) and 2x RS-F-158-A (4 in. Side Channel) and connect to the Front Assembly previously completed in Step 1. Join with BB in 4 places as shown. Watch the orientation of the top plate of the Front Center Post (RS-W-120-A). If not as shown, correct by removing the Front Center Post (RS-W- 120-A), turning it over and re-bolting. System Fencing Limited 7 of 29 Run-In Shed Instructions

STEP 4 **Note: make sure to use 2 people for this step. Now using the Lower Connector Beams (RS-W-159-A) tilt the Front Assembly previously completed in Step 3 up. The Lower Connector Beams (RS-W-159-A) should now be lying on the ground. Locate the remaining 2x RS-F-158-A (4 in. Side Channels) and position as shown. Join with BB in 4 places as shown. Watch the orientation of the top plate of the Back Center Post (RS-W-140-A). If not as shown, correct by removing the Back Center Post (RS-W-140-A), turning it over and re-bolting. This is the Frame Assembly. STEP 5 System Fencing Limited 8 of 29 Run-In Shed Instructions

Locate 4x RS-W-152-A (Mid Connector Beam) and connect to the Frame Assembly previously completed in Step 4. Join with BB in 14 places as shown. System Fencing Limited 9 of 29 Run-In Shed Instructions

STEP 6 Locate 2x RS-F-101-A (Left Side Roof Channel) and 2x RS-F-102-A (Right Side Roof Channel) and connect to the Frame Assembly previously completed in Step 5. Join the center Channels to the top of the Front Center and Back Center Posts with AA in 8 places as shown. Locate the 4x Wooden Shim Blocks that you made earlier. Join the outside Channels to the outside of the Front Outer and Back Outer Posts with Wooden Shim Blocks and DD in 8 places as shown. The bolts pass thru the slots in the outside Channels and then the holes in the Wooden Shim Blocks before connecting to the Posts. System Fencing Limited 10 of 29 Run-In Shed Instructions

STEP 7 Locate 2x RS-F-103-A (Cross Roof Channel) and connect to the Channels on the Frame Assembly previously completed in Step 6. Join the ends of the Cross Roof Channels (RS-F-103-A) to the insides of the Side Roof Channels with AA in 4 places as shown. Note; keep the open end of the Cross Roof Channel (RS-F-103-A) to the inside. Repeat for other side of shed. System Fencing Limited 11 of 29 Run-In Shed Instructions

STEP 8 Then locate 10x RS-F-103-A (Cross Roof Channel) and connect to the Channels on the Frame Assembly as indicated by the numbers 1 10 shown below. Join the ends of the Cross Roof Channels (RS-F-103-A) to the insides of the Side Roof Channels with AA in 4 places as shown. Note; keep the open end of the Cross Roof Channels 1 10 (RS-F-103-A) to the back. System Fencing Limited 12 of 29 Run-In Shed Instructions

STEP 9 Tighten all bolts with wrench and ratchet and the Frame Assembly should look as shown below. System Fencing Limited 13 of 29 Run-In Shed Instructions

STEP 10 Locate 4x RS-F-151-A (Back Channel) and 4x RS-F-157-A (Side Channel). Using an Electric Drill and EE (Self-Tapping Hex Head Screw) fasten channels to the posts as shown below. System Fencing Limited 14 of 29 Run-In Shed Instructions

STEP 11 Locate the 2x Back Bottom Boards and the 2x Side Bottom Boards that you have already cut and slide them into the Back and Side Channels as shown. System Fencing Limited 15 of 29 Run-In Shed Instructions

STEP 12 Continue sliding the previously cut Wall Boards into the channels; Finishing with the Back Top Boards and Side Top Boards as shown. System Fencing Limited 16 of 29 Run-In Shed Instructions

STEP 13 Using the Electric Drill with the Philips Screw Driver Bit and FF screws fasten the channels to the Wall Boards as shown below. System Fencing Limited 17 of 29 Run-In Shed Instructions

STEP 14 Locate 4x RS-F-191-A (96 Top Channels) and the 4x 22 Top Channels that you previously cut and mount them as shown below. Using the Electric drill and the Philips Screw Bit fasten the channel to the Wall Boards using FF. System Fencing Limited 18 of 29 Run-In Shed Instructions

STEP 15 Locate 4x RS-F-192-A (Mid Wall Supports) and mount them as shown below. Using the Electric drill and the Philips Screw Bit fasten the Wall Supports to the Wall Boards using FF This completes the Run-In Shed Frame. System Fencing Limited 19 of 29 Run-In Shed Instructions

Installing the Trim Locate 2x RS-F-200-A (Front Corner Trim) and 2x RS-F-201-A (Back Corner Trim) and mount them as shown below using the Electric drill and HH (Self-Tapping Screws). System Fencing Limited 20 of 29 Run-In Shed Instructions

Installing the Exterior Steel Back Wall Cut 1 sheet of the 84-1/2 long sheet to the width as shown using the Circular saw and the blade for roofing steel. Use this sheet to start along the back wall by inserting the cut edge into the back trim. Side Wall See the following drawings below for dimensions of the side wall steel. **Note: Cut the largest sheets first and leave the smallest until the end. One sheet is used to cut the smallest piece for both the Left Side and the Right Side. Left Side Wall Right Side Wall System Fencing Limited 21 of 29 Run-In Shed Instructions

Roofing Steel Cut 1 sheet of the 148 long sheet to the width as shown using the Circular saw and the blade for roofing steel. Use this sheet to start along one side of the roof. Lightly mark the Cladding with a pencil to indicate the position of the beams and wood for future reference. Start at one end and mount the steel using the pencil marks as a guide. System Fencing Limited 22 of 29 Run-In Shed Instructions

Roofing Steel Start at one end and overhang the 1 st sheet by ½ over the side edge of the shed. Drive screws through the steel and into the Roof Channels making sure to avoid the ribs. Leave the edge loose for the next sheet. Continue with all remaining sheets. The last sheet will need to be cut as well. Take the measurement making sure to add a ½ for the final side overhang. Wall Steel Starting at the Trim screw the steel to the shed; if at all possible, screws should NOT pass through the ribs. Leave the edge loose so that the next sheet can be overlapped. Continue along until you get to the far end. The last sheet should be the same dimensions as the first one you have cut, but Check just in case. Cut the last sheet and mount with the cut edge inside the Trim. Items GG and HH are both used for fastening the external wall steel, the difference being that GG is used where the screw attaches to the boards and HH is used where the screw attaches to steel posts or channels. System Fencing Limited 23 of 29 Run-In Shed Instructions

Once all the steel has been installed, the shed can be moved into its final position and secured in place using the earth anchors. The earth anchors are installed by twisting them into the ground. It is helpful to hammer them as you go with a sledge hammer. In some cases the ground may be too hard and the earth anchors may need to be dug into the ground. The anchors should be mounted at the four corners, just outside of the shed but in between the runners. This is so the horses will not need to walk over it when entering the shed. They should also be within 4 of the rail so that the chain will reach. Then use the chain and supplied links to connect the rail to the earth anchors. To finish off the shed install the supplied plastic caps on the open ends of the rails. The shed is now complete. Finished! Attached are additional instructions if you are in a high snow load area. System Fencing Limited 24 of 29 Run-In Shed Instructions

RUN-IN SHED OPTIONAL SNOW-LOAD SHEET If a building permit is required the following additional supports can be added to conform to local municipal building codes. This takes the snow load rating to 45?? lb/sq.ft. and is adequate for most areas of Canada and the United States. This can be added to existing structures as well as new buildings. The lumber and hardware is not included in the standard Run-In Shed kit. The following items need to be purchased; Wood 4x 2 x 10 x 12 foot Lumber Hardware 12x 6x 18x 18x 36x 3/8-16 UNC Bolts x 4-1/2 long 3/8-16 UNC Bolts x 6 long 3/8-16 UNC Nuts 3/8 Lock Washers 3/8 Flat Washers The following tools are required; - Circular Saw - Blade for above to cut 2 x 10 lumber - Electric Hand Drill - 7/16 Drill bit for above - 9/16 wrench - 9/16 socket w/ 3/8 drive ratchet System Fencing Limited 25 of 29 Run-In Shed Instructions

STEP 1 Using the Circular saw cut the 2 x 10 as shown. 2 are required for the Outside and 2 are required for the Center. The Notches are only necessary for the Center boards and should NOT be cut into the Side boards. Using the Electric Drill, drill the necessary holes into the wood as shown. System Fencing Limited 26 of 29 Run-In Shed Instructions

STEP 2 Remove the Nuts and Bolts for the rear Mid Connector Beam RS-W-152-A (See STEP 5 in the Run-In Shed Instructions) The steel sheeting and corner trim may have to be removed in order to access these bolts. Hold the Side 2 x 10 s in position and mark the holes that need to be drilled into the Posts. Three holes need to be drilled into the front post, and only one additional hole needs to be drilled into the back post. (The 2 holes for the Mid Connector Beam should line up with the holes in the 2 x 10 ). Lower the Board and drill the holes into the posts. System Fencing Limited 27 of 29 Run-In Shed Instructions

STEP 3 Raise the board into position and attach with the new hardware. Use the 6 long bolts for the Center Boards and the 4-1/2 long bolts for the Side Boards. Tighten with wrench and socket and replace the steel and trim if it was removed. System Fencing Limited 28 of 29 Run-In Shed Instructions