Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

Similar documents
CIRRUS AIRCRAFT FAI INSTRUCTION

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

AS9102 Training. First Article Inspection Guide. Rev A

AS9102B - APPLICABLE TO FORM # 1, 2, 3

(R) Aerospace First Article Inspection Requirement FOREWORD

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

AAI CORPORATION D/B/A TEXTRON SYSTEMS

HAMILTON SUNDSTRAND CORPORATION FAI REQUIREMENTS

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot

PPAP 3rd Edition Check List

2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved

Production Part Approval Process (PPAP) Marion Body Works, Inc.

Guideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems

INSPECTION REPORT N o

Flight Model (FM) Lot Acceptance Test Model (LAT) Quartz Crystal. Synthetic HiQ Quartz, SC-cut, HC-35/U 4-point

INS Process Outline Requirements

a. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.

Cover sheet ISIR (Initial Sample Inspection Report)

LETTER OF TRANSMITTAL

Electroimpact Supplier Inspection Documentation

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

Kinyun Australia KP : Procedure for Control of Engineering Drawings PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS

Working Drawing Manual

Angular Dependence Testing of the Innovative Industrial Solutions (IIS) WAM 500 D Area Monitor

OUTDOOR SOUND MODULE/TRANSMITTER MODEL: THE BANDIT

SABRe Briefs & Guidance

COMMERCIAL ITEM DESCRIPTION SHIELDING BEADS, FERRITE, LEADED, EMI SUPPRESSOR

This specification describes the general requirements for Engineering Services provided to Vale.

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, WIDEBAND, DIFFERENTIAL OPERATIONAL AMPLIFIER, MONOLITHIC SILICON

Application Specification Ultraminiature Bare Poke-in Contact 26FEB2019 REV:A2

SEI Certification Program Manual

Design For Manufacturing. Design Documents. Gage R&R DFM

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

SPECIFICATION FOR SINGLE-MODE OPTICAL FIBRES

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Drawing updated to reflect current requirements. gt R. Monnin

QUALITY CONTROL INSTRUCTIONS

ISO INTERNATIONAL STANDARD. Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes

CERTIFICAT D'ASSEMBLAGE ASSEMBLY CERTIFICATE

DEPARTMENT OF TRANSPORTATION

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Crimping Die Assemblies , , , , , , , , and 69653

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

Proposal Evaluation Methodology. For Narrow Band Power Line Carrier Equipment

DETAIL SPECIFICATION SHEET TERMINAL BOX, CONNECTION, SUBMERSIBLE (15-FOOT), 6-TERMINAL, 18-WIRE, 600 VOLTS, SYMBOL NO

Electroimpact Supplier Inspection Documentation

Physical Interface of SC TOSA Type 1 Package

ETSI TS V ( )

CTF - Customers' Testing Facility

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03

PROCESS SPECIFICATION PART MARKING STANDARDS

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, PRECISION 1.2 V VOLTAGE REFERENCE, MONOLITHIC SILICON

Object: Aptiv external communication about Product and/or Process evolution. Raw material securisation (PA 6.6 worldwide capacity shortage)

TPS 49 EDITION 2 JUNE 2009

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

BE PREPARED FOR SIGFOX READY TM CERTIFICATION

Inspection Report N : SOF/16/8703 Date of issuance: 30/05/2016 Page 1 of 11

CONTINUED ON NEXT PAGE..

TRANSMITTER MODEL: KAS-2030M

Effective Date: January Rev. 3/21/2018- Void After: January Product: Ceramic Plumbing Fixtures File No. 8317

Section Meetings Section Material and Equipment. None Required

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

--> Buy True-PDF --> Auto-delivered in 0~10 minutes. GB/T Translated English of Chinese Standard: GB

FTM2 Series HCMOS/TTL OSCILLATORS FOR SPACE APPLICATIONS 0.5MHz to 160 MHz. ( 5 x 3.2 mm, SMD, 2.5 V )

Manual Supplement Fluke Corporation. All rights reserved. Printed in U.S.A. x

PROCESS SPECIFICATION SURFACE FINISH REQUIREMENTS

Fabrication Documentation

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. D Add radiation hardened requirements. - ro R. MONNIN

NUMBER SOP STANDARD POLICIES AND PRACTICES PAGE 1 OF 4. April 15, 2012 STANDARDIZED PART MARKING PRACTICES REVISES POLICY DATED: July 1, 2010

Instructions for Continued

ISO INTERNATIONAL STANDARD. Fluid power systems O-rings Part 1: Inside diameters, cross-sections, tolerances and designation codes

(AMMA) American Maritime Modernization Association

Indian Standard SPECIFICATION FOR USE IN FOUNDRIES. 1.1 This standard covers the requirements for chaplets for use in foundries.

Transmission of Timing-critical Signals Using TTL Levels

Test Report. File No.: SHV01023/16 Test Report No.: Taizhou, Zhejiang , P.R. China

European Ground Systems Common Core

A. Section includes administrative and procedural requirements for project record documents, including the following:

JANUARY 30, 2012 TEST REPORT #211630B MIXED FLOWING GAS TESTING IPS1/IPT1 CONNECTOR SERIES SAMTEC, INC.

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED

Application Specification Slim WtoB Poke-in Connector

3GPP TS V ( )

Waste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started

Total Related Training Instruction (RTI) Hours: 144

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

COS NCM2 Mirror Substrate Specification

ISO INTERNATIONAL STANDARD

NOV 18 Rev B

THE NETHERLANDS (N E D E R L A N D) COMMUNICATION. Approval number: E4-10R Extension number: 00. Driving beam : N/A

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

NPS/001/010 Technical Specification for Fasteners and Fixings for Wood Pole Overhead Lines and General Construction Works

AN017 AS1113 / AS1124

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Drawing updated to reflect current requirements. - ro R. MONNIN

079 : 2000 CEB STANDARD ALUMINIUM BINDING WIRE

DRAFT UGANDA STANDARD

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Test Report. File No.: SHV04007/15-02 Test Report No.: , P.R. China

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT:

3GPP TS V ( )

Transcription:

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions

PURPOSE Ensure the product being delivered meets drawing requirements Including any material and test specifications identified Provide expectations to allow proactive practices to support effective generation of a completed FAI... Expectations are to flow FAI requirements to sub-tier suppliers as required per AS9102 Supplier can then receive FAI documentation from sub-tier suppliers. 2

TEXTRON SYSTEMS EXPECTATIONS First article inspection shall be performed on a representative of the first production lot of the latest production configuration in accordance with AS9102 AS9102 is available through SAE International http://standards.sae.org/as9102b/ All related process and test documentation should be included A detailed bill of material (BOM) should be included in the FAI report Include all Textron Systems drawing requirements in the FAI report Ensure the current revision Textron Systems drawing is being used Textron Systems prefers to receive the report in electronic format If proprietary concerns are applicable, discuss with your Supplier Quality Engineer All documents shall be under revision control in your document control system 3

TEXTRON SYSTEMS FORM EXPECTATIONS Sub-assemblies that require a separate FAI report are to be listed on Form 1 section 15 Complete separate FAI reports & attach to top assembly report Identify COTS (Commercial Off-The-Shelf) parts on the BOM COTS parts need to be recorded on Form 2 Modified COTS parts are considered sub-assemblies and should be included in form 1 List the ATP document number and revision on Form 2 section 11 and include the document in the report List any special processes and the associated industry specifications on Form 2 Include tolerance information in Form 3, column 8 and record actual dimension in column 9 Do not use Pass or Complies for dimensional data No need to include reference dimensions on form 3 4

FORM 1 EXAMPLE List the sub-assemblies that are part of the FAI assembly and include the FAI report number in column 18. 5

FORM 2 EXAMPLE 6

FORM 3 EXAMPLE 7

INCLUDED SECTIONS AND PAGES Bubbled Drawing BOM 8

INCLUDED SECTIONS AND PAGES (CONT) Certificates of Conformance (CoC) Material Certificates 9

DETAILS BY AS-9102 FIELD Form #/ Field # (e.g., 2/1 = form 2 / field 1) 1/1: part # from PO 1/2: part name from PO (abbreviated name) 1/3: S/N of FAI part (N/A if not applicable) 1/4: Supplier generated FAI report number 1/5: Part revision from Textron Systems PO (may include Parts List Rev) 1/6: Textron Systems drawing number 1/7: Textron Systems drawing revision 1/8: Identify additional changes if applicable (else N/A) 1/9: Supplier Work Instruction # (or build to print ) 10

DETAILS BY AS-9102 FIELD (CONT) 1/10: Supplier name 1/11: Cage code number (else Textron Systems Supplier number) 1/12: Textron Systems PO # to Supplier 1/13: Check Detail FAI if FAI is a detail part. Check Assembly FAI if FAI is an assembly. 1/14: Partial = Delta FAI, this should be used on ECN changes when a completed FAI has been performed 1/15-18: Sub-assemblies required to make the assemblies noted above Supplier lower level FAIs or sub-tier FAIs required for assemblies 1/19-23: Signatures and approvals 11

DETAILS BY AS-9102 FIELD (CONT) 2/1: part # from PO 2/2: part name from PO (abbreviated name) 2/3: S/N of FAI part (N/A if not applicable) 2/4: Supplier generated FAI report number 2/5: Material or Process name of parts listed on the BOM that are not subassemblies listed on form 1 2/6-7: Identify and specification number and code. Example: Spec = IPC-610, Code = Class 3 2/8: Special process supplier code if required 2/9: Customer approval if required 2/10: Include C of Cs and any other certifications for the item listed column 1 2/11: List test procedure number if test is performed 2/12: List test report number if available 2/14-15: Signature and date 12

DETAILS BY AS-9102 FIELD (CONT) 3/1: Part number from PO 3/2: Part name from PO (abbreviated name) 3/3: S/N of FAI part (N/A if not applicable) 3/4: Supplier generated FAI report number 3/5: Include bubbled drawing number 3/6: Drawing reference location 3/7: Characteristic type (if applicable) 3/8: Drawing dimension, must include tolerances (if applicable) Reference dimensions not needed 3/9: Measured dimension, for non-dimensional items that require visual acceptance mark visual 3/10: Record special tool ID number and if tool is calibrated record due date in column 14 3/11 Record any non-conformance number if the characteristic is found to be non-conforming 3/12-13: Signature and Date 3/14: Any additional comments 13

QUESTIONS? Contact your Textron Systems Supplier Quality Engineer with questions or concerns related to these directions. 14