For personal use only

Similar documents
2015 Trinidad Update. Trinidad & Tobago Energy Conference

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

For personal use only

Phoenix project drilling update 29 June 2017

QUARTERLY ACTIVITY REPORT

Dorado-1 drilling commenced 5 June 2018

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

ALASKA OPERATIONS UPDATE WINX-1

For personal use only

Phoenix South-3 drilling update 29 June 2018

Kinetiko Energy Limited ACN:

Quarterly Exploration Activities Report

Phoenix South-3 drilling commenced 17 April 2018

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

For personal use only

For personal use only

For personal use only

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

Leni Gas and Oil plc. Annual General Meeting. London (AIM): LGO 1. 7 July 2014

Leni Gas and Oil plc. Corporate Summary, July London (AIM): LGO 1

For personal use only

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

For personal use only

Quarterly Report 31 December 2018

For personal use only

For personal use only

FY19 production and capital expenditure guidance

For personal use only

The Directors wish to inform you about recent exploration activities:

Cuba: Binding farmout agreement signed for Block 9

Matthew Allen MD & CEO Joint Venture partner Byron Energy (Operator) is a proven

Annual General Meeting 11 September 2017

For personal use only

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

Alaska New Billion Barrel Fairway July 2018

FAR in the MSGBC Basin

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

Good Oil Conference. 7-8 September Slide 0

An Australian Company with Growing Onshore Oil Production in Indonesia

For personal use only

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Gas Storage and Oil & Gas Exploration in County Antrim

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

For personal use only

A Step Change in Activity

Buffalo field moving closer to production 3 May 2018

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE. 2 NOVEMBER 2018.

For personal use only

EMP Approval to Drill Next Dome Complex

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

Initial Drilling Program Update

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

Quarterly Activities Report 31 January 2013

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

Company Presentation. AGM 29 th November, 2016

Freedom Oil & Gas to Webcast Investor Presentation at VirtualInvestorConferences.com on April 11

Persistence, partnership and the prize

KEY MANAGEMENT APPOINTMENTS MADE AS DALGARANGA PROGRESSES TOWARDS DEVELOPMENT

MEO Australia Limited ABN ASX & Media Release

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide

Annex- II MARGINAL/ STRANDED GAS FIELDS- GAS PRICING CRITERIA AND GUIDELINES, 2013 GOVERNMENT OF PAKISTAN MINISTRY OF PETROLEUM & NATURAL RESOURCES

Kingdom of Cambodia: Institutional Strengthening of the Cambodian National Petroleum Authority

BUILDING VALUE THROUGH WORLD CLASS ASIAN ASSETS AGM, 5 SEPTEMBER 2018

For personal use only

NEW LIBERTY GOLD MINE: GOLD RECOVERIES IMPROVING

Q1 FY18 Quarterly Report for 3 months to 30 September 2017

Q3 FY18 Quarterly Report for 3 months to 31 March 2018

For personal use only

TMS Initial Drilling Program Update

For personal use only

For personal use only. Nkembe PSC. Havoc Partners option and Add Energy s well planning agreements

Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW By E-Lodgement

For personal use only

Q2 FY18 Quarterly Report for 3 months to 31 December 2017

For personal use only

MADAGASCAR OIL LIMITED ( Madagascar Oil or the Company ) Admission to AIM & First Day of Dealing

Q4 FY18 Quarterly Report for 3 months to 30 June 2018

4 Briefing. Responsible investor

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

For personal use only

Proposed Reverse Takeover by Warrego Energy Limited and AIM Listing. David Casey Managing Director & CEO

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

OFF-TAKE MOU SIGNED WITH MAJOR CHINESE FERTILISER GROUP

Esso offshore projects

3D Oil Limited Annual General Meeting

EKEH FIELD DEVELOPMENT

GOOD OIL CONFERENCE SEPTEMBER

Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies

For personal use only

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

Annual Statement of Reserves

Letter of Intent Signed for Philippines Drill Rig

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2016

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

Hague and London Oil Plc

MAYOKO-MOUSSONDJI DEVELOPMENT PLAN SUBMITTED TO REPUBLIC OF CONGO GOVERNMENT

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

Transcription:

Range Resources Limited ( Range or the Company ) 24 September Trinidad Operations Update Range is pleased to provide the following update with respect to its Trinidad operations, with the following highlights: The MD 42N well is drilling ahead at 2,180 ft. to a target depth of 3,120 ft.; Four further wells are expected to spud before the end of ; The new 4,000m rig has been successfully mobilised to the Diablo field, ahead of spudding. Three directional wells will be drilled from the drilling pad, using this rig. The construction of the drilling pad is currently ; The Company expects to have four rigs available for drilling during. Three additional new rigs are expected to arrive in Trinidad by the end of September and be available for drilling from November; The average production in Trinidad during the last 30 days was 590 barrels of oil per day ( bopd ); The Company is on track to achieve the previously announced production target of 1,000 bopd by the end of ; A work programme for on the St Mary s block is. Approvals for environmental permitting and a work programme and budget for 2016 have also been prepared. As previously announced, Range provided the Ministry of Energy and Energy Affairs with the required performance bond of US$8 million in support of the minimum work obligations on the licence; The Company received consent from the government for the transfer of the remaining interest on the Guayaguayare block and is currently finalising the necessary documents, expected to be completed by the end of September; and Applications for necessary government and regulatory approvals for Beach Marcelle and Diablo waterflooding have been submitted and are expected to be received during Q4. Drilling programme update Range is pleased to advise that the MD 42N development well, which spudded on 4 September, is drilling ahead at 2,180 ft. to a total depth of 3,120 ft. The drilling of the well will continue to its target depth using rig 2. The well is being drilled to test the prolific Upper Cruse channel sand complex at a depth of 1,650 ft. (secondary target) and the extent of the underlying Middle Cruse sand trend at a depth of 3,120 ft. (primary target). Range s estimate of recoverable oil from the well is 72,000 barrels. Additional drilling locations may be proven up with the success of the MD 42N well. Following a further review of the drilling work programme announced on 24 August, Range has made some adjustments to the drilling schedule. The wells expected to be drilled during are summarised in the table below. In addition, the Company now plans to drill three directional development wells (MD 51-1, MD 51-2 and MD 51-3) from the drilling pad, using the new 4,000m rig. The rig has been successfully mobilised to Diablo field, ahead of spudding the first of the three directional wells, the MD 51-1 well, which will be drilled to a total depth of 3,850 ft., subject to government and regulatory approvals. Range Resources Limited Australian Office UK Office e. admin@rangeresources.co.uk AIM: RRL Ground Floor, BGC Centre 10 Adam Street ASX: RRS 28 The Esplanade The Strand www.rangeresources.co.uk Perth WA 6000 London, WC2N 6AA Australia United Kingdom t. +618 6205 3012 t. +44 (0)20 7520 9486

Drilling at Diablo for 4,000m Proposed Well MD 42N GY 180SE Canari North (exploration)* GY 68 NW MD 51-1 Well Diablo Beach Marcelle Guayagua yare (Shallow) Beach Marcelle Diablo Target Depth (ft.) Target Horizon 3,120 Upper Cruse and Middle Cruse 1,820 Lower Gros 5,000 Lower Gros 1,467 Middle Gros Drilling 2 2 8 Rental 3,850 Middle Cruse 4,000m Proposed Spud Date Spudded on 4 September Status Drilling ahead at 2,180 ft. planning is Construction of the location completed planning is Construction of the location Drilling Schedule for September / *The Canari North well approval has expired on 7 September, and Range plans to apply for an extension in early, ahead of spudding. Once the extension is granted, it will be valid for 3 months. The drilling programme remains subject to a number of variables, including availability of rigs, commissioning of new rigs into the Range Resources Drilling Services Limited (RRDSL) rig fleet, various regulatory approvals and the construction of drilling pads. RRDSL will also be required to recruit additional drilling staff to operate the new rigs. 2

The Company also provides the following update on the previously drilled development wells located in the South Quarry field: The QU 454ST well was tested in September and did not encounter any commercial hydrocarbons. The well was subsequently capped. Following further well log evaluations and given uneconomic test results from similar horizons in the adjacent QU 455 well, it was considered not feasible to test the QU 456 well. As a result, the well was capped. Drilling fleet As advised by RRDSL, the status of the drilling rigs is as follows: 2 Status Drilling ahead the MD 42N well 6 Maintenance upgrades have been completed. Following further assessments, RRDSL decided to use the rig for workover operations 8 Mast and crown repairs have been completed. tests are Rental New (4,000m) New s (2,000m,1,500m, 1,000 m) The contract for the rig is still being negotiated and is expected to be finalised during September. The delay in finding a suitable rig has been caused due to a limited availability of mid-size rigs in Trinidad The rig has been successfully mobilised to Diablo field, ahead of spudding the MD 51-1 well, subject to government and regulatory approvals. RRDSL is in process of hiring local crew and preparing for the regulatory inspections. Construction of a three-cellar drilling pad is En route to Trinidad, expected to arrive by the end of September and be available for drilling from November, subject to government and regulatory approvals *s 1 and 5 were not included in the table above as those rigs will not be used for drilling operations in the near term. Exploration programme St Mary s block As previously announced, the work programme on the St Mary s block has commenced with the audit of existing field infrastructure, facilities and wells currently. 3

Range has prepared the relevant documentation for environmental permitting for production operations of existing wells and facilities, Electro Magnetic Surveying (Stratagem) and drilling of both development and exploration wells, expected to be submitted for approvals at the beginning of. Range is planning to commence the tendering process for drilling rigs, equipment, and other oilfield services during Q4. As required under the Joint Operating Agreement, Range has also prepared a work programme and budget for 2016 for both exploration and development components, which is currently under review by the Joint Venture Partner, Petrotrin. Range has committed to drilling four exploration wells, shooting 160km of 2D seismic and 60km 2 of 3D seismic, along with various other technical studies before the end of 2018. Guayaguayare block As announced on 21 May, Range signed an amendment agreement to acquire the full remaining interest of Niko Resources Ltd in the block. Range has received consent from the government for the transfer and is currently finalising the necessary documents, which is hoped to be completed by the end of September. Following completion of the agreement, Range will hold an 80% interest in the Deep Production Sharing Contract ( PSC ) and a 65% interest in the Shallow PSC. Application for the extension of the PSCs has also been submitted and Range hopes to receive this shortly. Range currently holds a 40% interest in the Deep PSC and a 32.5% interest in the Shallow PSC and is the Operator of the block. The Company continues to prepare for spudding of its first exploration Canari North well. The well is expected to spud once rig 8 is available and approved for drilling, and the well approval extension is granted. Waterflood programme The Company has submitted applications for necessary government and regulatory approvals for Beach Marcelle waterflooding, expected to be received during Q4. As announced on 24 August, the Company also submitted applications for necessary government and regulatory approvals for the revised Diablo waterflooding, expected to be received during Q4. Once approvals are in place, the Company looks forward to sharing further details on the waterflood programmes and the benefits of LandOcean s detailed work and studies completed on the projects as part of Purchase Order 1. The Company will continue to provide regular updates to the market on the progress of its operations. Qualified Person's Statement In accordance with AIM Rules, Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and signed off by Dr Douglas Field. Dr Field is a petroleum and reservoir engineer who is a suitably qualified person with over 30 years experience in assessing 4

hydrocarbon reserves, and holds a PhD in Organic Chemistry. The reserves information in this announcement has been prepared in accordance with the guidelines of the Society of Petroleum Engineers (SPE). SPE Definitions Proved Reserves are those quantities of petroleum, which by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations. Probable Reserves are those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. 1P refers to Proved Reserves, 2P refers to Proved plus Probable Reserves. Contact Details Range Resources Limited Evgenia Bezruchko (Investor Relations) e. admin@rangeresources.co.uk t. +44 (0)20 7520 9486 Cantor Fitzgerald Europe (Nominated Advisor and Broker) David Porter / Sarah Wharry (Corporate Finance) Richard Redmayne (Corporate Broking) t. +44 (0)20 7894 700 5