FEMA Elevation Certificate

Similar documents
Common Floodplain Permit & Elevation Certificate Errors

ELEVATION CERTIFICATE

ELEVATION CERTIFICATE Important: Follow the instructions on pages 1-9.

Welcome to the. City of Milford s Elevation Certificate Workshop Dec

City of Keizer Floodplain/Greenway Development Application

Residential Room Addition / Remodel Submittal Requirement Checklist

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

PLAN SUBMITTAL REQUIREMENTS

ELEVATION CERTIFICATE FEDERAL EMERGENCY MANAGEMENT AGENCY

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

APPLICATION FOR SITE PREPARATION PERMIT

INFORMATION FOR OBTAINING A BUILDING PERMIT

TO WHOM IT MAY CONCERN:

INFORMATION FOR OBTAINING A BUILDING PERMIT

North Carolina No-Rise Guidance Document

PLANNING AND DEVELOPMENT

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

Presented By: Todd Ward Project Manager

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

FEMA Conditional Letter of Map Revision (CLOMR) Process. Shawn Arden, PE, CFM OTEC 2017

Summerland Planning Advisory Committee

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

Commercial Building Permit Process

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW SINGLE-FAMILY DWELLING

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

Commercial Infill Project Guide

Residential Construction Checklist Single and Two Family Construction

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

NEW SINGLE FAMILY HOMES

*For complete material(s) information, refer to

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

CITY OF LOVELAND HOMEOWNERS GUIDE FOR BUILDING PERMITS FOR HOME IMPROVEMENTS

Certified Professional (CP) Frequently Asked Questions

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

CLIPPER ESTATES HOMEOWNER S ASSOCIATION DESIGN GUIDELINES

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

INFORMATION FOR OBTAINING A BUILDING PERMIT

SITE PLAN REVIEW GUIDELINES Rev. 2016

Minor Site Plan Review Process

Permit Application. General Information

Site Plans. City of Hopkins Inspections Division st Street South, Hopkins, MN Fax

Tenant Improvement. Training in the fundamentals of Commercial Construction

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

BERKELEY COUNTY ENGINEERING AND

GATEWAY LAND CORP. Builder: Contact Telephone: Builder address Fax No. : Purchaser s name Lot: Block: Plan: Subdivision: Riverstone Address City:

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

Single-Family Dwelling Submittal Requirements

PROJECT ADDRESS: PERMIT #

Digital Letter of Map Change (DLOMC) Guidelines May 2010

Tri-County Commercial Application Checklist

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

RANDY SCHMELING INSPECTIONS HARDER ROAD THREE RIVERS, MI Home Mobile

Architectural Design Process

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural

Information package for obtaining a building permit

Subdivision Application Checklist

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together

The Benefits and Appropriate Use of Base Flood Approximate Shapefiles to Calculate Zone A Base Flood Elevations. Jeremy Kirkendall, CFM June 12, 2013

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831) TDD: (831)

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

OAK RUN BUILDING PERMIT

Procedure to Petition for Plat Review and Site Plan Review

Applying for a Site Development Review

Town of Holly Springs Sign Installation Packet

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

Part 4: Visitability Ordinance. City of Austin Development Services Department

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

TOWN OF NORTH BRANFORD

ARB Submittal Package Checklist

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

Checklist for Minor Plan Modification

A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING

PLANNING DEPARTMENT. Measuring Your Vacation Rental and Drawing Scaled Plans

ARCHITECTURAL DESIGN II (544)

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

Transcription:

Visual 320.1 Visual EC-1

Required to rate post-firm and some pre-firm buildings Determine compliance with floodplain management ordinance Support LOMA/LOMR-F Prerequisite for the CRS Visual 320.2 Visual EC-2

Current Version: FEMA Form 086-0-33 (7/15) Mandatory for use after Good until the 11/30/2018 expiration date Download from FEMA.gov PDF and PDF fillable versions Visual 320.3 Visual EC-3

Visual 320.4 Visual EC-4

Manual Pages 310-7 8 Checklist in the 2013 Manual still good Visual 320.5 Visual EC-5

Visual 320.6 Visual EC-6

Not needed for local permits or CRS (But still a good idea) Visual 320.7 Visual EC-7

Manual Page 310-7 Visual 320.8 Visual EC-8

Elevation Certificate Instructions Page 13 Diagram 1A = slab-on-grade Visual 320.9 Visual EC-9

Elevation Certificate Instructions Page 13 Diagram 1B = raised slab or foundation wall with fill Visual 320.10 Visual EC-10

Elevation Certificate Instructions Page 13 Diagram 2A = full basement Visual 320.11 Visual EC-11

Elevation Certificate Instructions Page 13 Diagram 2B = full basement, door below ground level Visual 320.12 Visual EC-12

Elevation Certificate Instructions Page 13 Diagram 2B = full basement, door below ground level Visual 320.13 Visual EC-13

Elevation Certificate Instructions Page 14 Diagrams 3 & 4 = Split levels Visual 320.14 Visual EC-14

Elevation Certificate Instructions Page 14 Diagrams 5 & 6 = Elevated on piers, posts, piles, etc. Visual 320.15 Visual EC-15

Elevation Certificate Instructions Page 15 Diagram 7 = Elevated on full story foundation walls Visual 320.16 Visual EC-16

Elevation Certificate Instructions Page 15 Diagrams 8 & 9 = Elevated on crawlspaces Visual 320.17 Visual EC-17

Elevation Certificate Instructions Page 15 Diagrams 8 & 9 = Elevated on crawlspaces Diagram 9 = Compliant, below grade crawlspace < 5 high, < 2 below grade If below grade crawlspace > 5 high or > 2 below grade basement Visual 320.18 Visual EC-18

Diagram Number Assignment Visual 320.19 Visual EC-19

Diagram Number Assignment We ll show a photo of a building Each building is compliant You see the whole building don t invent things on the other side of the building Determine the diagram number for each building Raise the appropriate Diagram number card If a table raises >1 card, it is disqualified Visual 320.20 Visual EC-20

What diagram? FEMA Elevation Certificate Visual 320.21 Visual EC-21

What diagram? FEMA Elevation Certificate Visual 320.22 Visual EC-22

What diagram? FEMA Elevation Certificate Visual 320.23 Visual EC-23

What diagram? FEMA Elevation Certificate Visual 320.24 Visual EC-24

What diagram? FEMA Elevation Certificate Visual 320.25 Visual EC-25

Visual 320.26 Visual EC-26

What diagram? FEMA Elevation Certificate Visual 320.27 Visual EC-27

What diagram? FEMA Elevation Certificate Visual 320.28 Visual EC-28

What diagram? FEMA Elevation Certificate Visual 320.29 Visual EC-29

What diagram? FEMA Elevation Certificate Visual 320.30 Visual EC-30

What diagram? FEMA Elevation Certificate Visual 320.31 Visual EC-31

Elevation Certificate Instructions Page 8 1,405 10 1,680 Measure from exterior or interior grade, whichever is higher Visual 320.32 Visual EC-32

Elevation Certificate Instructions Page 8 1,405 10 1,680 A9 Attached garage: Separate from the rest of the building No floors above it Visual 320.33 Visual EC-33

Elevation Certificate Instructions Page 8 1,405 N/A 10 1,680 N/A N/A Visual 320.37 Visual EC-37

Elevation Certificate Instructions Page 8 1,405 N/A X 10 1,680 X N/A N/A If yes, record the actual area of the openings and attach the engineer s certificate or the ICC Evaluation Service report Visual 320.38 Visual EC-38

Visual 320.39 Visual EC-39

Elevation Certificate Instructions Page 9 Complete the Elevation Certificate on the basis of the FIRM in effect at the time of the certification. B4. For maps in a county-wide format, the sixth character of the Map Number is the letter C followed by a fourdigit map number. For maps not in a county-wide format, enter the Community Panel Number shown on the FIRM. Visual 320.40 Visual EC-40

FEMA Elevation Certificate Visual 320.41 Visual EC-41

Elevation Certificate Instructions Page 9 Complete the Elevation Certificate on the basis of the FIRM in effect at the time of the certification. B5. Suffix comes after the panel number Indicates how many times the panel has been revised B8. Use the zone for the building If building is in > 1 zone, list all the zones B9. Except in Zones AO and A, use the BFE on the FIRM, not a higher local regulatory flood elevation Visual 320.42 Visual EC-42

Elevation Certificate Instructions Page 9 Complete the Elevation Certificate on the basis of the FIRM in effect at the time of the certification. Visual 320.43 Visual EC-43

Elevation Certificate Instructions Pages 10 11 Visual 320.44 Visual EC-44

Elevation Certificate Instructions Pages 10 11 Section C2.a) h) Every time If >1 floor V Zones If garage Every time Every time Every time e) Describe the machinery or equipment in Section D s comments Visual 320.45 Visual EC-45

Elevation Certificate Instructions Pages 10 11 Section C2.a) h) Every time If >1 floor V Zones If garage Every time Every time Every time Not on checklist Only needed for LOMAs and LOMR-Fs Not on the CRS EC checklist Visual 320.46 Visual EC-46

Section C2 Assignment Elevation Certificate Instructions Pages 10 11 Every time If >1 floor V Zones If garage Every time Every time Every time Not on checklist Visual 320.47 Visual EC-47

House #1 in the AE Zone 477.6 476.2 478.6 478.1 478.0 (grade) (A/C in back yard) (first floor) (garage floor) (grade) Visual 320.48 Visual EC-48

House #1 in the AE Zone Diagram No.? 1A 478.6 x N/A N/A 478.1 x 476.2 x 477.6 x 477.6 476.2 478.6 478.0 478.1 x 478.0 (grade) (A/C in back yard) (first floor) N/A (garage floor) (grade) Visual 320.49 Visual EC-49

House #2 in the AE Zone 17.7 7.7 (bottom of stairs) 7.9 (grade) 17.6 16.5 8.1 (slab) 8.0 (grade) Visual 320.50 Visual EC-50

House #2 in the AE Zone Diagram No.? 6 17.7 7.7 (bottom of stairs) 8.1 x 17.7 x 16.5 x N/A 17.6 x 7.9 (grade) 7.9 x 8.0 x 7.7 x 17.6 16.5 8.1 (slab) 8.0 (grade) Visual 320.51 Visual EC-51

House #3 in the AE Zone Garage floor: 317.0 Driveway: 316.9 Vent Front door threshold: 318.6 Vents Furnace and water heater are on a platform 2.0 feet above the garage floor Crawlspace floor: 315.6 Grade: 316.1 Visual 320.54 Visual EC-54

House #3 in the AE Zone Diagram No.? 9 Garage floor: 317.0 Driveway: 316.9 Vent Front door threshold: 318.6 Furnace and water heater are on a platform 2.0 feet above the garage floor 315.6 x 318.6 x N/A 317.0 x 319.0 Vents x 316.1 x 316.9 x N/A Crawlspace floor: 315.6 Grade: 316.1 Visual 320.55 Visual EC-55

Elevation Certificate Instructions Page 11 Visual 320.56 Visual EC-56

Elevation Certificate Instructions Page 11 Can be completed by property owner or permit official Visual 320.57 Visual EC-57

Elevation Certificate Instructions Page 11 Visual 320.58 Visual EC-58

Elevation Certificate Instructions Pages 11 12 Visual 320.59 Visual EC-59

Helpful Hints Never assume the EC was filled out correctly because it has the professional surveyor's seal on it Establish a review process that determines if the EC is complete and correct, preferably done as part of the final site inspection Make a complete and correct EC a condition for the certificate of occupancy Fill out as much of the EC as you can at the time of the permit application (i.e., Sections A and B) FEMA Regions conduct workshops on the EC Visual 320.60 Visual EC-60

Questions? Visual 320.61 Visual EC-61