Machine Shop Processes

Similar documents
SECTION BULLET- RESISTANT DOORS

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

Manufacturing Workmanship Standards. KSO Rev 1

SECTION METAL FABRICATIONS

Hose Hanger Cold Metal Work

MAG-MATE* Series 300 Terminals

MIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS

Liner Replacement (Stainless Steel Internal Components)

Manufacturing Workmanship Standards YHF-WS Rev 2

Application Specification Ultraminiature Bare Poke-in Contact 26FEB2019 REV:A2

MIL- B Rev NAVSEA 0900-LP

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002

Barofor Round System (polyester coated) Panels, Posts, Accessories

Manufacturing Workmanship Standards Implemented November 2011

60 DIRECT-TO-STUD SHOWER WALL SET

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

UNSIGNED HARDCOPY NOT CONTROLLED

Thank you for your business. Sincerely, Jason Greeson

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

EXTERNAL FEATURE: Feature on the part being delivered to a Lisk customer which is visible without disassembly.

PRODUCT SPECIFICATION

Application Specification Slim WtoB Poke-in Connector

PRODUCT SPECIFICATION

3400 Tectura Designs Precast Concrete

PRODUCT SPECIFICATION

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

Application Specification Releasable Poke-in Connector 08JUL 2015 REV:A

PAGE 12 : THREAD MEASUREMENT TECHNIQUE (Plated and unplated thread gauges)

Quality Assurance Supplier Reference Guide

IHES-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Zachary Kraft Manufacturing

Operation Manual K

SIAMEZE* Standard and Fine Range Terminals

DESCRIPTION & FEATURES

METAL METAL

Stock Materials Interior Fillets... 10

G.W. Lisk Co., Inc. Workmanship Manual DOC Rev 3

This Injection Mold Standard is used for the design and fabrication of Plastic Injection Molds.

Solder Tine Terminal Crimp Wire Terminal. Retention Barb Carrier Strip. Wire Lead-In. Slotted Beams Housing (Customer Supplied) Figure 1

Manufacturing and Cosmetic Inspection Specification

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

DRAFT TANZANIA STANDARD MEDC 10(5692) P3 - SPECIFICATION FOR HONEY EXTRACTOR, RADIAL TYPE

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Versai Evolution of Versatile Fencing

Aluminum and Steel Machined Flaperon Handle for Belite Aircraft ASSEMBLY INSTRUCTIONS. Last Revised January 7, 2016

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment

STRUCTURAL STEEL AND ALUMINUM PART 1 - GENERAL 1.01 SCOPE:

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

High Current Pin and Socket Contacts 31 JUL 13 Rev C

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

Aluminum Crack Repair. Without Welding

Shay Cab - Floor & Roof

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

Quality Assurance Supplier Reference Guide

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

SECTION THERAPEUTIC POOL ACCESSORIES

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

Die Life Checklist. Part Consideration. Critical to Function & Cosmetic. Cosmetic, No Function. Critical to Function. Not Critical but Functional

User Guide: Manufacturing Guidelines. Contents

(a) Work gloves may be cloth, leather palm, or all leather; (b) Welding gloves are gauntlet-type gloves with high

Product Guide Specification

Design for Manufacturability Guide

Product Guide Specification

Welding-Oxy Fuel Metals Joining

Midmark Stainless Steel Cages Setup Manual

1.1 RELATED DOCUMENTS

Plumbing Part II - Hand Pump

ITEM#:DNSW5102J PK IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY. St. Thomas Swivel Rocking Dining Chair

Installation Instructions

US RACK, Inc Falcon Drive, Madera, CA

Construction Guidelines 1

Symphony II Adaptable Table System

Delmec Engineering Limited

WELDING FABRICATION NYS

Initial release of document

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

BCI General Specifications Design: BCI Gothia Shelving System

A Reference Guide. Continuous Hinge, Inventory and Service Worldwide Est End Play Design Engineering with Standard Continuous Hinges

Credentials for Career Technical Education Teachers and/or Students

Welding Qualification/Certification

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Weldment Visual Inspection Requirements

Solutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs

Draft for comments only Not to be cited as East African Standard

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

Vitratek Porcelain Enamel Contract Specifications

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

Fabrication Documentation

(R) Aerospace First Article Inspection Requirement FOREWORD

TYONEK FABRICATION CORPORATION SHAREHOLDER TRAINING PROGRAM

TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8

COMMERCIAL ITEM DESCRIPTION RODS, GROUND (WITH ATTACHMENTS)

Kent Metal Products Vanguard Road Richmond, British Columbia, Canada. V6X 2P KentMetalProducts.com

FLEX ENCLOSURE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Norris Sucker Rod Project. Andrew Dickey, Justin O Neal, and Daniel Whittlesey

ETCHED PLAQUES by Matthews International

Design Guide: Sheet Metal Fabrication VERSION 2.1

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

Transcription:

Machine Shop Processes 100-1122-00 Owner 1 of 6

Approvals: Department Approved. Date Engineering D. Scott Timms 11/7/17 Manufacturing D. Scott Emond 11/7/17 Quality Andrew Ware 11/7/17 Change History Rev Description By Date - Initial Release D. O Dell 1/22/15 A Added bullet for operators to write welding rod P.O.#on W.O. 12.0 Added : components with safety welds do not have to pass nugget test 14.0 Rewrote paragraph 6.0 New owner B Updated Sections 4.0, 6.0, 7.0, and 13.0. C Added notes to sections 4.0, 5.0, 6.0, 10.0, and 11.0. Added section 15.1 & 15.2. D E F Add reference AWS C3.4 to section 2.0. Added section 3.4. Added detail to section 9.0 from C3.4. Strengthened section 10.0 for inspection, and updated section 11.0 to more accurately describe modern method. Added reference 100-1156-00 brazing qualification procedure. Updated section 9.0. D. O Dell 2/16/15 7/14/15 11/13/15 01/14/16 11/7/16 11/7/17 2 of 6

1.0 Scope This procedure defines Captor s machine shop processes. 2.0 Reference documents 100-1122-MSCL Machine Shop Check List (Previously defined as 100-646-CSCL) 100-646-00 Workmanship Manual (Chapters 2, 15, 16) 100-991-00 Safety Manual 100-990-00 Production and Material Control 100-1032-00 Material Handling 100-1063-00 Control of Non-Conforming Product Procedure 100-1065-0 Control of Monitoring and Measurement Devices 100-1113-00 FOD Procedure 100-1156-00 Brazing Qualification Procedure AWS D17.1 Welding for Aerospace AWS D9.1 Sheet Metal Welding AWS C3.4 Torch Brazing Forms - 100-1122-WCML 100-1122-TL 100-1122-BQ Welder Certification Maintenance Log Training Log Braze Qualification 3.0 Workmanship standards 3.1 When specific requirements are identified in the TDP ( Technical Data Package ), the TDP will take precedence. 3.2 - Welding guidelines will be to AWS D17.1 class C 3.3 - Machining, Modifications and Fabrication guidelines will be to 100-1122-MSCL and standard work practices. 3.4 Brazing will be done in accordance with AWS C3.4M/C3.4 class C. 4.0 Product configuration Follow the 100-1122-MSCL and 100-990-00 (section 5.2) to ensure paperwork (work order, print, layout, and programs) is all to the same revision. If any issues arise see machine shop line leader or technical support for clarification. 5.0 Material control For raw material lot traceability, raw material will be identified with part number and purchase order number. When material is consumed against a work order, the P.O. number of the material used is recorded on the work order. If P.O. cannot be found see machine shop line leader for necessary information. Some materials may be issued from stockroom and should be collected from the incoming shelf at the beginning of the job. Follow 100-990-00 section 3.3. 3 of 6

6.0 Over-run Parts All completed aluminum, brass, epoxy, and copper parts, complex parts with greater than 3hrs. build time and parts that are frequently run (line leaders discretion) may be kept for an unlimited time if they are compliant to print. Prototype builds, modifications and any completed or compliant parts that do not fall under unlimited time can be kept for 3 months. Any material that is not compliant to print cannot be kept. All completed over-run parts that are being held for any length of time must have the part #, P.O.#, revision, and date of completion clearly visible on the item and be up to date in the Machine shop master inventory list. Any completed over-run parts being used must be 100% inspected prior to use and be removed from the master inventory list. 7.0 Weld grinding Weld grinding should be kept to a minimum. When grinding is required, the operator should keep the grinding surface parallel to the can wall. This helps to ensure weld strength is not compromised. Completed welds should have visual evidence of ripple to ensure that the weld in not over ground. During grinding, the ground area shall not reduce the weld bead size or the base metal thickness below drawing tolerances. 8.0 Mounting surfaces When mounting patterns for the next higher level are identified, the surface of the mounting area and its surrounding welds should be flat. Sanding/ buffing /grinding of mounting surface plane is acceptable to ensure the product has a proper fit and is free of obstruction during the next higher lever of assembly. 9.0 Inserts Brazing Insert brazing should be a full 360 around the insert. Care should be taken to ensure braze build up does not interfere with hardware used at the next higher level. Inserts shall be no greater than 3 from perpendicular to the mating surface. Ensure that all threads meet thread class and perpendicularity after brazing as overheating can deform internal threads. Standard hardware may be used by operator to check threads. Brazes must be free of cracks, voids, and pin holes. Operators are required to use materials 101-012-02 (flux) and 101-345-03 (rod) when brazing. The material called out by these Captor part numbers are found to be acceptable by AWS C3.4 and Captor for brazing. Brazing is done in compliance with AWS C3.4 class C spec. 10.0 Inspection Each operator shall ensure that their parts are compliant to print requirements prior to submitting to inspection. A minimum of one part from each lot must be checked before turning in to inspection, and must be marked by sharpie on the inside to identify the checked part. Surface defects such as scratches, gouges, and dents will be checked as well and all dimensions including hole sizes and material thicknesses. Hole sizes small enough to be checked by pin gauge must be checked by pin gauge, all larger holes must be checked with calipers. A hole must always read.001 bellow its maximum call out. For example a hole 4 of 6

that is.110 +/-.003 may take the.112 pin gauge but not the.113 pin gauge. As part of this check the operator is required to initial the part history notes on the work order. Rev F 11.0 Departmental Cleaning During and in-between jobs machines used must be lightly cleaned. This means all FOD, product, tools, and setups, must be removed and put in their designated areas. This cleaning should not exceed more than 5 minutes. The last 15 to 30 minutes on Fridays and when instructed by the line leader, a more in depth cleaning will be completed. This will include removing oxidation from the machines, brushing, blowing, or vacuuming out hard to reach places, empting out catch trays, sweeping or mopping the surrounding floors, and organizing tools at the stations. At the end of each shift ensure all machines and displays are turned off. Make sure all welding cylinders are off and hoses drained. 12.0 Welding Rod Control All welding rod will be kept in individual locked tubes outside of the welding booth. Each tube will be identified by P.O. number, part number, type of rod, and size of rod. Only the line leader and welder/operators will have keys to the locked tubes. Welding rod used by Captor Corporation are as follows: 100-1072-01.062 x 36 4043 Aluminum Rod 100-1072-02.035 x 36 4043 Aluminum Rod 100-1072-03.062 x 36 ER70-6 Carbon Steel Rod 100-1072-04.035 x 36 ER70-6 Carbon Steel Rod 100-1072-05.062 x 36 ER308L Stainless Steel Rod All welding rod P.O. numbers will be documented on the Work Order of the job that is being completed. 13.0 Part Cleaning Cold rolled steel Clean in the Gen-Tech tank before welding. Aluminum Wipe down weld seams with alcohol. Before brazing in inserts, inside corners of cold rolled cans will be blasted with glass bead to remove welding oxidation lines. Remove debris from sandblasting before moving the part to the next step. The outside of all cold rolled cans shall be clean and free of solder flux before next step. Before turning completed cans into inspection all cold rolled cans need to be sprayed inside and outside with WD-40 to prevent cans from rusting. (Ensure that the can is fully covered) 14.0 Resistance Welding Setting up of the spot welder, nugget test, and safety while using the spot welder are all trained and documented per the 100-1122-TL. Users will be trained by the line leader to produce a good spot weld that is round with a light indentation in the center and able to pass nugget test. Any components with safety welds do not have to pass a nugget test. 5 of 6

15.0 Product Priority 15.1 All work orders have a delivery priority marked as (Del). This section projects the priority of that work order against other work orders. Operators must use the information provided by that delivery type to determine which work order to start next. Use document 100-990-00 section 5.2.1.7 to understand these priority value of each of the possible notes. 15.2 Any rework that comes through should be treated as a priority over other work excluding premium work orders. Having a T or R attached to the work order number will identify rework. Other document my accompany or be in place of a traditional work order when working with RMA s. Reference released procedure 100-990-00 section 4.9. 6 of 6