Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Similar documents
ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

East-South HVDC Interconnector II, India : in commercial operation since 2003

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

EH2741 Communication and Control in Electric Power Systems Lecture 2

A cost effective hybrid HVDC transmission system with high performance in DC line fault handling

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two

High Voltage DC Transmission 2

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

1400 MW New Zealand HVDC Upgrade: Introducing Power Modulation Controls and Round Power Mode

U I. HVDC Control. LCC Reactive power characteristics

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

Fundamental Concepts of Dynamic Reactive Compensation. Outline

Wind Power Facility Technical Requirements CHANGE HISTORY

ABB Power Systems AB Sweden

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

High Voltage DC Transmission Prof. Dr. S. N. Singh Department of Electrical Engineering Indian Institute of Technology, Kanpur

SYSTEM STUDIES for HVDC

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

A new control scheme for an HVDC transmission link with capacitorcommutated converters having the inverter operating with constant alternating voltage

New HVDC Interaction between AC networks and HVDC Shunt Reactors on Jeju Converter Stations

ATC s Mackinac Back to Back. Summary

Power Quality enhancement of a distribution line with DSTATCOM

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

OVERVIEW OF SVC AND STATCOM FOR INSTANTANEOUS POWER CONTROL AND POWER FACTOR IMPROVEMENT

DYNAMIC PERFORMANCE OF THE EAGLE PASS BACK-TO-BACK HVDC LIGHT TIE. Å Petersson and A Edris ABB Power Systems AB, Sweden and EPRI,USA

HVDC High Voltage Direct Current

Introduction to HVDC Transmission. High Voltage Direct Current (HVDC) Transmission

Quanta Technology Advancing the Grid. Flexible AC Transmission System (FACTS) BGE Technology - Application Cases January 4, 2008 Q U A N T A SERVI CES

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years

Introduction to HVDC in GB. Ian Cowan Simulation Engineer 12 March 2018

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section SCADA Technical and Operating Requirements

Application of SVCs to Satisfy Reactive Power Needs of Power Systems

ELEMENTS OF FACTS CONTROLLERS

INSTANTANEOUS POWER CONTROL OF D-STATCOM FOR ENHANCEMENT OF THE STEADY-STATE PERFORMANCE

Voltage Source Converter Modelling

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

Power Quality Basics. Presented by. Scott Peele PE

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Acknowledgements Introduction p. 1 Electric Power Quality p. 3 Impacts of Power Quality Problems on End Users p. 4 Power Quality Standards p.

POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS ENGINEERING STANDARDS CITY OF LETHBRIDGE ELECTRIC

HVDC CAPACITOR COMMUTATED CONVERTERS IN WEAK NETWORKS GUNNAR PERSSON, VICTOR F LESCALE, ALF PERSSON ABB AB, HVDC SWEDEN

Assessment of Saturable Reactor Replacement Options

Drives 101 Lesson 3. Parts of a Variable Frequency Drive (VFD)

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:

Improvement of Rotor Angle Stability and Dynamic Performance of AC/DC Interconnected Transmission System

DESIGN CONSIDERATIONS OF ULTRA HIGH VOLTAGE DC SYSTEM

ACS 1000 Transformer Failure Investigation. Nathan Schachter, Peng

UNIT-II REAL POWER FREQUENCY CONTROL. 1. What is the major control loops used in large generators?

B4-203 NELSON RIVER POLE 2 MERCURY ARC VALVE REPLACEMENT

USE OF HVDC MULTI TERMINAL OPTIONS FOR FUTURE UPGRADE OF THE NATIONAL GRID

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

Topics in JNTU Syllabus Modules and Sub Modules Lecture. Basic characteristics L21 T1-Ch4, T2-Ch14 Characteristics. Modification of the control

Dynamic Performance Evaluation of an HVDC Link following Inverter Side Disturbances

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Compensation of Distribution Feeder Loading With Power Factor Correction by Using D-STATCOM

Facilitating Bulk Wind Power Integration Using LCC HVDC

E N G I N E E R I N G M A N U A L

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

Simulation Study of a Monopole HVDC Transmission System Feeding a Very Weak AC Network with Firefly Algorithm Based Optimal PI Controller

MMC Design Aspects and Applications. John Strauss Siemens AG.

FEASIBILITY STUDY REGARDING INTEGRATION OF THE LÆSØ SYD 160 MW WIND FARM USING VSC TRANSMISSION

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India

II. RESEARCH METHODOLOGY

Table of Contents. Introduction... 1

POWER QUALITY ENHANCEMENT BY DC LINK SUPPLIED INDUSTRIAL SYSTEM

Lisbeth Söderling, Power Systems, HVDC Technology Seminar, Addis Ababa, November 2013 HVDC Classic Control and protection. ABB Month DD, YYYY Slide 1

Southern Company Interconnection Requirements for Inverter-Based Generation

Utility Interconnection and System Protection

New Redundant Automatic Voltage Regulator (AVR) Solution

VSC Transmission. Presentation Overview. CIGRE B4 HVDC and Power Electronics HVDC Colloquium, Oslo, April LCC HVDC Transmission

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Designing Of Distributed Power-Flow Controller

Design and Simulation of Passive Filter

Thyristors. In this lecture you will learn the following. Module 4 : Voltage and Power Flow Control. Lecture 18a : HVDC converters.

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Phase Shifting Transformers. Presented by

SRI VIDYA COLLEGE OF ENGG AND TECH

PRUDENT PRACTICES TO IMPROVE POWER FACTOR AND REDUCE POWER LOSS.

ESB National Grid Transmission Planning Criteria

Although shunt capacitors

CHAPTER 4 POWER QUALITY AND VAR COMPENSATION IN DISTRIBUTION SYSTEMS

Insulation Co-ordination For HVDC Station

Impact Assessment Generator Form

Fixed Series Compensation

Enhancement of AC System Stability using Artificial Neural Network Based HVDC System

Voltage and Current Waveforms Enhancement using Harmonic Filters

The University of Nottingham

CHAPTER 5 POWER QUALITY IMPROVEMENT BY USING POWER ACTIVE FILTERS

Joe Warner, Electric Power Industry Conference (EPIC), November 15, 2016 Advances in Grid Equipment Transmission Shunt Compensation

COOPERATIVE PATENT CLASSIFICATION

Protective Relaying for DER

Enhancement of Voltage Stability & reactive Power Control of Distribution System Using Facts Devices

COPYRIGHTED MATERIAL. Index

CERN - ST Division THE NEW 150 MVAR, 18 KV STATIC VAR COMPENSATOR FOR SPS: BACKGROUND, DESIGN AND COMMISSIONING

Tab 2 Voltage Stresses Switching Transients

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

Transcription:

Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22

Why Use HVDC? Fast and accurate control of power transfer not dependent on system angles Interconnection between asynchronous systems Frequency and Voltage independent Provides isolation from system disturbances in other system To transmit large bulk power over a long distance Losses proportional to current squared AC systems also have reactive power & losses Long AC systems use series capacitors to automatically compensate vars This can cause sub-synchronous resonance which can harm machines Line breakers need to have higher ratings for transient recovery voltage DC terminals also have real and reactive power losses but they occur only at the injection points and can be more easily compensated Loss savings for and Cost savings DC vs. AC line losses occurs at long distances 33

Basic Principle AC is converted into DC (Rectifier Side) DC is then converted into AC (Inverter Side) Both use controlled electronic switches (Thyristors) to allow current to flow in a controlled fashion Thyristors turn on (allow current flow) occurs due to a gate pulse and can be delayed but naturally turn-off when current tries to reverse By adjusting firing delay angles of the Thyristors, we can control the magnitude of DC voltage of the rectifier and inverter. The difference of the DC voltages impacts the magnitude of current and power flow Idc=(Vrect-Vinv)/Rdc Pdc=Vdc*Idc The polarity (which side is higher) controls the direction of power flow The converter transformers determine magnitude of the voltage on the dc side and therefore the maximum possible DC voltage Harmonics are produced because of the 12-pulse current steps compared to sinusoidal currents 44

55 Basic Principle Waveform examples Rectifier (AC to DC) 6 pulse, 10 firing angle (15 offset, thyristor off delay) 6 pulse, 40 firing angle, lower DC (and MW) 12 Pulse, 10 firing angle

Back-to-Back Converters Monopolar HVDC connections No DC Transmission Line (just a bus) Both converters are located at the same site Utilize 12-pulse converter units on both the Rectifier and Inverter sides Valves can be located in one Valve hall Option Smoothing Reactor reduces negative sequence coupling 66

HVDC Review What are the reasons HVDC is utilized? Direct accurate Control of power transfer Interconnections between Asynchronous systems Provides isolation from system disturbances Transmission of Bulk power of Long Distances No restrictions on cable length while AC Cables must be less than ~40 km The terms Rectifier & Inverter refer to what functions? A Rectifier converts AC to DC An Inverter converts DC to AC Either converter can be either rectifier or inverter Firing Angle has what impact on the DC and Power Flow? Adjusting the firing delay angle adjusts the magnitude of the DC voltage Magnitude and polarity of the DC voltage affects the magnitude and direction of Power flow 77

Background of the Highgate Converter 225 MW BTB Interconnection between Hydro Quebec and VELCO (both 60 Hz but Asynchronous) Commissioned in 1985 Recognized as the fastest constructed HVDC Substation from Drawing Board to Commissioning Continuous Capacity of 225 MW rated (up to 40 C) Limited to 218 MW due to HQ System until fall of 2014 North AC bus is connected to the HQ System (120kV) South AC bus is connected to the VELCO system (115kV) 88

Basic Ratings of the Converter Continuous Capacity of 225 MW rated (up to 40 C) North to South Requires transformer cooling fans and pumps Requires 4 cooling towers in-service 5 th tower added for redundancy, does not increase power transfer rating Maximum Direct Voltage - 56 kv Minimum Direct Voltage - 32.5 kv (20 MW) Maximum Direct Continuous Current - 4061 A Continuous Capacity of 170 MW rated (up to 40 C) South to North (System not converter constraint) 99

Cooling System 2 closed loop systems separated by dual heat exchangers Fine water (De-ionized, Pure Water) cools the valves Raw water (Propylene Glycol/water) mixture cools the fine water Redundancy in the controls Redundancy of pumps, motors and fans and heat exchangers. 10

Harmonic Filter Banks and additional Capacitor Banks Symmetric filter configuration each side (North & South) 2 11 th /13 th filter (22 / 20 MVAR) 1 HP 25 th filter (22 / 20 MVAR) 1 3 rd /27 th filter (11 / 10 MVAR) Provides harmonic filtering and VAR support for the converters 3 20 (22) MVAR 1 10 (11) MVAR Extra VAR support is needed to avoid drawing vars from the ac systems on both sides (helps maintain voltage) 11

Power Control Mode Keeps DC power equal to the Power Order given by the operator The power order is given by the Operator DC Current is controlled to keep ordered power constant Idc = Pdc/Vdc The power order is set in MW (20 to 225 MW) The power ramp rate is set in MW/min (1 to 30 MW/min) Power modulations are available if enabled 12

Current Control Mode Operates to maintain constant current regardless of the DC Voltage fluctuations The current order is entered by the operator The current order is set in A (360 to 4050 A) The ramp rate is set in A/min (1 to 500 A/min) Power modulations are available if enabled Note VELCO only uses Current control under test mode 13

Highgate Converter Initial Review 14 The facility was commissioned when and to connect who? The facility was commissioned in 1985 to bring power from Hydro Quebec into VELCO s system What are critical components for achieving the full rating? At least 4 out of the 5 radiator towers Transformer fans and pumps available Does the outdoor cooling liquid in the Radiators enter the valve hall to cool the Thyristors? No, the cooling system has 2 loops, Raw water (Propylene Glycol/water) between the radiators and the heat exchanger & Fine water (De-ionized, Pure Water) between the heat exchangers and the valves What are the 2 functions the Filter shunt Capacitor banks perform? The filter capacitors absorb harmonics and provide VAR/Voltage support. The regular capacitors are primarily for VAR/Voltage support.

Starting the Converter Permissions / Steps At least 1 of redundant protection and control systems available/healthy for each system. Tap changer starts in tap position 31 (highest ratio - lowest dc side voltage) AC busses initially isolated by breakers Valve hall grounds need to be removed Once energized with breakers: Tap changers move to regulate dc side transformer voltage to starting condition Minimum filters must be available Thyristors still blocked but available to de-block Converter Ramp Order and Power Order values cannot be changed yet The converter firing pulses will be Deblocked (i.e. released) starts at 20 MW Minimum filters needed for filter performance are automatically connected at deblock 15

Starting the Converter Ramp and Filter/Capacitor Switching System operator selects Ramp Order & Power Order Automatic AC voltage on both sides to a setpoint is provided by adjusting converter var absorption. This can be increased at low power by lowering the dc voltage reference and by firing angle control and by switching in and out filters/capacitor banks Additional minimum filters will close at 35 & 120 MW Capacitor banks will connect or disconnect automatically to maintain desired voltages 16

17 Stopping the Converter Emergency Stop Block thyristor firing pulses Trip & lockout main breakers Normal Stop Ramp down System operator selects ramp order and power order of 20 MW With ramp, filters will open at 100 & 25 MW or with voltage control Other capacitors will open with voltage control Issue Block Command Blocks thyristors Trips minimum filters Operator may manually open main breakers

Changing of Power Direction Automatic Sequence Ramp to Min Power Order Block Converters (The minimum filters remain connected) Reverse Rectifier/Inverter designations Restart the Converters. Due to different firing angles the dc voltage is reversed, current flows in same direction Ramp to new Power Order 18

Runbacks Power Modulated Voltage Controller (PMVC) Runbacks Utilizes a PID Function to constrain DC power transfer if the AC systems cannot maintain voltage above a set-point DC transfer is controlled so AC voltage does not go too low (maximizes energy throughput) Voltage Runbacks When enabled and voltage below set-point for a given time: Quick MW ramp down until voltage is acceptable or MW minimum met Frequency Limiter Runbacks (North only) When enabled and outside frequency band: Ramp speed proportional to frequency deviation 19

Highgate Converter 2nd Review What are some of the required starting conditions of the converter? At least 1 of redundant protection and control systems available/healthy for each system. Transformer Tap changer in position 31 (highest ratio - lowest LV or DC voltage) AC busses initially isolated by breakers Valve hall grounds need to be removed Once transformers are energized with breakers: Tap changers move to regulate LV/dc to starting value, HV must remain within band Minimum filters available Thyristors available to de-block What are the 3 runback schemes? Power Modulated Voltage Control Voltage Runbacks Frequency Runbacks 20

Temporary Blocking Special Control Sequences to allow the converter to ride through faults on North & South lines There are no Operator inputs or adjustments to the North or South Temporary block sequences Separate Temporary Block sequences are provided on the North side and the South sides 21

Temporary Blocking initiation & actions Initiated by a serious voltage drop for a given time Retards firing angle of the rectifier to reduce DC Current toward zero Blocks the faulted-side converter with Bypass Pair Opens faulted-side Main Breakers, but leaves filters and shunts connected Switches the control mode of the unfaulted-side DC converter to AC overvoltage control mode Deblocks the faulted-side converter as an Inverter the unfaulted-side as a Rectifier (if not already that way) After dc voltage is established, fires a bypass on the faulted-side side and circulates current through bypass pairs in the faulted-side as needed to control overvoltage as the unfaulted-side AC Bus to 1.1 pu Maintains the above condition until the faulted-side AC voltage recovers If not recovered within a given timeframe, the converter will trip 22

Temporary Blocking Recovery If the ac voltage recovers, the dc system will automatically be restored back to pre-fault power order Firing angle of the unfaulted-side converter is retarded to bring DC current to zero and the converter is blocked The faulted-side Main breakers are re-closed Power direction is restored to the pre-fault state (rectifier/inverter designations during temporary block may need to be reversed) The pole controls rapidly restore the pre-fault power by adjusting firing angles (no ramping) 23

Temporary Blocking additional initiation Other than voltage other initiating signals may include: Transfer trip signals from other substation protection systems Status indications from other substations for low system strength determination Likewise both voltage recovery and removal of any other initiating condition need to occur to allow recovery from temporary block condition There are some conditions where due to harmonics the system may not be able to restore previous conditions and will instead trip if those conditions are determined by the control system 24

Offline Capacitor Bank Switching Used when Converter offline for extended outage Request for using the capacitor banks for addition MVAR support to the system Allows the use of five of the capacitor banks (3) 20 MVAR banks and (2) 10 MVAR banks for a total of 80 MVARs, 25

Offline Capacitor Bank Switching Mode of operation/switching: Verify that the Converter is stopped Open the Main breaker Place the Filter control to Manual Open the converter Transformer high-side disconnect Need person on site to confirm disconnect is open Enable the Cap bank control Close the Main breaker Dispatch the desired cap/filter banks 26

Offline Capacitor Bank Protections If voltage is above High voltage limit Sequential tripping of capacitor banks Stops when below High voltage limit If voltage is above Very-High voltage limit Faster sequential tripping of capacitor banks Reverts to slower sequential tripping (High voltage mode) when below Very-high voltage limit 27

Highgate Converter Final Review Does the converter trip during a line fault? Generally not unless the ac voltage stays low for a long time. Trick question, some breakers will at least trip temporarily but the system will resume where it left off if the ac voltages recover in time. Otherwise the system will trip if the AC system voltage remains low or some other protection conditions exist Other than voltage what other initiating conditions may cause a temporary block? Transfer trip from other substations Status from other substations that in combination can be determined to be a low short circuit condition Can the north & south capacitor banks be used when the converter is offline? Only the capacitors on one side have been set up in the control system for independent ac bus voltage control while offline 28

29