U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD

Similar documents
A/E/C CAD Standard and A/E/C Graphics Standard Frequently Asked Questions (FAQ) updated 8/9/2017

CHAPTER A-10 DRAWINGS

5.4 TECHNICAL REQUIREMENTS FOR DRAWINGS AND ELECTRONIC DOCUMENT SUBMISSIONS

FACILITIES CADD STANDARD

CMW DELIVERABLES SPECIFICATION Version 1.0

Issue Date: August 2018 Revision: 03

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Vanderbilt University Standard Specification Revised 2/6/08

Greater Toronto Airports Authority CADD Standard Guide

This specification describes the general requirements for Engineering Services provided to Vale.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

DRAWING PROCESS EXTERNAL DRAWINGS

ISO INTERNATIONAL STANDARD. Technical product documentation Digital product definition data practices

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

SECTION SUBMITTAL PROCEDURES

The ASME Y14 Policies

East Central College

D&C-LI. CADD Specification Manual. Version 1.3. Technical Services City of Toronto

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Update: July 20, 2012

January, 2014 Page 1 of 5

Samuel Hudson BIM Support Specialist. Jeff Owens AIA, LEED AP

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

THIS PAGE INTENTIONALLY LEFT BLANK

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

Design, Drawing and Sheet Composition

anual 2010 CADD esign M D

SECTION SUBMITTAL PROCEDURES

Adoption of pipe systems by a GT management of UIP activities

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

ELECTRONIC DRAFTING GUIDELINES

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS

UDS OVERVIEW Uniform Drawing System

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

(R) Aerospace First Article Inspection Requirement FOREWORD

NEW YORK DISTRICT U.S. ARMY CORPS OF ENGINEERS OFFICIAL MANUAL FOR

NTG Technical Drawings

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

8.1 Control. 8.2 Sheet Setup

DOTD Plan Delivery. Baton Rouge, LA February 10, 2009 Presented by Hollis Ward DOTD Design Automation Manager

US Forest Service Standard Trail Plans and Specifications. Step By Step Guide

IGEM/TD/101 Edition 2 Communication 1740 Adoption of pipe systems by a GT management of UIP activities

Bureau of Engineering. CADD Standards. Preface

Section 4: Ontario Realty Corporation CAD Standards and Guidelines

N-Mark Trademark Usage Guidelines for Devices. November 2010

Full Contents. InRoads Essentials

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Miami University. Physical Facilities Department. CAD Standards. April 2004

11.0 INSTRUMENTATION LOOP DIAGRAMS

technical documentation Requirements CAD-Import GEMOS / Checklist CAD-Drawing GEMOS4

NEORSD. Cad Standards and Procedures Manual

Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages

Microstation V8 For Autocad Users By Jeanne Aarhus READ ONLINE

Gippsland Water Drafting Specifications

National BIM Standard - United States Version 3

verticals products support services training community corporate Saving DGN to DWG (with AutoCAD paperspace and viewport compatibility)

COMPUTER AIDED DESIGN STANDARDS AND PRACTICES

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

Final ballot January BOT adoption February 2015

TRAFFIC ENGINEERING DIVISION

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

2. The AB symbol shall be placed beside each As-Built correction on the sheets.

COURSE OUTLINE. Course Number Course Title Credits. Co- or Pre-requisite BCT110 Construction Materials & Methods

New York University University Policies

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

St.Vrain Valley. School District Department of Operations and Maintenance DESIGN CHECKLIST & TECHNICAL GUIDE. Consultant Guide

GSFC CONFIGURATION MANAGEMENT MANUAL

Bentley speedikon V8i

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

LA DOTD Electronic Plans Breaking New Ground

SECTION SUBMITTAL PROCEDURES

Section Table of Contents: Section 12.0

LACCD CADD STANDARDS Revision 3.1

DRAFT V. SITE ELEMENTS SIGNS

California State University, Northridge Policy Statement on Inventions and Patents

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

Drawing Management Standard

Electronic Document Review (EDR)

Road signs Specifications

Full Contents. Survey V8.08 Essentials

City of Los Angeles Department of Building & Safety Disabled Access Section Supplemental Plan Review Checklist No. 2

CONTRA COSTA WATER DISTRICT DRAWING PRODUCTION AND CADD MANUAL TABLE OF CONTENTS SECTION

AutoCAD Drafting Standards

Section Meetings Section Material and Equipment. None Required

State College Area School District

Using BIM to follow up milestones in a project plan during the design phase

1 Higher National Unit credit at SCQF level 7: (8 SCQF credit points at SCQF level 7)

Answer: Qualification statement should be provided with the bid.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

Technology Education Grades Drafting I

CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO.

Transcription:

U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD (FOR USE WITH THE A/E/C CADD STANDARDS RELEASE 4.0) 24 March 2009

26 January 2012 PURPOSE AND SCOPE The purpose of this document is to provide information for the production of CAD design files and CADD models for design files. It acts as a supplement to the A/E/C CADD Standards Release 4.0. It is the intent of this document to do the following: 1. Provide information not covered by A/E/C CADD Standard Release 4.0 for all drawings. 2. Provide clarification or interpretation of A/E/C CADD Standard Release 4.0 for all drawings. 3. Act as a guide for employees of the Albuquerque District Design Branch Team members or entities outside of the Albuquerque District that are performing design work contracted through the Albuquerque District. 4. In a few cases, supersedes the A/E/C CADD Standard whereas the Standard is inappropriate or inadequate for the needs of the Albuquerque District and its various customers. 5. Provides the settings, utilities, resources, and subroutines utilized by Microstation 1 and the Albuquerque District in the production of CADD designs. 6. Aid the user in the implementation of A/E/C CADD Standard for the Albuquerque District Design Branch. 1 MicroStation is the CADD software utilized by the Albuquerque District and is the registered trademark of Bentley Systems Inc. All CADD contract deliverables regardless of origin shall be compatible with the latest version of this software and the latest version of A/E/C CADD Standard and this document. 1

26 January 2012 TABLE OF CONTENTS PURPOSE AND SCOPE 1 TABLE OF CONTENTS 2 PREFACE 3 CHAPTER 1 INTRODUCTION 3 CHAPTER 2 DRAWING FILE ORGANIZATION 3 BUILDING INFORMATION MODELING (BIM) MODEL FILES AND SHEET FILES 3 ELECTRONIC DRAWING FILE NAMING CONVENTIONS 4 Model file naming convention 4 Sheet file naming convention 4 COORDINATION BETWEEN SHEET FILE NAME AND SHEET IDENTIFIER 4 CHAPTER 3 GRAPHIC CONCEPTS 4 Screening 4 Text styles/fonts 4 BORDER SHEETS 5 Title block 5 DRAWING SCALES 5 CHAPTER 4 LEVEL/LAYER ASSIGNMENTS 5 LEVEL/LAYERS 5 Level/layer naming conventions 5 Model Files 6 Reference files (XREFS) 6 CHAPTER 5 STANDARD SYMBOLOGY 6 Deliverables 6 REFERENCE SECTION/DETAIL BUBBLES 6 2

PREFACE This Document will follow as closely as possible the format used by A/E/C CADD Standard. For most of the sections listed in the Table of Contents of this document the A/E/C CADD Standard Release 4.0 will be referenced. It is the responsibility of the user to obtain a copy of this standard. For other sections of this document, the A/E/C CADD Standard will be referenced but supplemental or replacement information as described in the Purpose and Scope statement of this document may be included. The A/E/C CADD Standard may be obtained at http://tsc.wes.army.mil. The Albuquerque District CADD Manager (Lance Faerber, lance.r.faerber@usace.army.mil) and the Project Engineer or the Contracting Official must approve any deviations from this document. CHAPTER 1 INTRODUCTION Please reference A/E/C CADD Standard Chapter 1, pp.1-5. CHAPTER 2 DRAWING FILE ORGANIZATION Please reference A/E/C CADD Standard Chapter 2, pp.6-23. xx## is the root directory and the number will assigned by the Project Manager. All model files (reference files) will be located in this directory. All sheet files are to be located in their respective directories. (xx = project location; ## = project number). BUILDING INFORMATION MODELING (BIM) MODEL FILES AND SHEET FILES Please reference A/E/C CADD Standard Chapter 2, pg. 8. The Design Branch of the Albuquerque District complies strictly with the definitions and use of sheet files and model files as defined in the A/E/C CADD Standard. Each sheet file will have its own electronic file. Having several sheet files in one electronic file will not be permitted. 3

ELECTRONIC DRAWING FILE NAMING CONVENTIONS Please reference A/E/C CADD Standard Release 4.0, Chapter 2, pp. 10-18. Model file naming convention The model file designator shall be in accordance with Table 2-1 Discipline Designators on page 13 and Table 2-2 Model File codes on page 13 (i.e. xx##s-fp.dgn: where xx=project location; ##=project code; s=discipline designator; and fp=model type in this case framing plan). Other model file types are to be named with the designators specified in Tables 2-1 and 2-2. If additional Codes are needed it is up to the user to coordinate with the Albuquerque District CADD Manager and the Project Engineer or the Contracting Officer in selecting and documenting logical codes. Sheet file naming convention The sheet file designator shall be in accordance with Table 2-3 on page 17 (i.e. xx##s-001.dgn: where xx=project location; ##=project code; s=discipline designator; and 001=sheet number). COORDINATION BETWEEN SHEET FILE NAME AND SHEET IDENTIFIER The sheet number in the bottom right hand corner of the title block for each sheet file shall be in numerical order starting with G-001 as the cover sheet file of the project and increasing by a value of one for each subsequent sheet file by discipline. The sheet number for any particular sheet file shall be equal to the sheet designator code and sheet number combined (i.e. for the sheet file named xx##s- 001.dgn the sheet number will be S-001 ). Figure 2-6 pg. 23 (However, the sequence number for S-001 will depend upon the total number of sheets preceding this sheet. The sequence numbers will start at 1 for the cover sheet and continue to the end of the drawing set.) CHAPTER 3 GRAPHIC CONCEPTS Please reference A/E/C CADD Standard Release 4.0, Chapter 3, pp. 24-41. Screening Screening or using gray scales is not permitted by the Albuquerque District. Text styles/fonts For design files the proportional font (Working in MicroStation and Romans in AutoCAD) is sufficient for all text. All text shall be UPPERCASE. For text height/width/lineweight ratios use the following as a guideline (with all values given shown as measured from full-size plot of the sheet file): 1. General text: 1 /8 (.125) x 1 /8 (.125); LW=2 2. Subtitles: 3 /16 (.188) x 3 /16 (.188); LW=2 4

3. Titles: 1 /4 (.250) x 1 /4 (.250); LW=3 Any deviations from the information provided above shall be the approved by the Albuquerque District CADD Manager and the Project Engineer and the Contracting Officer and documentation of the change shall be provided with the design file upon delivery. BORDER SHEETS Title block The Albuquerque District Office will provide a title block with the border in MicroStation or AutoCAD format for every project. The title block will include the Text Style for each portion of the title block. Any deviations shall be approved by the Albuquerque District CADD Manager and Project Engineer and the Contracting Officer and documentation of the change shall be provided with the design file upon delivery. DRAWING SCALES All drawing scales shall be inch-pound measurements. Dual units will not be used. Any deviations shall be approved by the Albuquerque District CADD Manager and Project Engineer and/or the Contracting Officer and documentation of the change shall be provided with the design file upon delivery. CHAPTER 4 LEVEL/LAYER ASSIGNMENTS LEVEL/LAYERS Please reference A/E/C CADD Standard Chapter 4, pp. 42-48. Level/layer naming conventions The Albuquerque District provides Microstation level name tables for each of the design file types listed in the A/E/C CADD Standards Release 4.0 (please reference Appendices A and B of the A/E/C CADD Standards Release 4.0) on the Albuquerque District CADD Standards web page. The Albuquerque District complies with Chapter 4 and related appendices of the A/E/C CADD Standard with limited exceptions, contact the Albuquerque District CADD Manager for details. The leveling schemes suggested shall be followed as closely as possible, but it is recognized that they may be inadequate in some instances. In such cases, additional levels needed shall be added and the change documented by modifying the attached level names table. New Level/layer names shall match the format as shown in the A/E/C CADD Standard. Any deviations shall be the approved by the Albuquerque District CADD Manager and Project Engineer and the Contracting Officer and documentation of the change shall be 5

provided with the design file upon delivery all new level/layers shall follow the format shown in Chapter 4 Level/Layer Assignments. Model Files Please reference A/E/C CADD Standard Chapter 4, pp. 45-48. Reference files (XREFS) Please reference A/E/C CADD Standard Chapter 4, pp. 48 and 49. All Reference (model) files shall be at 1 = 1. Borders shall be scaled up on the Sheet Files to fit around the Reference files. Reference files shall contain graphics with minimal text. The Albuquerque District does not accept design files that do not take full advantage of referencing. CHAPTER 5 STANDARD SYMBOLOGY Please reference A/E/C CADD Standard Chapter 5, pp. 52-53. Deliverables The Albuquerque District does not accept design files that are not compliant with the standards addressed by the A/E/C CADD Standard Release 4.0, the guidelines set forth in the Albuquerque District web page, the scope of work, and this document. Additionally, the Albuquerque District does not accept design files that are not compatible with the current version of MicroStation. MicroStation design files should be reviewed for content and standards compliance prior to the acceptance of the contract drawings. MicroStation design files should be produced along with hard copies of the design drawings. Also the Quality Control Checklist for CADD Files located at http://www.spa.usace.army.mil/ec/cadd/index.htm shall be completed for each discipline and delivered to the Project Manager. Any deviations shall be approved by the Albuquerque District CADD Manager and Project Engineer and the Contracting Officer and documentation of the change shall be provided with the design file upon delivery. REFERENCE SECTION/DETAIL BUBBLES 6

7