Ramp Testing in Identifying and Preventing Insulation Failure

Similar documents
Partial Discharge Theory, Modeling and Applications To Electrical Machines

The Basics of Insulation Testing

Application of Polarisation Depolarisation Current (PDC) technique on fault and trouble analysis of stator insulation

Insulation resistance testing

Characteristics of Insulation Diagnosis and Failure in Gas Turbine Generator Stator Windings

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES

A1-209 EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS

Insulation Testing. Distributor Training Program

Analysis of Partial Discharge Patterns for Generator Stator Windings

RESIDUAL LIFE ASSESSMENT OF GENERATOR TRANSFORMERS IN OLD HYDRO POWER PLANTS

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

Xu Xiao Ming, AP Services, March 2010 Machine services Life expectance analysis program (LEAP)

SURGE ARRESTERS AND TESTING. Keith Hill Doble Engineering Company

Electrical Equipment Condition Assessment

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Insulation Resistance Testing

Insulation resistance testing. A complete solution for every application.

USING DAMPED AC VOLTAGES

Partial discharge diagnostics on very long and branched cable circuits

IMPORTANCE OF INSULATION RESISTANCE

WIRE AND CABLE ENGINEERING GUIDE

MIT510/2, MIT520/2 and MIT1020/2

Specialists in HV and MV test and diagnostics. Testing in Substations

Impulse Testing as a Predictive Maintenance Tool

MIT515, MIT525, MIT1025

FIELD EXPERIENCES USING A PROTOTYPE OPEN CORE RESONATING TRANSFORMER FOR A.C. HIGH POTENTIAL TESTING OF HYDRO-GENERATOR STATORS

The importance of partial discharge testing throughout the development and operation of power transformers

GENERATOR TESTING APPLICATION GUIDE. reliable. precision.

Review of Partial Discharge and Dielectric Loss Tests for Hydropower Generator Bars

Advanced Test Equipment Rentals ATEC (2832)

CASE STUDIES IN ONLINE AND OFFLINE MOTOR ANALYSIS

A1-101 INFLUENCE OF SPECIAL SHORT CIRCUIT ON ELECTRICAL GENERATOR DESIGN. Ding Zhong MENG (HONG KONG, CHINA)

PARTIAL DISCHARGE MEASUREMENT

MD-5060 DIGITAL MEGOHMMETER

The Multi-Technology Approach to Motor Diagnostics

UltraSIL Polymer-Housed Evolution Distribution Class Surge Arrester Certified Test Report

Partial Discharge Patterns in High Voltage Insulation

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

Megohmmeter Model 1060

Fault Zone Analysis: Six Part Series on Identifying Motor Defects

MIT510, MIT520 and MIT1020

Exploring the Necessity of the Hot Hipot Test

Dielectric response and partial discharge measurements on stator insulation at varied low frequency. Nathaniel Taylor

Life Prediction of Mold Transformer for Urban Rail

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

UBZ-301 (63-630A) UNIVERSAL INDUCTION MOTOR PROTECTION UNIT

CONTINUOUS ON-LINE SYSTEM FOR PARTIAL DISCHARGE MONITORING FOR HA1 AT CHE ROBEŞTI

The Vibrator Power Supply

Partial Discharge, Survey or Monitor?

TIGHTENING TORQUE ON WOODEN CORE CLAMP (Nm) (STEEL FASTENER) 1 M M M M M

ArresterFacts-002. Field Testing Arresters ArresterWorks.com. ArresterFacts are information modules pertaining to the arrester world.

Current state of surge testing induction machines

AGN 015 Testing Winding Insulation Systems

MV Power Cable Diagnostics by Frequency Domain Spectroscopy. Peter Werelius Programma Electric AB

Matz Ohlen Director Transformer Test Systems. Megger Sweden

Direct Current Motor Electrical Evaluation Using Motor Circuit Analysis

Sensor Troubleshooting Application Note

Knowledge Is Power SM Apparatus Maintenance and Power Management for Energy Delivery. Application of EMI Diagnostics to Hydro Generators

Hands-On Transformer Testing and Maintenance

Introduction. AC or DC? Insulation Current Flow (AC) 1. TECHNICAL BULLETIN 012a Principles of Insulation Testing. Page 1 of 10 January 9, 2002

Software System for Finding the Incipient Faults in Power Transformers

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM,

SKDG Cable Repair Kit Instructions

Case Studies in On-Line and Off-Line Motor Analysis

Isolation Fault Troubleshooting - Application Note

DEFERRING REPLACEMENT OF A 600 MVA, 345GRD Y/138GRD Y/ 13.8 kv SHELL TYPE WESTINGHOUSE AUTOTRANSFORMER

Insulation Testing Preventing Equipment Breakdown and Plant Shutdowns

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss.

IRIS POWER TGA-B. Periodic Online Partial Discharge Monitoring Instrument for Turbine Generators and Motors

EI HIGH VOLTAGE INSULATION TESTING POLICY

ECP HV INSULATION TESTING

Insulation Resistance Testing Guide

Cholla T809 Condition Assessment Report Provided by students of Northern Arizona University with the support of Arizona Public Service

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol

Analysis Of Induction Motor With Broken Rotor Bars Using Discrete Wavelet Transform Princy P 1 and Gayathri Vijayachandran 2

1.1 STRESSES ACTING ON POWER EQUIPMENT

Copper Core & Coil Transformer

Power Transformer Condition Assessment Based on Standard Diagnosis

IDAX 300 Insulation Diagnostic Analyzer. Dielectric Frequency Response Also known as: Frequency Domain Spectroscopy

Effective maintenance test techniques for power transformers

Insulator Testers Frequently Asked Questions. September Version: 1.1

Fault detection in the manufacturing process of form-wound coils by means of dissipation factor and hipot tests

Insulation resistance testing. A complete solution for every person.

BM25 Automated 5-kV Insulation Tester

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

OUTDOOR VOLTAGE TRANSFORMERS (Indoor units available) Description:

On-line Hydrogenerator Rotor Winding Condition Assessment Using Flux Monitoring. S.R. Campbell, G.C. Stone, M. Krikorian, G.

EM-100 Controller. Installation Precautions. July 2016

THE ELECTROM itig II MOTOR TESTER AND WINDING ANALYZER

Stator Winding Partial Discharge Activity for Air- Cooled Generators

Application Note. Applicable Product: AC Drives

Generator Users Group Annual Conference Core testing, low and high flux, tap. Mladen Sasic, IRIS Power

MOSFET-v. Op Amp Balancing Comparison

Medium Voltage DC Solid State Circuit Protection

LOW VOLTAGE PWM INVERTER-FED MOTOR INSULATION ISSUES

Effective February 2017 Supersedes January 2012 (CP1122)

Transformer Shunt Fault Detection using Two Techniques

A Review of the ALL-TEST IV PRO 2000 and SKF/Baker AWA II

DETECTING SHORTED TURNS

Transcription:

FEATURE Megger Ramp Testing in Identifying and Preventing Insulation Failure By Jeff Jowett THE TESTING OF ELECTRICAL INSULATION has Simply taking a spot resistance reading with a megohmmeter seen the development of numerous specific procedures is often all that is required of a given situation. But at other with the intent of examining and stressing insulation quality times, more exhaustive testing is in order to identify the problem. in different ways in order to call attention to different possi- ble issues and problems. Insulation resistance is, of course, designed to be of a high value in order to keep circuitry isolated from other circuitry and from ground. Over time, just the wear and tear of normal usage will cause insulating material to degrade and reduce its insulating quality. Added to this process are localized and sometimes catastrophic events such as voltage spikes and surges, water ingress and the incursion of contaminants These are typically the bedeviling intermittent faults, where equipment successively runs and trips. An added goal of preventive electrical maintenance is to anticipate such contingencies before they develop and take measures to head them off. Accordingly, numerous procedures have been developed that make use of the insulation tester to give information well beyond the mere resistance number at a given time. By way of quick review, insulation resistance testing is ac- that will both speed and heighten the process of complished by the application of a comparatively high voltage degradation. Consequently, insulation resistance is tested both as a maintenance procedure, to keep equipment within desired operational parameters, and as a troubleshooting function, in response (typically on the order of system-rated to twice system-rated) across a body of insulating material and measuring the amount of current, called leakage, that gets through the material; in to known or suspected problems. essence, going where it s not supposed to go if Continued on page 8 6 Electrical Products & Solutions June 2012

FEATURE Megger Continued from page 6 equipment were operating well. The amount of current is miniscule; micro- or even nano-amps. By the time the natural degradation process has permitted leakage current to reach levels as high as milli-amps, the insulation is breaking down and soon will no longer be doing its job. On a 120V circuit, the human body normally begins to fell a tingle at about half a milli-amp. One of the fundamental test procedures developed early in the use of megohmmeters (circa 1950) is the familiar and popular Step Voltage Test. Put simply, this is an examination of the response of the insulating material, in terms of resistance, to increasing voltage stress. Within broad parameters, good insulation should be able to stand up to increases in voltage. But if the material is deteriorated, each voltage increase will exploit additional leakage paths by pulling current through more and more cracks, burn tracks, water trees and the like. As voltage increases, current increases, and resistance drops accordingly. As the testers themselves have developed over the years, the implementation of this test has become simpler. As long as more than one test voltage is available, a simple Step Voltage Test can be performed manually. But modern testers have multi-voltage selection that reads directly, without having to adjust the reading to the voltage as was necessary with older models. Such units can easily perform the test manually, by turning the selector switch, noting the time and marking down measurements. Even more advanced megohmmeters do the whole thing automatically. Typically, only the voltage ceiling need be selected and the Step Voltage mode engaged, and such models will run the test automatically, displaying all relevant data at the conclusion. Accordingly, an industry-standard procedure has evolved where five successive voltages are applied for one minute each. If a 5 kv ceiling is selected, the test will run at 1, 2, 3, 4, and 5 kv for one minute each, a total of a five-minute test. As always with insulation resistance testing, comparison to previous results is the best evaluation, but for sake of perspective, a general rule is that more than a 25% change indicates an excess of contaminants (Fig. 1). One of the principle values of this test is that it can reveal problems that may have been overlooked in the results of other tests. An example is the single point of localized damage in otherwise good insulation. A voltage spike may have caused a pinhole. With air (a good insulator) now filling the space previously occupied by insulating material, a spark gap exists that may go unnoticed by a simple resistance With insulation resistance testing, a general rule is that more than a 25% change indicates an excess of contaminants. measurement. This can also be the source of an aggravating intermittent failure problem. But the Step Voltage Test may well arc the spark gap and expose the flaw. Similarly, aged insulation, by virtue of drying out, may yield a deceptively high value against a single resistance test. But such material often has cracks and similar flaws that make the equipment poised on the verge of breakdown. A Step Voltage Test will pull more current through more of these Figure 1 flaws with each increase, and readily reveal an impending failure. The increasing sophistication of modern megohmmeters has led to a refinement of the Step Voltage concept to a whole other level, the Ramp Test. Rather than increasing test voltage in discrete jumps (industry standard are 500 V and 1 kv increments), the ramp test applies voltage in a continuous increase at a constant rate, up to the selected maximum. The response of the insulating material to voltage can be assessed in a much subtler and more detailed manner, without the jarring effects of quantum leaps. Small defects can be detected more readily, and equipment that is on the verge of breakdown can be analyzed without risking damage. Leakage current is graphed continuously against voltage rise. Normally, the relationship would be expected to be linear, but if current begins to rise more sharply, the material is breaking down and the test can be terminated prior to the occurrence of full breakdown. Continued on page 12 8 Electrical Products & Solutions June 2012

FEATURE Megger Continued from page 8 Figure 2 Figure 3 The Ramp Test has been evaluated by standards agencies, and is described in IEEE 95-2002, The IEEE Recommended practice for insulation testing of AC electric machinery (2300 V and above) with high direct voltage. The recommended rate of voltage rise from the standard is 1 kv per minute. Some testers may also permit adjustment of this rate. The IEEE standard conveniently provides graphs of current curves of typical problems, for comparison of test results. Defects like cracks, voids, delamination, moisture ingress, surface contamination and uncured resin may all be detected. The IEEE has recommended the method especially for epoxy-mica, polyester, and asphalt ma- Figure 4 terials. (The standard also prescribes that the equipment under test be first subjected to an insulation resistance or Polarization Index test according to IEEE 43-2000 so as to assure that the equipment is suitable for higher voltage testing.) The evaluation of test results first prescribes that insulation in good condition should produce a smooth, almost linear rising current curve against the applied voltage. Any deviation should be viewed as a warning that the test could be approaching a possible breakdown. A sudden increase in current usually indicates imminent breakdown, and it has been possible to approach as closely as 5% below breakdown voltage. An abrupt drop in current is rare, but if it occurs when test voltage is above peak operating voltage, it can also be an indication of imminent breakdown. Comparing the curves of asphalt-mica to epoxymica shows that asphalt-mica has a higher level of absorption current, resulting in a steeper curve. But both produce clean, linear graphs when in good condition (Figs 2 & 3). By contrast, insulation having absorbed moisture produces a sharp rise in current, and the test would have been stopped (Fig. 4). Old asphalt may produce a slightly non-linear response showing small deviations as blips, whereas significant localized weaknesses will show a sudden, larger increase (Fig. 5). The test would be terminated as the graph approached vertical. Cracks in ground wall insulation will show a sudden near-vertical rise, often preceded by small spikes (Fig. 6). It is also useful to compare the current curves from different phases. Continued on page 14 Figure 5 Figure 6 12 Electrical Products & Solutions June 2012

FEATURE Megger Continued from page 12 Figure 7 Figure 8 All three should provide comparable results. A phase that shows a different response usually indicates a problem with insulation condition (Fig. 7). Among the ticklish problems that this technique has been successfully used to identify are tape separation, end-arm partial discharge and contamination, delamination and lack of resin cure. As an example, an 11 kv 21 MVA hydro transformer installed in 1928 was tested and yielded an acceptable PI of 3.8 on asphalt-mica insulation. A simultaneous ramp test graph, how- ever, showed instability as low as 5 kv (Fig. 8). The winding was prone to overheating due to the cooling ducts in the core becoming blocked by oily dirt. The stator was eventually rewound. Similarly, tests were made on an asphalt-mica-insulated 13.8 kv winding of a hydro generator installed in 1961. After 37 years in service, repairs were made near the stator frame, and involved the use of water. Testing revealed leakage current in excess (Fig. 9), and a dry-out did not improve the measurements. The results of partial discharge and ramp tests Continued on page 16 FOR FREE INFO, CIRCLE 40 ON READER SERVICE CARD 14 Electrical Products & Solutions June 2012

FEATURE Megger Continued from page 14 Figure 9 Figure 10 suggested the loss of a bond between layers of mica tape. A rewind was finally performed, with a rating increase from 37.5 to 50 MVA. Another example is that of a 13.8 kv roebel bar winding in a hydro generator that was not ramp tested upon installation. Ramp testing was performed shortly after the results of 3 and 1 short circuit tests (Fig. 10), and physical damage in the end arm area was suspected. This proved not to be the case, and a ramp test still showed leakage 2 years later. But after another 5 years, the condition had disappeared. The conclusion was that test results reflected the curing of epoxy-mica. In such manner, ramp test results are a useful tool in clarifying vague or conflicting data from other tests, and in identifying specific problems on equipment known to be faulted yet showing acceptable results against other procedures. Source of information and examples: W. McDermid & J. C. Bromley, Manitoba Hydro, The Ramp Test Its Origins, Development and Application, IEEE Transactions on Dielectrics and Electrical Insulation, Vol. 17, No. 5, Oct. 2010. FOR FREE INFO, CIRCLE 41 ON READER SERVICE CARD 16 Electrical Products & Solutions June 2012